{"id":55188,"date":"2016-07-11T00:37:19","date_gmt":"2016-07-10T21:37:19","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=55188"},"modified":"2016-07-11T00:37:59","modified_gmt":"2016-07-10T21:37:59","slug":"almanyanin-yenilenebilir-enerji-kanununda-yeni-bir-duzenleme-yapildi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/almanyanin-yenilenebilir-enerji-kanununda-yeni-bir-duzenleme-yapildi\/","title":{"rendered":"(Turkish) Almanya\u2019n\u0131n Yenilenebilir Enerji Kanununda Yeni Bir D\u00fczenleme Yap\u0131ld\u0131&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/55188\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>\u00a0Yenilenebilir enerjide k\u00fcresel \u00f6l\u00e7ekteki \u00f6nemli akt\u00f6rlerinden birisi olan\u00a0Almanya, mevzuatta k\u00f6kl\u00fc de\u011fi\u015fiklikler getiren d\u00fczenlemeleri\u00a0oy \u00e7oklu\u011fu ile onaylad\u0131.<\/strong><\/p>\n<p><strong>Almanya\u2019n\u0131n Yenilenebilir Enerji D\u00fczenlemesinde Yer Alan <span style=\"text-decoration: underline;\">\u00d6nemli Sat\u0131r Ba\u015flar\u0131:<\/span><\/strong><\/p>\n<p>&#8211; 750 kW \u00fczeri b\u00fct\u00fcn GES (Arazi ve \u00c7at\u0131), RES (Kara ve Deniz) ihale ile verilecek. Biok\u00fctle de bu rakam 150 kW<\/p>\n<p>&#8211; G\u00fcne\u015f Enerjisinde y\u0131lda 3 tane 200\u2019er MW hacminde ihale yap\u0131lacak. \u0130haleye Teklif verilebilinecek maksimum GES Proje b\u00fcy\u00fckl\u00fc\u011f\u00fc 10 MW ge\u00e7emeyecek.<img loading=\"lazy\" class=\"alignright size-medium wp-image-46539\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/11\/r\u00fczgar-g\u00fcne\u015f-yenilenebilir-enerji-2398323-696x385-300x165.jpg\" alt=\"r\u00fczgar-g\u00fcne\u015f-yenilenebilir-enerji-2398323-696x385\" width=\"300\" height=\"165\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/11\/r\u00fczgar-g\u00fcne\u015f-yenilenebilir-enerji-2398323-696x385-300x165.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/11\/r\u00fczgar-g\u00fcne\u015f-yenilenebilir-enerji-2398323-696x385-500x276.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/11\/r\u00fczgar-g\u00fcne\u015f-yenilenebilir-enerji-2398323-696x385-80x44.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/11\/r\u00fczgar-g\u00fcne\u015f-yenilenebilir-enerji-2398323-696x385.jpg 696w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/p>\n<p>&#8211; R\u00fczgar Enerjisinde Kara da y\u0131lda 3 veya 4 ihale ile verilecek lisanslar\u0131n y\u0131ll\u0131k toplam hacmi 2.800 MW ve Deniz de y\u0131lda bir sefer 730 MW hacminde ihale yap\u0131lacak.<\/p>\n<p>&#8211; Biok\u00fctle de 2017-2019 aras\u0131 150 MW ve 2020-2022 aras\u0131 200 MW y\u0131lda bir sefer yap\u0131lacak ihale ile verilecek.<\/p>\n<p>&#8211; GES ihalesinde, ihalede verilebilinecek \u00fcst s\u0131n\u0131r fiyat teklifi olarak kilovat saat ba\u015f\u0131na 8,91 \u20accent. Birinci ihaleden sonra bu rakam her ay y\u00fczde 0,5 d\u00fc\u015fecek.<\/p>\n<p>&#8211; Biok\u00fctle de ihale de verilebilecek \u00fcst s\u0131n\u0131r fiyat teklifi olarak 14,88 \u20accent \/ kWh, bu rakam her y\u0131l y\u00fczde 1 d\u00fc\u015fecek.