{"id":53322,"date":"2016-05-25T11:37:05","date_gmt":"2016-05-25T08:37:05","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=53322"},"modified":"2016-05-25T11:37:05","modified_gmt":"2016-05-25T08:37:05","slug":"greeneco-enerji-denizlide-jeotermal-enerji-uretimine-basladi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/greeneco-enerji-denizlide-jeotermal-enerji-uretimine-basladi\/","title":{"rendered":"(Turkish) Greeneco Enerji, Denizli\u2019de Jeotermal Enerji \u00dcretimine Ba\u015flad\u0131!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/53322\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<p class=\"selectionShareable\" style=\"color: #0a0a0a;\"><strong>Saray Holding ve Acarsan Holding ortakl\u0131\u011f\u0131yla 2012 y\u0131l\u0131nda kurulan Greeneco Enerji Elektrik \u00dcretim A.\u015e.; daha temiz, daha ya\u015fanabilir bir d\u00fcnya hedefiyle \u00e7evre dostu jeotermal enerji \u00fcretimine ba\u015flad\u0131.<span id=\"more-81043\"><\/span>\u00a0T\u00fcrkiye\u2019nin artan enerji ihtiyac\u0131na \u00e7\u00f6z\u00fcm olacak 110 milyon dolarl\u0131k proje yat\u0131r\u0131m\u0131n\u0131n ise y\u00fczde 80\u2019i tamamland\u0131.<\/strong><\/p>\n<p class=\"selectionShareable\" style=\"color: #0a0a0a;\">\u0130thal girdiye ihtiya\u00e7 duymaks\u0131z\u0131n; \u00e7evreci, yerli ve yenilenebilir kaynaklar ile elektrik \u00fcretebilen Greeneco Enerji, \u015eubat ay\u0131nda deneme \u00fcretimine ba\u015flad\u0131.<\/p>\n<p class=\"selectionShareable\" style=\"color: #0a0a0a;\"><strong>\u0130lk yerli t\u00fcrbin kullanan santral<\/strong><\/p>\n<p class=\"selectionShareable\" style=\"color: #0a0a0a;\">T\u00fcrkiye\u2019nin elektrik ve \u0131s\u0131 ihtiya\u00e7lar\u0131 \u00e7er\u00e7evesinde \u00f6nemli tasarruflar ger\u00e7ekle\u015ftirmeyi ama\u00e7lad\u0131klar\u0131n\u0131 anlatan Greeneco Enerji Elektrik \u00dcretim A.\u015e. Y\u00f6netim Kurulu Ba\u015fkan Yard\u0131mc\u0131s\u0131 Kamil \u00d6zda\u011f; lisansland\u0131r\u0131lm\u0131\u015f ve lisans a\u015famas\u0131nda olan RES, JES ve GES tipi \u00e7evreci enerji \u00fcretim \u00e7e\u015fitleriyle T\u00fcrkiye \u00e7ap\u0131nda y\u0131ll\u0131k 1 milyar Kwh \u00fcretim kapasitesinde karma elektrik enerji \u00fcretim portf\u00f6y\u00fc kurmay\u0131 hedeflediklerini s\u00f6yledi.<\/p>\n<p class=\"selectionShareable\" style=\"color: #0a0a0a;\">Yat\u0131r\u0131ma 2012 y\u0131l\u0131nda ba\u015flad\u0131klar\u0131n\u0131, \u015fu an santral montaj\u0131n\u0131 tamamlad\u0131klar\u0131n\u0131 ve testlere ba\u015flad\u0131klar\u0131n\u0131 belirten Kamil \u00d6zda\u011f, \u201cSantralin ikinci \u00fcnite ile beraber 25,6 MWe\u2019lik kurulu g\u00fcc\u00fcn\u00fcn tamam\u0131n\u0131 Ekim 2016\u2019da devreye almay\u0131 hedefliyoruz. Sondaj ve rezervuar s\u00fcreci sonu\u00e7land\u0131r\u0131lm\u0131\u015f, m\u00fchendislik ve tedarik s\u00fcre\u00e7leri tamamlanan projemizde bu ay i\u00e7inde deneme \u00fcretimi ger\u00e7ekle\u015fecek olup santral kabul\u00fc yap\u0131lacak. 2. \u00fcnitenin de montaj ve kurulum \u00e7al\u0131\u015fmalar\u0131 h\u0131zla devam ediyor\u201d dedi.<\/p>\n<p class=\"selectionShareable\" style=\"color: #0a0a0a;\"><img loading=\"lazy\" class=\" wp-image-81044 aligncenter td-animation-stack-type0-2\" src=\"http:\/\/statik3.enerjienstitusu.com\/wp-content\/uploads\/jeotermal-greeneco-22222222221.jpg\" alt=\"jeotermal greeneco 22222222221\" width=\"464\" height=\"348\" \/><br \/>\n\u00d6zda\u011f, ayr\u0131ca santral al\u0131m s\u00f6zle\u015fmesi ile \u00fclkemizde yerli t\u00fcrbin \u00fcretilmesine olanak sa\u011flayarak, ilk yerli t\u00fcrbin kullanan jeotermal elektrik santrali olma \u00f6zelli\u011fini de ta\u015f\u0131d\u0131klar\u0131n\u0131 ifade etti.<\/p>\n<p class=\"selectionShareable\" style=\"color: #0a0a0a;\">Greeneco Enerji yat\u0131r\u0131m\u0131n\u0131n; Denizli \u2013 Sarayk\u00f6y \u2013 Tekke b\u00f6lgesinde 2 bin 250 hektar alanda kurulu oldu\u011fundan s\u00f6z eden Kamil \u00d6zda\u011f \u015f\u00f6yle konu\u015ftu: \u201cSaham\u0131zda toplam 60 MWe\u2019lik bir kurulu g\u00fcce ula\u015fmay\u0131 planl\u0131yoruz. \u0130lk etapta 2 \u00fcniteden olu\u015fan 25,6 MWe g\u00fcc\u00fcndeki ilk santralimizin kurulumunu ba\u015flatt\u0131k. Bu santralimizde y\u0131ll\u0131k 200.000.000 KWh elektrik enerjisi \u00fcretilecek. 