{"id":55726,"date":"2016-07-25T19:23:49","date_gmt":"2016-07-25T16:23:49","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=55726"},"modified":"2016-07-25T19:23:49","modified_gmt":"2016-07-25T16:23:49","slug":"elektrik-kesinti-endeksinde-en-karanlik-olan-ay-haziran-oldu","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/elektrik-kesinti-endeksinde-en-karanlik-olan-ay-haziran-oldu\/","title":{"rendered":"(Turkish) Elektrik Kesinti Endeksi\u2019nde En Karanl\u0131k Olan Ay Haziran Oldu!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/55726\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<p class=\"selectionShareable\" style=\"color: #0a0a0a;\"><strong>T\u00fcketici Birli\u011fi Federasyonu Elektrik Kesinti Endeksi (EKE) \u00c7al\u0131\u015fma Grubu\u2019nun haziran ay\u0131 de\u011ferlendirmesinde Ba\u015fkent Ankara, 4 bin 330 saatlik kesintiyle en y\u00fcksek kesintinin ya\u015fand\u0131\u011f\u0131 ikinci il oldu. Grup Ba\u015fkan\u0131 Jale Yan\u0131lmaz, \u201cHaziran, Ba\u015fkent\u2019te ilk yar\u0131 y\u0131l\u0131n en karanl\u0131k ay\u0131 oldu\u201d diye konu\u015ftu.<\/strong><span id=\"more-82519\"><\/span><\/p>\n<p class=\"selectionShareable\" style=\"color: #0a0a0a;\">T\u00fcrkiye\u00a0genelindeki e<img loading=\"lazy\" class=\"alignleft size-medium wp-image-37214\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/03\/elektrik-kesintisi-232982389033-300x150.jpg\" alt=\"elektrik-kesintisi-232982389033\" width=\"300\" height=\"150\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/03\/elektrik-kesintisi-232982389033-300x150.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/03\/elektrik-kesintisi-232982389033-500x249.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/03\/elektrik-kesintisi-232982389033-80x40.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/03\/elektrik-kesintisi-232982389033.jpg 870w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>lektrik kesintilerini ay baz\u0131nda de\u011ferlendiren ve y\u0131ll\u0131k rapor haz\u0131rlayan T\u00fcketici Birli\u011fi Federasyonu Elektrik Kesinti Endeksi (EKE) \u00c7al\u0131\u015fma Grubu, 2016 haziran ay\u0131 Elektrik Kesinti Endeksi (EKE) verilerini a\u00e7\u0131klad\u0131. Endekse g\u00f6re Ba\u015fkent Ankara, 4 bin 330 saatlik kesinti ile \u0130zmir\u2019den sonra en y\u00fcksek kesintinin ger\u00e7ekle\u015fti\u011fi ikinci il oldu. May\u0131s<br \/>\nay\u0131ndaki kesinti saati ise bin 778 saatti. Endeks verilerine g\u00f6re haziran ay\u0131nda bir \u00f6nceki aya g\u00f6re 2 kat\u0131ndan daha fazla kesinti ya\u015fand\u0131.<\/p>\n<p class=\"selectionShareable\" style=\"color: #0a0a0a;\"><strong>EN Y\u00dcKSEK KES\u0130NT\u0130 HAZ\u0130RANDA<\/strong><\/p>\n<p class=\"selectionShareable\" style=\"color: #0a0a0a;\">Elektrik enerjisi hizmetine ili\u015fkin hizmet kalitesinin tespitine y\u00f6nelik 2015\u2019in mart ay\u0131ndan bu yana, \u2018Elektrik Kesinti Endeksi (EKE)\u2019 olu\u015fturarak kamuoyuyla payla\u015ft\u0131klar\u0131n\u0131 belirten T\u00fcketici Birli\u011fi Federasyonu Elektrik Kesinti Endeksi (EKE) \u00c7al\u0131\u015fma Grubu Ba\u015fkan\u0131 Jale Yan\u0131lmaz \u015f\u00f6yle konu\u015ftu: \u201cHaziran Ba\u015fkent\u2019te ilk yar\u0131y\u0131l\u0131n en karanl\u0131k ay\u0131 oldu. Ankara\u2019n\u0131n elektrik kesinti seviyesi ocaktan bu yana di\u011fer aylara g\u00f6re haziran ay\u0131nda \u00e7ok y\u00fckseldi. Ba\u015fkent Elektrik Da\u011f\u0131t\u0131m A\u015e\u2019nin hizmet verdi\u011fi di\u011fer illere g\u00f6re kesintilerin a\u011f\u0131rl\u0131\u011f\u0131 Ankara\u2019da ya\u015fan\u0131yor. Neredeyse iki kat\u0131na kadar yakla\u015fm\u0131\u015f. Haziran ilk yar\u0131 y\u0131l\u0131n en karanl\u0131k ay\u0131 oldu. T\u00fcrkiye genelinde de b\u00f6yle.