<\/p>\n<p>&#8211; RES (Deniz) de ihale de verilebilecek \u00fcst s\u0131n\u0131r fiyat teklifi olarak 12,00 \u20accent \/ kWh ve RES (Kara) da bu rakam 7,00 \u20accent \/ kWh ba\u015f\u0131na. Federal \u015eebeke Ajans\u0131 her y\u0131l yap\u0131lacak piyasa ve maliyet analizine g\u00f6re bu rakamlar\u0131 her y\u0131l y\u00fczde 10 yukar\u0131 veya a\u015fa\u011f\u0131 \u00e7ekme hakk\u0131 bulunuyor.<\/p>\n<p>&#8211; 750 kW alt\u0131 \u201c\u0130hallesiz\u201d GES projelerinde fiyat belirlenmesi arazi ve \u00e7at\u0131 olarak ikiye ayr\u0131lm\u0131\u015ft\u0131r. Arazi GES \u2018lerde bu rakam (1-750 KW) kilovat saat ba\u015f\u0131na 8,91 \u20accent. \u00c7at\u0131 GES\u2019lerde (&lt;10 kW) 12,70 \u20accent\/kWh, (&lt;40 kWh) 12,36 \u20accent\/kWh ve (&lt;750 kW) 11,09 \u20accent\/kWh. B\u00fcy\u00fck projeler deki gibi 750 kW a kadar GES\u2019lerde de her ay bu rakam y\u00fczde 0,5 basamak basamak d\u00fc\u015f\u00fcr\u00fclecek.<\/p>\n<p>&#8211; 750 kW alt\u0131 \u201c\u0130hallesiz\u201d RES\u2019lerde 7,00 \u20accent\/kWh ve 150 kW alt\u0131 \u201c\u0130halesiz\u201d Biok\u00fctle de 14,88 \u20accent\/kWh. RES ve BES lerde de fiyatlar her y\u0131l b\u00fcy\u00fck projelerdeki gibi basamak basamak d\u00fc\u015f\u00fcr\u00fclecek.<\/p>\n<p>&#8211; Devlet al\u0131m garantisi b\u00fct\u00fcn yenilenebilir enerji kaynaklar\u0131 i\u00e7in <strong>20 y\u0131l<\/strong><\/p>\n<p>&#8211; Enerji Kooperatif Projelerinde; ihaleye kat\u0131lan ve ihaleyi kazanma durumunda hisselerin <strong>y\u00fczde 10 luk b\u00f6l\u00fcm\u00fc<\/strong>\u00a0Belediyelere teklif edilmesi gerekecek.<\/p>\n<p>Haberin <a href=\"http:\/\/www.enerjigunlugu.net\/icerik\/19075\/almanyada-yenilenebilir-enerji-kanunu-yenilendi.html\" target=\"_blank\" rel=\"nofollow\">Devam\u0131 \u0130\u00e7in TIKLAYINIZ&gt;&gt;&gt;<\/a><\/p>\n<p>Kaynak: Enerji G\u00fcnl\u00fc\u011f\u00fc<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.\u00a0Yenilenebilir enerjide k\u00fcresel \u00f6l\u00e7ekteki \u00f6nemli akt\u00f6rlerinden birisi olan\u00a0Almanya, mevzuatta k\u00f6kl\u00fc de\u011fi\u015fiklikler getiren d\u00fczenlemeleri\u00a0oy \u00e7oklu\u011fu ile onaylad\u0131. Almanya\u2019n\u0131n Yenilenebilir Enerji D\u00fczenlemesinde Yer Alan \u00d6nemli [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":46539,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49,50],"tags":[929,30586,30585,63,67,1009,2698,165,2326,227,13,474,69,16,3497,4198,105],"views":1137,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/55188"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=55188"}],"version-history":[{"count":2,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/55188\/revisions"}],"predecessor-version":[{"id":55190,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/55188\/revisions\/55190"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/46539"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=55188"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=55188"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=55188"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}