{"id":53114,"date":"2016-05-19T11:10:00","date_gmt":"2016-05-19T08:10:00","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=53114"},"modified":"2016-05-19T11:10:57","modified_gmt":"2016-05-19T08:10:57","slug":"rusya-busehr-nukleer-santralini-irana-teslim-etti","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/rusya-busehr-nukleer-santralini-irana-teslim-etti\/","title":{"rendered":"(Turkish) Rusya, Bu\u015fehr N\u00fckleer Santralini \u0130ran\u2019a Teslim Etti!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/53114\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong><span style=\"color: #0a0a0a;\">Rusya Atom Ajans\u0131 yetkilileri, daha \u00f6nce in\u015fas\u0131n\u0131 tamamlad\u0131klar\u0131 n\u00fckleer santralinin b\u00fct\u00fcn haklar\u0131n\u0131 \u0130ran\u2019a kullan\u0131m i\u00e7in teslim<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/05\/rusya-busehr-nukleer-santralini-irana-teslim-etti.jpg\"><img loading=\"lazy\" class=\"alignleft size-medium wp-image-53115\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/05\/rusya-busehr-nukleer-santralini-irana-teslim-etti-300x200.jpg\" alt=\"File photo of Iranian workers standing in front of Bushehr nuclear power plant\" width=\"300\" height=\"200\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/05\/rusya-busehr-nukleer-santralini-irana-teslim-etti-300x200.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/05\/rusya-busehr-nukleer-santralini-irana-teslim-etti-1024x682.jpg 1024w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/05\/rusya-busehr-nukleer-santralini-irana-teslim-etti-500x333.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/05\/rusya-busehr-nukleer-santralini-irana-teslim-etti-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/05\/rusya-busehr-nukleer-santralini-irana-teslim-etti.jpg 1068w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a> ettiklerini duyurdu.<\/span><\/strong><span id=\"more-80881\" style=\"color: #0a0a0a;\"><\/span><\/p>\n<p>Konuyla ilgili haberlere yer veren \u0130ran bas\u0131n\u0131, s\u00f6z konusu santralin, Ortado\u011fu b\u00f6lgesinin ilk n\u00fckleer santrali oldu\u011funun alt\u0131n\u0131 \u00e7izdi.<\/p>\n<p>\u0130ran devriminden \u00f6nce 1970 y\u0131l\u0131nda s\u00f6z konusu n\u00fckleer santralin yap\u0131m\u0131n\u0131 \u00fcstlenen Almanya\u2019n\u0131n Siemens \u015firketi, daha sonra projeyi yar\u0131da b\u0131rakm\u0131\u015ft\u0131. N\u00fckleer santralin yap\u0131m\u0131 daha sonra Tahran taraf\u0131ndan Rusya\u2019ya verildi. Rusya 1999\u2019da teslim etmeyi vadetti\u011fi Bu\u015fehr santralinin baz\u0131 siyasi ve uluslar aras\u0131 tepkiler y\u00fcz\u00fcnden bitiremedi. Santral ilk olarak 2011 y\u0131l\u0131nda elektrik \u00fcretmeye ba\u015flad\u0131.<\/p>\n<p>Tam kapasiteyle \u00e7al\u0131\u015fmas\u0131 halinde santral, 1000 megavat g\u00fcc\u00fcnde elektrik \u00fcretebilecek.<\/p>\n<p>Kaynak: Enerji Enstit\u00fcs\u00fc<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Rusya Atom Ajans\u0131 yetkilileri, daha \u00f6nce in\u015fas\u0131n\u0131 tamamlad\u0131klar\u0131 n\u00fckleer santralinin b\u00fct\u00fcn haklar\u0131n\u0131 \u0130ran\u2019a kullan\u0131m i\u00e7in teslim ettiklerini duyurdu. Konuyla ilgili haberlere yer veren [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":53115,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,43],"tags":[21686,63,67,1009,2698,165,1333,71,21,25480,23614,2973,885,29748],"views":822,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/53114"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=53114"}],"version-history":[{"count":2,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/53114\/revisions"}],"predecessor-version":[{"id":53117,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/53114\/revisions\/53117"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/53115"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=53114"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=53114"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=53114"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}