{"id":54344,"date":"2016-06-20T12:00:47","date_gmt":"2016-06-20T09:00:47","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=54344"},"modified":"2016-06-20T12:01:17","modified_gmt":"2016-06-20T09:01:17","slug":"sutasin-aksaray-biyogaz-ve-elektrik-uretimi-tesisi-hizmete-girdi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/sutasin-aksaray-biyogaz-ve-elektrik-uretimi-tesisi-hizmete-girdi\/","title":{"rendered":"(Turkish) S\u00fcta\u015f\u2019\u0131n Aksaray Biyogaz ve Elektrik \u00dcretimi Tesisi Hizmete Girdi&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/54344\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<p class=\"selectionShareable\" style=\"color: #0a0a0a;\"><strong>S\u00fcta\u015f\u2019\u0131n Aksaray fabrikas\u0131ndaki T\u00fcrkiye\u2019nin tar\u0131msal nitelikli alan\u0131n\u0131n en b\u00fcy\u00fc\u011f\u00fc olan Biyogaz ve Elektrik Enerjisi \u00dcretimi Tesisi y\u00f6ren sonras\u0131 hizmete a\u00e7\u0131ld\u0131.<\/strong><span id=\"more-81859\"><\/span><\/p>\n<p class=\"selectionShareable\" style=\"color: #0a0a0a;\">S\u00fcta\u015f Y\u00f6netim Kurulu Ba\u015fkan\u0131 Muharrem Y\u0131lmaz, tesisteki a\u00e7\u0131l\u0131\u015f t\u00f6reninde yapt\u0131\u011f\u0131 konu\u015fmada, do\u011fal <a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/06\/sutasin-aksaray-biyogaz-ve-elektrik-uretim-tesisi-acildi.jpg\"><img loading=\"lazy\" class=\"alignright  wp-image-54345\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/06\/sutasin-aksaray-biyogaz-ve-elektrik-uretim-tesisi-acildi-300x143.jpg\" alt=\"sutasin-aksaray-biyogaz-ve-elektrik-uretim-tesisi-acildi\" width=\"300\" height=\"189\" \/><\/a>tar\u0131m ve do\u011fal enerji i\u00e7in yat\u0131r\u0131mlara devam edeceklerini\u00a0s\u00f6yledi.<\/p>\n<p class=\"selectionShareable\" style=\"color: #0a0a0a;\">Do\u011fal lezzeti, do\u011fal enerji ile \u00fcrettiklerini ifade eden Y\u0131lmaz, \u201cA\u00e7\u0131l\u0131\u015f\u0131 ger\u00e7ekle\u015ftirdi\u011fimiz tesis, 6,4 MWh elektrik enerjisi \u00fcreterek s\u00fct \u00fcr\u00fcnleri fabrikas\u0131n\u0131n elektrik ihtiyac\u0131n\u0131n tamam\u0131n\u0131; buhar ve s\u0131cak su ihtiyac\u0131n\u0131n da \u00f6nemli bir k\u0131sm\u0131n\u0131 sa\u011flayacak. Enerji \u00fcretiminin di\u011fer bir \u00e7\u0131kt\u0131s\u0131 olan organomineral g\u00fcbre \u00fcretimi i\u00e7in devam etmekte olan yat\u0131r\u0131mlar 2016 y\u0131l\u0131 sonunda tamamlanacakt\u0131r. Yem bitkileri i\u00e7in g\u00fcnde 150 ton \u00f6zel g\u00fcbre \u00fcretece\u011fiz\u201d dedi.<\/p>\n<p class=\"selectionShareable\" style=\"color: #0a0a0a;\">Y\u0131lmaz, S\u00fcta\u015f\u2019\u0131n bug\u00fcne kadar Aksaray\u2019da do\u011fal tar\u0131m, do\u011fal enerji ve do\u011fal lezzet \u00fcretim tesislerine yap\u0131lan yat\u0131r\u0131mlar\u0131n\u0131n 205 milyon dolara ula\u015ft\u0131\u011f\u0131n\u0131 vurgulayarak, bin 450 \u00e7al\u0131\u015fan ve 11 bin s\u00fct \u00fcreticisi aileyle birlikte tar\u0131ma dayal\u0131 sanayinin g\u00fczel bir \u00f6rne\u011fini ve bir b\u00f6lgesel kalk\u0131nma modeli olu\u015fturduklar\u0131n\u0131 ifade etti.