<\/p>\n<p class=\"selectionShareable\" style=\"color: #0a0a0a;\"><strong>PLANLI KES\u0130NT\u0130LER BAZ ALINIYOR<\/strong><\/p>\n<p class=\"selectionShareable\" style=\"color: #0a0a0a;\">Endeks \u00e7al\u0131\u015fmas\u0131na 2015 y\u0131l\u0131n\u0131n mart ay\u0131nda ba\u015flad\u0131k. \u00c7al\u0131\u015fmalardaki veriler tamamen planl\u0131 kesintilerden olu\u015fuyor. Plans\u0131z kesintileri kapsam\u0131yor. Elektrik da\u011f\u0131t\u0131m firmalar\u0131n\u0131n yasal olarak ilan ettikleri g\u00fcnl\u00fck veriler toplanarak ayl\u0131k bir endeks olu\u015fturuluyor. Firmalar planl\u0131 kesintiler i\u00e7in bak\u0131m onar\u0131m tesislerinin yenilenmesinin yap\u0131ld\u0131\u011f\u0131n\u0131 beyan ediyorlar. Biz de bu kapsamda sivil bir denetim olu\u015fturuyoruz. Vatanda\u015flardan kesintilerle ilgili \u00e7ok s\u0131k \u015fikayet al\u0131nca b\u00f6yle bir denetim olu\u015fturmak istedik. Firmalar ger\u00e7ekten yat\u0131r\u0131m m\u0131 yap\u0131yorlar. Kesintilerin ger\u00e7eklik pay\u0131 nedir, manip\u00fclasyon var m\u0131, bu kesintiler ger\u00e7ekten alt yap\u0131 i\u00e7in mi yap\u0131l\u0131yor bu hususlar\u0131n denetimini yap\u0131yoruz. \u0130lgili \u015firketlere y\u0131ll\u0131k raporu g\u00f6nderiyoruz. \u015eirketlerden bize geri d\u00f6n\u00fc\u015fler de oluyor.\u201d<\/p>\n<p class=\"selectionShareable\" style=\"color: #0a0a0a;\"><strong>EN D\u00dc\u015e\u00dcK \u015eUBAT\u00a0EN Y\u00dcKSEK HAZ\u0130RAN<\/strong><\/p>\n<p class=\"selectionShareable\" style=\"color: #0a0a0a;\">T\u00fcketici Birli\u011fi Federasyonu Elektrik Kesinti Endeksi (EKE) verilerine g\u00f6re Ankara\u2019da 2016 y\u0131l\u0131n\u0131n ilk alt\u0131 ay\u0131ndaki kesinti saatleri \u015f\u00f6yle oldu:<br \/>\nOcak: 1.170<br \/>\n\u015eubat: 794<br \/>\nMart: 1.020<br \/>\nNisan: 1.576<br \/>\nMay\u0131s: 1.778<br \/>\nHaziran: 4.330<\/p>\n<p class=\"selectionShareable\" style=\"color: #0a0a0a;\">Yazan: Murak Y\u0131lmaz<\/p>\n<p class=\"selectionShareable\" style=\"color: #0a0a0a;\">Kaynak:\u00a0<a style=\"color: #1e73be;\" href=\"http:\/\/www.hurriyet.com.tr\/en-karanlik-ay-40166987\" target=\"_blank\" rel=\"nofollow\">H\u00fcrriyet<\/a><\/p>\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. T\u00fcketici Birli\u011fi Federasyonu Elektrik Kesinti Endeksi (EKE) \u00c7al\u0131\u015fma Grubu\u2019nun haziran ay\u0131 de\u011ferlendirmesinde Ba\u015fkent Ankara, 4 bin 330 saatlik kesintiyle en y\u00fcksek kesintinin [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":37214,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53],"tags":[30801,68,61,19638,23814,11276,1451,2873,30802,63,67,1009,2698,165,7096,30803,21176],"views":695,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/55726"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=55726"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/55726\/revisions"}],"predecessor-version":[{"id":55727,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/55726\/revisions\/55727"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/37214"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=55726"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=55726"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=55726"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}