{"id":53454,"date":"2016-05-28T09:25:06","date_gmt":"2016-05-28T06:25:06","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=53454"},"modified":"2016-05-28T09:25:06","modified_gmt":"2016-05-28T06:25:06","slug":"ulusoy-elektrikten-katar-ihaleleriyle-ilgili-aciklama","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/ulusoy-elektrikten-katar-ihaleleriyle-ilgili-aciklama\/","title":{"rendered":"(Turkish) Ulusoy Elektrik\u2019ten, Katar \u0130haleleriyle \u0130lgili A\u00e7\u0131klama!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/53454\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<p class=\"selectionShareable\" style=\"color: #0a0a0a;\"><strong>Ulusoy Elektrik,daha \u00f6nce Katar\u2019da kat\u0131ld\u0131\u011f\u0131 2 ihalenin devam etti\u011fini bildirdi.<\/strong><\/p>\n<p class=\"selectionShareable\" style=\"color: #0a0a0a;\">Ulusoy Elektrik taraf\u0131ndan yap\u0131lan KAP a\u00e7\u0131klamas\u0131nda,\u015firketin\u00a0Qatar General Electricity &amp; Water Corporation (Kahramaa) , taraf\u0131ndan 29.10.2015 tari<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/05\/ulusoy-elektrikten-katar-ihaleleriyle-ilgili-aciklama.jpg\"><img loading=\"lazy\" class=\"alignleft  wp-image-53455\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/05\/ulusoy-elektrikten-katar-ihaleleriyle-ilgili-aciklama-300x100.jpg\" alt=\"ulusoy-elektrikten-katar-ihaleleriyle-ilgili-aciklama\" width=\"300\" height=\"171\" \/><\/a>hinde ger\u00e7ekle\u015ftirilen 11 kV Metal Clad h\u00fccre al\u0131m\u0131 ve 500, 1000, 1600 kVA trafo al\u0131m\u0131 ihalelerine (toplam iki adet ihale) kat\u0131ld\u0131\u011f\u0131n\u0131 belirtti.<span id=\"more-81161\"><\/span>\u00a0A\u00e7\u0131klamada s\u00f6z konusu ihalelerin hen\u00fcz sonu\u00e7lanmam\u0131\u015f oldu\u011fu, ihaleyi d\u00fczenleyen kurulu\u015f olan Kahramaa taraf\u0131ndan de\u011ferlendirme s\u00fcreci devam etti\u011fi belirtildi. Bu \u00e7er\u00e7evede teknik detaylar hakk\u0131nda g\u00f6r\u00fc\u015fmelerin s\u00fcrmekte olup, hen\u00fcz ihale sonucuna ili\u015fkin \u00f6ng\u00f6r\u00fc olu\u015fturacak bir bilgi verilmedi\u011fi bildirildi.<\/p>\n<p class=\"selectionShareable\" style=\"color: #0a0a0a;\">Ayr\u0131ca a\u00e7\u0131klamada s\u00fcrecin devam etmesi nedeniyle, Qatar Elektrik \u0130daresi Kahramaa\u2019 n\u0131n talebi \u00fczerine ihale i\u00e7in al\u0131nan teminat \u00a0mektuplar\u0131m\u0131z\u0131n s\u00fcresi 29.07.2016 tarihine kadar uzat\u0131ld\u0131\u011f\u0131,bu s\u00fcrenin , teminat mektuplar\u0131n\u0131n vadesini ifade etmekte olup, ihalenin sonu\u00e7lanma tarihi ile \u00a0ilgili bir g\u00f6sterge olmad\u0131\u011f\u0131 bilgisine yer verildi.<\/p>\n<p class=\"selectionShareable\" style=\"color: #0a0a0a;\">Kaynak: B\u00fcltenler<\/p>\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Ulusoy Elektrik,daha \u00f6nce Katar\u2019da kat\u0131ld\u0131\u011f\u0131 2 ihalenin devam etti\u011fini bildirdi. Ulusoy Elektrik taraf\u0131ndan yap\u0131lan KAP a\u00e7\u0131klamas\u0131nda,\u015firketin\u00a0Qatar General Electricity &amp; Water Corporation (Kahramaa) [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":53455,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53],"tags":[68,61,19638,1451,2873,63,67,1009,2698,165,29913,29914,29915,29916,29917,19390],"views":933,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/53454"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=53454"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/53454\/revisions"}],"predecessor-version":[{"id":53456,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/53454\/revisions\/53456"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/53455"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=53454"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=53454"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=53454"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}