{"id":53670,"date":"2016-06-04T13:20:38","date_gmt":"2016-06-04T10:20:38","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=53670"},"modified":"2016-06-04T13:20:38","modified_gmt":"2016-06-04T10:20:38","slug":"hindistan-gunes-elektriginde-7-gwi-asti","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/hindistan-gunes-elektriginde-7-gwi-asti\/","title":{"rendered":"(Turkish) Hindistan G\u00fcne\u015f Elektri\u011finde 7 GW\u2019\u0131 A\u015ft\u0131!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/53670\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<div class=\"entry-header\">\n<p><strong>Hindistan\u2019\u0131n g\u00fcne\u015f elektri\u011fi kurulu g\u00fcc\u00fcn\u00fcn 7 GW seviyesine y\u00fckseldi\u011fi bildirildi.<\/strong><\/p>\n<\/div>\n<p><!-- .entry-header --><\/p>\n<div class=\"entry-content\">\n<div class=\"featured-image\"><img loading=\"lazy\" class=\"attachment-post-main  wp-post-image aligncenter\" src=\"http:\/\/solarist.yesilekonomi.netdna-cdn.com\/wp-content\/uploads\/2016\/05\/hindistan-7-GW.jpg\" alt=\"hindistan-7-GW\" width=\"500\" height=\"250\" \/><\/div>\n<div class=\"featured-image\"><\/div>\n<\/div>\n<p>Hindistan Yeni ve Yenilenebilir Enerji Bakanl\u0131\u011f\u0131 taraf\u0131ndan yap\u0131lan yaz\u0131l\u0131 a\u00e7\u0131klamaya g\u00f6re \u00fclkedeki elektrik \u015febekesine ba\u011fl\u0131 kurulumlar\u0131n g\u00fcc\u00fc 30 Nisan 2016 tarihi itibari ile 6,998.53 MW oldu.<\/p>\n<p>Bu rakam 31 Aral\u0131k 2015 itibari ile 5,130 MW, 31 Mart 2016 itibari ile ise 6,762 MW olmu\u015ftu.<\/p>\n<p>Hindistan 1 Nisan 2016 ile 31 Mart 2017 tarihlerini kapsayan, 2016-2017 mali y\u0131l\u0131 i\u00e7in ise g\u00fcne\u015f elektri\u011fi kurulu g\u00fcc\u00fcn\u00fc 12 GW art\u0131rmay\u0131 hedefledi\u011fini a\u00e7\u0131klam\u0131\u015ft\u0131.<\/p>\n<p>2022 y\u0131l\u0131nda yenilenebilir enerji kaynaklar\u0131na dayal\u0131 175 GW\u2019l\u0131k kurulu g\u00fcce ula\u015fmay\u0131 hedefleyen Hindistan, g\u00fcne\u015f elektri\u011fi kurulumlar\u0131n\u0131n bu g\u00fcc\u00fcn 100 GW\u2019l\u0131k b\u00f6l\u00fcm\u00fcn\u00fc sa\u011flamas\u0131n\u0131 planl\u0131yor.<\/p>\n<p>Kaynak: <a href=\"http:\/\/solar.ist\/hindistan-gunes-elektriginde-7-gwi-asti\/\" target=\"_blank\" rel=\"nofollow\">Solar.ist<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Hindistan\u2019\u0131n g\u00fcne\u015f elektri\u011fi kurulu g\u00fcc\u00fcn\u00fcn 7 GW seviyesine y\u00fckseldi\u011fi bildirildi. Hindistan Yeni ve Yenilenebilir Enerji Bakanl\u0131\u011f\u0131 taraf\u0131ndan yap\u0131lan yaz\u0131l\u0131 a\u00e7\u0131klamaya g\u00f6re \u00fclkedeki [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":53671,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[63,67,1009,2698,165,227,1169,13,23133,22975,4269,4034,105],"views":897,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/53670"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=53670"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/53670\/revisions"}],"predecessor-version":[{"id":53672,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/53670\/revisions\/53672"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/53671"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=53670"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=53670"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=53670"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}