{"id":54333,"date":"2016-06-19T19:42:50","date_gmt":"2016-06-19T16:42:50","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=54333"},"modified":"2016-06-19T19:42:50","modified_gmt":"2016-06-19T16:42:50","slug":"ortadoguda-guneste-hizli-bir-buyume-donemine-girdi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/ortadoguda-guneste-hizli-bir-buyume-donemine-girdi\/","title":{"rendered":"(Turkish) Ortado\u011fu&#8217;da G\u00fcne\u015fte H\u0131zl\u0131 Bir B\u00fcy\u00fcme D\u00f6nemine Girdi!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/54333\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Ortado\u011fu b\u00f6lgesinin ge\u00e7en y\u0131l g\u00fcne\u015f elektri\u011finde \u00e7ok h\u0131zl\u0131 bir b\u00fcy\u00fcme s\u00fcrecine girdi\u011fi belirtildi.<\/strong><\/p>\n<p>Orta Do\u011fu G\u00fcne\u015f Enerjisi Birli\u011fi (MESIA) taraf\u0131ndan \u00fcyesi olan 12 b\u00f6lge \u00fclkesi \u00fczerine yapt\u0131\u011f\u0131 \u00e7al\u0131\u015fmaya g\u00f6re bu \u00fclkelerdeki ge\u00e7en y\u0131l ba\u015flat\u0131lan projelerin g\u00fcc\u00fc bir \u00f6nceki y\u0131la g\u00f6re 6 kat d\u00fczeyinde art\u0131\u015f g\u00f6sterdi.<\/p>\n<p>MESIA taraf\u0131ndan a<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/06\/ortadoguda-guneste-hizli-bir-buyume-donemine-girdi.jpg\"><img loading=\"lazy\" class=\"alignleft  wp-image-54334\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/06\/ortadoguda-guneste-hizli-bir-buyume-donemine-girdi-300x150.jpg\" alt=\"ortadoguda-guneste-hizli-bir-buyume-donemine-girdi\" width=\"300\" height=\"183\" \/><\/a>\u00e7\u0131klanan verilere g\u00f6re 2014\u2019te 294 MW d\u00fczeyinde ger\u00e7ekle\u015fen bu rakam, 2015 y\u0131l\u0131nda ise 1.815 MW oldu.<\/p>\n<p>2015 y\u0131l\u0131ndaki en h\u0131zl\u0131 art\u0131\u015f 706 MW\u2019l\u0131k proje ile M\u0131s\u0131r\u2019da g\u00f6r\u00fcl\u00fcrken, Fas 430 MW\u2019l\u0131k yeni proje ile ikinci ve \u00dcrd\u00fcn ise 276 MW\u2019l\u0131k yeni proje ile ikinci s\u0131rada yer ald\u0131.<\/p>\n<p>Verilere g\u00f6re son \u00fc\u00e7 y\u0131lda ba\u015flayan projelerin k\u00fcm\u00fclatif g\u00fc\u00e7leri ise 2.603 MW oldu.<\/p>\n<p>Bununla birlikte yine \u00e7al\u0131\u015fmadaki verilere g\u00f6re b\u00f6lgedeki g\u00fcne\u015f elektri\u011fi yat\u0131r\u0131m maliyetleri de \u00e7ok ciddi oranda gerilemekte.<\/p>\n<p>\u00c7al\u0131\u015fmadaki verilere g\u00f6re 2008 y\u0131l\u0131nda watt ba\u015f\u0131na 7 dolar olan yat\u0131r\u0131m maliyetleri, 2014 y\u0131l\u0131nda ise 1,5 dolara kadar gerilemi\u015f durumda.<\/p>\n<p>Bu \u00fclkelerde 2010 y\u0131l\u0131nda ger\u00e7ekle\u015fen g\u00fcne\u015f elektri\u011fi yat\u0131r\u0131mlar\u0131 tutar\u0131 160 milyon dolar d\u00fczeyinde ger\u00e7ekle\u015firken, ayn\u0131 rakam ge\u00e7en y\u0131l ise 3,5 milyar dolara y\u00fckselmi\u015f durumda idi.<\/p>\n<p>Kaynak: <a href=\"http:\/\/solar.ist\/ortadogu-guneste-hizli-buyume-donemine-girdi\" target=\"_blank\" rel=\"nofollow\">Solar.ist<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Ortado\u011fu b\u00f6lgesinin ge\u00e7en y\u0131l g\u00fcne\u015f elektri\u011finde \u00e7ok h\u0131zl\u0131 bir b\u00fcy\u00fcme s\u00fcrecine girdi\u011fi belirtildi. Orta Do\u011fu G\u00fcne\u015f Enerjisi Birli\u011fi (MESIA) taraf\u0131ndan \u00fcyesi olan 12 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":54334,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49],"tags":[63,67,1009,2698,165,227,13,23133,22975,4269,13595,30274,1918],"views":852,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/54333"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=54333"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/54333\/revisions"}],"predecessor-version":[{"id":54335,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/54333\/revisions\/54335"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/54334"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=54333"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=54333"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=54333"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}