{"id":5521,"date":"2013-01-23T11:08:09","date_gmt":"2013-01-23T08:08:09","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=5521"},"modified":"2013-01-23T11:08:09","modified_gmt":"2013-01-23T08:08:09","slug":"turkiyenin-gunesine-yatirim-yapacak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/turkiyenin-gunesine-yatirim-yapacak\/","title":{"rendered":"(Turkish) T\u00fcrkiye&#8217;nin G\u00fcne\u015fine Yat\u0131r\u0131m Yapacak"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/5521\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Kuveytli yat\u0131r\u0131m \u015firketi Aswar Group, G\u00fcney Koreli \u00fc\u00e7 \u015firketle santral kuruyor.<\/strong><\/p>\n<p><img loading=\"lazy\" class=\"alignleft size-medium wp-image-5522\" title=\"turkiye-nin-gunesi-ne-yatirim-yapacak\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/01\/turkiye-nin-gunesi-ne-yatirim-yapacak-300x186.jpg\" alt=\"\" width=\"300\" height=\"186\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/01\/turkiye-nin-gunesi-ne-yatirim-yapacak-300x186.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/01\/turkiye-nin-gunesi-ne-yatirim-yapacak-500x310.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/01\/turkiye-nin-gunesi-ne-yatirim-yapacak-80x50.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/01\/turkiye-nin-gunesi-ne-yatirim-yapacak.jpg 898w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>\u0130n\u015faat ve gayrimenkul sekt\u00f6rlerinde faaliyet g\u00f6steren Kuveytli yat\u0131r\u0131m \u015firketi Aswar Group, T\u00fcrkiye&#8217;de g\u00fcne\u015f enerjisine yat\u0131r\u0131m yapacak. Aswar Group&#8217;un T\u00fcrkiye&#8217;de kurdu\u011fu As Yat\u0131r\u0131m&#8217;\u0131n orta\u011f\u0131 ve CEO&#8217;su U\u011fur Akku\u015f, G\u00fcney Koreli CX Concentrix Solar Korea, KEPCO ve Kincoa ile 150 MW&#8217;l\u0131k g\u00fcne\u015f santrali kurmak i\u00e7in s\u00f6zle\u015fme imzalad\u0131klar\u0131n\u0131 s\u00f6yledi. T\u00fcrkiye&#8217;de 18 b\u00f6lgede \u00f6l\u00e7\u00fcm \u00e7al\u0131\u015fmalar\u0131 yap\u0131p, 20 lokasyon i\u00e7in lisans ba\u015fvurusunda bulunacaklar\u0131n\u0131 anlatan Akku\u015f, 450 milyon dolara mal olacak yat\u0131r\u0131m\u0131n 5 y\u0131l i\u00e7inde hayata ge\u00e7ece\u011fini kaydetti.<\/p>\n<p>Yat\u0131r\u0131m i\u00e7in gereken paran\u0131n b\u00fcy\u00fck bir b\u00f6l\u00fcm\u00fcn\u00fcn K\u00f6rfez&#8217;den ve K\u00f6rfez bankalar\u0131ndan al\u0131nan kredilerle sa\u011flanaca\u011f\u0131n\u0131 vurgulayan Akku\u015f &#8220;Finansman paketinin i\u00e7inde G\u00fcney Koreliler de olacak. G\u00fcney Kore&#8217;deki \u015firketi burada ayn\u0131 zamanda EPC m\u00fcteahhitli\u011fi yapacak, finansman konusunda da destek sunacak&#8221; dedi.\u00a0<strong> <\/strong><\/p>\n<p><strong>&#8216;YATIRIM M\u0130KTARI \u0130K\u0130YE KATLANAB\u0130L\u0130R&#8217;<\/strong><\/p>\n<p>Akku\u015f, g\u00fcne\u015f enerjisindeki yat\u0131r\u0131mlar\u0131n\u0131 \u015fartlar\u0131n el vermesi halinde 150 MW&#8217;tan 300 MW&#8217;a, yat\u0131r\u0131m miktar\u0131n\u0131 da 900 milyon dolara kadar \u00e7\u0131karabileceklerini vurgulad\u0131. Jeotermal enerji ile de ilgilendiklerini ifade eden Akku\u015f, yenilenebilir enerji sekt\u00f6r\u00fcnde lisans alan satan ki\u015filerle g\u00f6r\u00fc\u015fme halinde olduklar\u0131n\u0131 belirtti.<\/p>\n<p>Kaynak: <a href=\"http:\/\/ekonomi.haberturk.com\/enerji\/haber\/788900-turkiyenin-gunesine-yatirim-yapacak\" target=\"_blank\">Haberturk<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Kuveytli yat\u0131r\u0131m \u015firketi Aswar Group, G\u00fcney Koreli \u00fc\u00e7 \u015firketle santral kuruyor. \u0130n\u015faat ve gayrimenkul sekt\u00f6rlerinde faaliyet g\u00f6steren Kuveytli yat\u0131r\u0131m \u015firketi Aswar Group, T\u00fcrkiye&#8217;de [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":5522,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[1955,1956,67,13,1957,1958,1959],"views":682,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/5521"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=5521"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/5521\/revisions"}],"predecessor-version":[{"id":5523,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/5521\/revisions\/5523"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/5522"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=5521"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=5521"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=5521"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}