<\/p>\n<p class=\"selectionShareable\" style=\"color: #0a0a0a;\">\u015eu ana kadar Aksaray Do\u011fal Enerji Tesisleri\u2019nde 9 milyon dolar yat\u0131r\u0131m yapt\u0131klar\u0131n\u0131 anlatan Y\u0131lmaz, \u015funlar\u0131 kaydetti:<\/p>\n<p class=\"selectionShareable\" style=\"color: #0a0a0a;\">\u201c2016 ve 2017 y\u0131l\u0131nda enerji \u00fcretim kapasitesini art\u0131rmak ve g\u00fcbre tesisini kurmak i\u00e7in 17 milyon dolar daha yat\u0131r\u0131m yapaca\u011f\u0131z. Yat\u0131r\u0131mlar\u0131m\u0131z tamamland\u0131\u011f\u0131nda tesislerimiz, bin 800 ton\/g\u00fcn g\u00fcbre ve at\u0131k i\u015fleme kapasitesine sahip olacak; elektrik \u00fcretimimiz, 15 MWh\u2019e, buhar \u00fcretimimiz 10 ton\/saat\u2019e \u00e7\u0131kacak. Organomineral g\u00fcbre \u00fcretim kapasitemiz ise g\u00fcnde 350 tona \u00e7\u0131kacak. Bursa Karacabey\u2019deki S\u00fcta\u015f tesisleri b\u00fcnyesinde benzer bir tesis var, Tire\u2019deki tesisleri ise bu y\u0131l\u0131n ekim ay\u0131 i\u00e7inde devreye al\u0131nacakt\u0131r. Do\u011fal enerji ve g\u00fcbre yat\u0131r\u0131mlar\u0131n\u0131n toplam tutar\u0131 2017 sonunda 60 milyon dolara ula\u015facak ve b\u00f6ylece 10 milyon a\u011fa\u00e7l\u0131k bir orman kadar sera gaz\u0131 sal\u0131m\u0131n\u0131 azaltaca\u011f\u0131z\u201d<\/p>\n<p class=\"selectionShareable\" style=\"color: #0a0a0a;\">Enerji ve Tabii Kaynaklar Bakan Yard\u0131mc\u0131s\u0131 Ali R\u0131za Alaboyun ise yenilenebilir enerji \u00fcretiminin g\u00fcn\u00fcm\u00fczdeki \u00f6nemine ve enerji \u00fcretimi i\u00e7indeki pay\u0131n\u0131n artmas\u0131n\u0131n\u00a0gereklili\u011fine dikkat \u00e7ekti.<\/p>\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. S\u00fcta\u015f\u2019\u0131n Aksaray fabrikas\u0131ndaki T\u00fcrkiye\u2019nin tar\u0131msal nitelikli alan\u0131n\u0131n en b\u00fcy\u00fc\u011f\u00fc olan Biyogaz ve Elektrik Enerjisi \u00dcretimi Tesisi y\u00f6ren sonras\u0131 hizmete a\u00e7\u0131ld\u0131. S\u00fcta\u015f Y\u00f6netim [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":54345,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[22893,53],"tags":[9467,640,641,1678,61,1478,260,19,63,67,1009,2698,165,30279],"views":1779,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/54344"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=54344"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/54344\/revisions"}],"predecessor-version":[{"id":54346,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/54344\/revisions\/54346"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/54345"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=54344"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=54344"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=54344"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}