2. etap yat\u0131r\u0131m\u0131m\u0131zla ilgili m\u00fchendislik \u00e7al\u0131\u015fmalar\u0131m\u0131z da h\u0131zla devam ediyor. 2. etap yat\u0131r\u0131m\u0131m\u0131z\u0131n 2019 y\u0131l\u0131nda tamamlanmas\u0131 ile 240 Milyon Dolarl\u0131k bir yat\u0131r\u0131m de\u011ferine ula\u015farak, 60 MWe kurulu g\u00fc\u00e7 ile y\u0131ll\u0131k 540.000.000 KWh \u00fcretim kapasitesine ula\u015fmay\u0131 planl\u0131yoruz.\u201d<\/p>\n<p class=\"selectionShareable\" style=\"color: #0a0a0a;\">Ama\u00e7lar\u0131n\u0131n; yerli ve yenilenebilir enerji kaynaklar\u0131 ile s\u00fcrd\u00fcr\u00fclebilir, ucuz, temiz ve insanl\u0131k i\u00e7in de bir o kadar \u00e7evreye sayg\u0131l\u0131, ad\u0131 gibi \u201cGreen\u201d enerji \u00fcretmek oldu\u011funu vurgulayan \u00d6zda\u011f, \u201c2016 Ekim ay\u0131 itibariyle y\u0131ll\u0131k 200.000.000 Kwh\u2019l\u0131k \u00fcretim kapasitesine ula\u015faca\u011f\u0131z\u201d diye konu\u015ftu.<\/p>\n<p class=\"selectionShareable\" style=\"color: #0a0a0a;\"><strong>Do\u011falgaz ithalat\u0131 d\u00fc\u015f\u00fcr\u00fclecek<\/strong><\/p>\n<p class=\"selectionShareable\" style=\"color: #0a0a0a;\">Saray Holding olarak t\u00fcm grup \u015firketlerinde gerek \u00fcretimlerde gerekse i\u015f modellerinde s\u00fcrd\u00fcr\u00fclebilirli\u011fi \u00f6n planda tuttuklar\u0131n\u0131 anlatan Greeneco Enerji Elektrik \u00dcretim A.\u015e. Y\u00f6netim Kurulu Ba\u015fkan Yard\u0131mc\u0131s\u0131 Kamil \u00d6zda\u011f, insana ve \u00e7evreye fayda sa\u011flayan yerli, yenilenebilir enerji kaynaklar\u0131 konusunda yapt\u0131klar\u0131 ara\u015ft\u0131rma ve \u00e7al\u0131\u015fmalar sonucunda \u00fclkemizdeki potansiyeli de d\u00fc\u015f\u00fcnerek jeotermal alan\u0131nda ilerlemeye karar verdiklerini iletti. Denizli \u2013 Sarayk\u00f6y \u2013 Tekke jeotermal projesi tamamland\u0131\u011f\u0131nda y\u0131ll\u0131k yakla\u015f\u0131k 125 milyon m2 do\u011falgaz ithalat\u0131n\u0131n \u00f6n\u00fcne ge\u00e7ilece\u011fini s\u00f6zlerine ekleyen Kamil \u00d6zda\u011f, \u201c\u00dclkemiz do\u011falgaz ithalat\u0131n\u0131n 45 Milyon Dolar d\u00fc\u015f\u00fcr\u00fclerek cari a\u00e7\u0131\u011f\u0131m\u0131z\u0131n azalt\u0131lmas\u0131na olumlu katk\u0131 verilmesi hedefleniyor. Greeneco Enerji olarak bu projemiz, fosil yak\u0131t kullan\u0131m\u0131n\u0131 azaltacak ve cari a\u00e7\u0131\u011f\u0131n kapanmas\u0131na katk\u0131 verecek \u00f6nemli projelerden biridir\u201d dedi.<\/p>\n<p class=\"selectionShareable\" style=\"color: #0a0a0a;\">Greeneco jeotermal santrali projesinin ana dan\u0131\u015fmanl\u0131klar\u0131n\u0131; Hacettepe \u00dcniversitesi, Orta Do\u011fu Teknik \u00dcniversitesi, GeologicaI Inc. California USA ve Maden Tetkik ve Arama Genel M\u00fcd\u00fcrl\u00fc\u011f\u00fc ger\u00e7ekle\u015ftiriyor.<\/p>\n<p class=\"selectionShareable\" style=\"color: #0a0a0a;\">Kaynak: B\u00fcltenler<\/p>\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Saray Holding ve Acarsan Holding ortakl\u0131\u011f\u0131yla 2012 y\u0131l\u0131nda kurulan Greeneco Enerji Elektrik \u00dcretim A.\u015e.; daha temiz, daha ya\u015fanabilir bir d\u00fcnya hedefiyle \u00e7evre [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":53323,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,48],"tags":[845,63,67,1009,2698,165,2326,5211,29848,58,56,23226,23225,6322,474],"views":1577,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/53322"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=53322"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/53322\/revisions"}],"predecessor-version":[{"id":53324,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/53322\/revisions\/53324"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/53323"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=53322"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=53322"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=53322"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}