{"id":53277,"date":"2016-05-23T18:07:20","date_gmt":"2016-05-23T15:07:20","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=53277"},"modified":"2016-05-23T18:07:20","modified_gmt":"2016-05-23T15:07:20","slug":"artvine-10-mwlik-balikli-hes-kurulacak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/artvine-10-mwlik-balikli-hes-kurulacak\/","title":{"rendered":"(Turkish) Artvin&#8217;e 10 MW&#8217;l\u0131k Bal\u0131kl\u0131 HES Kurulacak&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/53277\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Assu Elektrik Artvin&#8217;in\u00a0Arhavi il\u00e7esi yak\u0131nlar\u0131nda\u00a09,787 MW kapasiteli Bal\u0131kl\u0131 I-II-III hidroelektrik santrali kuracak.<\/strong><\/p>\n<p>Assu Elektrik Enerji \u00dcretim Ltd. \u015eti., Artvin ili Arhav\u0131 ilcesi Bal\u0131kl\u0131 k\u00f6y\u00fc mevkiinde 9,787 MW kurulum ka<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/05\/artvine-10-mwlik-balikli-hes-kurulacak.jpg\"><img loading=\"lazy\" class=\"alignright  wp-image-53278\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/05\/artvine-10-mwlik-balikli-hes-kurulacak-300x225.jpg\" alt=\"artvine-10-mwlik-balikli-hes-kurulacak\" width=\"300\" height=\"208\" \/><\/a>pasitesine sahip Bal\u0131kl\u0131 I-II-III Regulat\u00f6rleri VE Hidroelektrik Santrali Projesi&#8217;ni hayata ge\u00e7irmeyi planl\u0131yor.<\/p>\n<p><strong>PROJEDE KAPAS\u0130TE ARTI\u015eINA G\u0130D\u0130LD\u0130<\/strong><\/p>\n<p>Assu Elektrik taraf\u0131ndan Artvin&#8217;de yap\u0131lmas\u0131 planlanan Bal\u0131kl\u0131 I-II-III HES projesinde de\u011fi\u015fikli\u011fe gidilerek kapasitesi 3,243 MW artt\u0131r\u0131ld\u0131. Bal\u0131kl\u0131 I-II-III Regulat\u00f6rleri VE Hidroelektrik Santrali Projesi&#8217;nin kapasitesi 6,544 MW&#8217;dan 9,787 MW&#8217;a \u00e7\u0131kar\u0131ld\u0131.<\/p>\n<p>Sistemin devreye girmesi ile 6,75 MWm\/6,544 MWe kurulu g\u00fc\u00e7teki Bal\u0131kl\u0131 HES&#8217;te 13,00 GWh firm ve 19,96 GWh sekonder olmak \u00fczere y\u0131lda toplam 32,96 GWh enerji \u00fcretilecekken, planlanan de\u011fi\u015fiklik sonras\u0131nda \u00a09,936 MWm\/9,787 MWe kurulu g\u00fc\u00e7teki Bal\u0131kl\u0131 HES&#8217;te 9,87 GWh firm ve 26,67 GWh sekonder olmak \u00fczere y\u0131lda toplam 36,54 GWh enerji \u00fcretilecek.<\/p>\n<p>Ayr\u0131ca, 6.990.921 TL&#8217;lik Kapasite art\u0131\u015f projesi ile ilgili olarak Artvin Valili\u011fi &#8220;\u00c7evresel Etki De\u011ferlendirmesi Gerekli De\u011fildir&#8221; karar\u0131 verdi.<\/p>\n<p>Kaynak: B\u00fcltenler<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Assu Elektrik Artvin&#8217;in\u00a0Arhavi il\u00e7esi yak\u0131nlar\u0131nda\u00a09,787 MW kapasiteli Bal\u0131kl\u0131 I-II-III hidroelektrik santrali kuracak. Assu Elektrik Enerji \u00dcretim Ltd. \u015eti., Artvin ili Arhav\u0131 ilcesi Bal\u0131kl\u0131 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":53278,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,47],"tags":[25291,1089,29824,29823,29825,67,1009,2698,165,35370,1090,10764],"views":1859,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/53277"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=53277"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/53277\/revisions"}],"predecessor-version":[{"id":53279,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/53277\/revisions\/53279"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/53278"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=53277"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=53277"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=53277"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}