{"id":53577,"date":"2016-06-02T11:18:26","date_gmt":"2016-06-02T08:18:26","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=53577"},"modified":"2016-06-02T11:18:26","modified_gmt":"2016-06-02T08:18:26","slug":"rosatom-akkuyu-anlasmasi-gecerliligini-koruyor","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/rosatom-akkuyu-anlasmasi-gecerliligini-koruyor\/","title":{"rendered":"(Turkish) Rosatom: \u201cAkkuyu Anla\u015fmas\u0131 Ge\u00e7erlili\u011fini Koruyor!\u201d"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/53577\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Rusya Devlet N\u00fckleer Enerji Kurumu (Rosatom) Ba\u015fkan Yard\u0131mc\u0131s\u0131 Kirill Komarov, T\u00fcrkiye ile Akkuyu n\u00fckleer g\u00fc\u00e7 santrali projesi i\u00e7in imzalanan h\u00fck\u00fcmetleraras\u0131 anla\u015fman\u0131n halen y\u00fcr\u00fcrl\u00fckte oldu\u011funu s\u00f6yledi.<\/strong><\/p>\n<p><a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/11\/akkuyu-ngs-238778923-696x385.jpg\"><img loading=\"lazy\" class=\"alignleft size-medium wp-image-46864\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/11\/akkuyu-ngs-238778923-696x385-300x165.jpg\" alt=\"akkuyu-ngs-238778923-696x385\" width=\"300\" height=\"165\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/11\/akkuyu-ngs-238778923-696x385-300x165.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/11\/akkuyu-ngs-238778923-696x385-500x276.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/11\/akkuyu-ngs-238778923-696x385-80x44.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/11\/akkuyu-ngs-238778923-696x385.jpg 696w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>Moskova\u2019da d\u00fczenlenen\u00a0n\u00fckleer enerji fuar\u0131 \u2018Atomexpo-2016\u2019a kat\u0131lan Komarov\u2019a, Rusya ile T\u00fcrkiye aras\u0131ndaki krizin Akkuyu\u2019daki projeye etkisi soruldu.<\/p>\n<p>\u201cT\u00fcrkiye ile imzalad\u0131\u011f\u0131m\u0131z bir h\u00fck\u00fcmetleraras\u0131 anla\u015fma var ve bu anla\u015fma ge\u00e7erlili\u011fini koruyor\u201d yan\u0131t\u0131n\u0131 veren Komarov, \u201cAnla\u015fmaya g\u00f6re, Rosatom n\u00fckleer santralin hizmet s\u00fcresinin sonuna kadar y\u00fczde 51 hisseye sahip olmaya devam edecek. Ancak \u015firket, T\u00fcrk h\u00fck\u00fcmetinin onay\u0131yla hisselerinin y\u00fczde 49\u2019a kadarl\u0131k b\u00f6l\u00fcm\u00fcn\u00fc stratejik yat\u0131r\u0131mc\u0131lara satma hakk\u0131n\u0131 da elinde bulunduruyor\u201d diye konu\u015ftu.<\/p>\n<p>Kaynak: Enerji Enstit\u00fcs\u00fc<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Rusya Devlet N\u00fckleer Enerji Kurumu (Rosatom) Ba\u015fkan Yard\u0131mc\u0131s\u0131 Kirill Komarov, T\u00fcrkiye ile Akkuyu n\u00fckleer g\u00fc\u00e7 santrali projesi i\u00e7in imzalanan h\u00fck\u00fcmetleraras\u0131 anla\u015fman\u0131n halen y\u00fcr\u00fcrl\u00fckte [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":46864,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,43],"tags":[29983,3019,1303,63,67,1009,2698,165,71,21,25480,23614,2973,2587,29944],"views":883,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/53577"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=53577"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/53577\/revisions"}],"predecessor-version":[{"id":53578,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/53577\/revisions\/53578"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/46864"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=53577"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=53577"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=53577"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}