{"id":55653,"date":"2016-07-23T16:55:56","date_gmt":"2016-07-23T13:55:56","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=55653"},"modified":"2016-07-23T16:57:03","modified_gmt":"2016-07-23T13:57:03","slug":"gamesa-cine-48-mwlik-ruzgar-turbini-saglayacak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/gamesa-cine-48-mwlik-ruzgar-turbini-saglayacak\/","title":{"rendered":"(Turkish) Gamesa \u00c7in&#8217;e 48 MW&#8217;l\u0131k R\u00fczgar T\u00fcrbini Sa\u011flayacak!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/55653\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Gamesa, \u00c7in\u2019de Datang taraf\u0131ndan kurulacak olan Sanlengshan R\u00fczgar \u00c7iftli\u011fi\u2019ne 48 MW g\u00fcc\u00fcnde 24 adet r\u00fczgar t\u00fcrbini sa\u011flayacak.<br \/>\n<\/strong><\/p>\n<p>\u00c7in&#8217;in Sanlengshan r\u00fczgar \u00e7ift<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/11\/alternatif-enerji-ruzgar-turbini-500x500_c.jpg\"><img loading=\"lazy\" class=\"alignleft  wp-image-46905\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/11\/alternatif-enerji-ruzgar-turbini-500x500_c-300x300.jpg\" alt=\"alternatif-enerji-ruzgar-turbini-500x500_c\" width=\"300\" height=\"189\" \/><\/a>li\u011fine kurulmas\u0131 planlanmakta olan toplam 48 MW&#8217;l\u0131k 24 adet r\u00fczgar t\u00fcrbini i\u00e7in, 22 y\u0131ld\u0131r faaliyet g\u00f6steren ve 55 farkl\u0131 \u00fclkede toplam 35.2 bin MW&#8217;l\u0131k kurulu g\u00fcce sahip olan Gamesa firmas\u0131 ile anla\u015fmaya var\u0131ld\u0131.<\/p>\n<p>Yap\u0131lan anla\u015fma ile Gamesa, \u00c7in&#8217;in kuzey do\u011fusundaki Liaoning b\u00f6lgesine 2 MW&#8217;l\u0131k G97 model t\u00fcrbinler g\u00f6nderecek. Gamesa&#8217;n\u0131n tedarik edece\u011fi t\u00fcrbinlerle olu\u015fturulacak Sanlengshan R\u00fczgar \u00c7iftli\u011fi&#8217;nin bu y\u0131l\u0131n sonuna kadar\u00a0da devreye al\u0131nmas\u0131 planlanmaktad\u0131r.<\/p>\n<p>Bu r\u00fczgar \u00e7iftli\u011fi \u00c7in&#8217;in en b\u00fcy\u00fck \u00f6l\u00e7ekli elektrik \u00fcretim \u015firketlerinden birisi olan Datang taraf\u0131ndan geli\u015ftirilmektedir.\u00a0Datang ve Gamesa aras\u0131nda daha \u00f6nceden de yakla\u015f\u0131k olarak 200 MW b\u00fcy\u00fckl\u00fc\u011f\u00fcnde r\u00fczgar t\u00fcrbini tedarik anla\u015fmas\u0131 imzalanm\u0131\u015ft\u0131.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Gamesa, \u00c7in\u2019de Datang taraf\u0131ndan kurulacak olan Sanlengshan R\u00fczgar \u00c7iftli\u011fi\u2019ne 48 MW g\u00fcc\u00fcnde 24 adet r\u00fczgar t\u00fcrbini sa\u011flayacak. \u00c7in&#8217;in Sanlengshan r\u00fczgar \u00e7iftli\u011fine kurulmas\u0131 planlanmakta [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":46905,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,50],"tags":[886,30789,68,63,67,1009,2698,165,7767,474,69,2511,231,324],"views":1407,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/55653"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=55653"}],"version-history":[{"count":3,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/55653\/revisions"}],"predecessor-version":[{"id":55657,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/55653\/revisions\/55657"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/46905"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=55653"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=55653"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=55653"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}