{"id":53064,"date":"2016-05-17T21:00:22","date_gmt":"2016-05-17T18:00:22","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=53064"},"modified":"2016-05-17T21:00:22","modified_gmt":"2016-05-17T18:00:22","slug":"albe-biyogaz-tesisi-10-milyon-tllik-ek-yatirimla-40-bin-eve-elektrik-saglayacak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/albe-biyogaz-tesisi-10-milyon-tllik-ek-yatirimla-40-bin-eve-elektrik-saglayacak\/","title":{"rendered":"(Turkish) Albe Biyogaz Tesisi, 10 Milyon TL\u2019lik Ek Yat\u0131r\u0131mla 40 Bin Eve Elektrik Sa\u011flayacak!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/53064\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<p class=\"selectionShareable\" style=\"color: #0a0a0a;\"><strong>Era \u015eirketler Grubu b\u00fcnyesinde faaliyet g\u00f6steren Albe Biyogaz tesisi, 10 milyon TL\u2019lik ek yat\u0131r\u0131m ile elektrik \u00fcretim kapasitesini ikiye katlayarak 1,87 mW kurulu g\u00fc\u00e7ten, 3,11 mW kurulu g\u00fcce \u00e7\u0131k\u0131yor.<\/strong><span id=\"more-80843\"><\/span><\/p>\n<p class=\"selectionShareable\" style=\"color: #0a0a0a;\">\u00dclkemizin enerji ihtiyac\u0131n\u0131 \u00e7evre dostu, g\u00fcvenilir yenilenebilir enerji ile kar\u015f\u0131lamak hedefiyle, T\u00fcrkiye\u2019de bir ilke imza at\u0131larak kurulan ve %100 tavuk g\u00fcbresinden elektrik enerjisi \u00fcreten Albe Biyogaz tesisi, 10 milyon TL\u2019lik ek yat\u0131r\u0131m ile 40.000 konutun elektrik ihtiyac\u0131n\u0131 kar\u015f\u0131layacak \u015fekilde b\u00fcy\u00fcyor. Ankara \u00c7ubuk\u2019ta bulunan ve Ekim 2016\u2019da tamamlanmas\u0131 planlanan ek tesis, g\u00fcnde 300 ton tavuk g\u00fcbresini i\u015fleyerek y\u0131lda 24 milyon kilovatsaat elektrik \u00fcretebilecek ve enerjiyi \u015febekeye aktararak il\u00e7eyi ayd\u0131nlatmaya devam edebilecek.<\/p>\n<p class=\"selectionShareable\" style=\"color: #0a0a0a;\"><img loading=\"lazy\" class=\"wp-image-80844 td-animation-stack-type0-2 aligncenter\" src=\"http:\/\/statik1.enerjienstitusu.com\/wp-content\/uploads\/albe-biyogaz-2.jpg\" alt=\"\" width=\"461\" height=\"259\" \/>T\u00fcrkiye\u2019de s\u0131f\u0131r at\u0131k prensibiyle \u00e7al\u0131\u015fan biyogaz tesisinde, %100 do\u011fal ve organik gran\u00fcl g\u00fcbre \u00fcretimi ger\u00e7ekle\u015ftiriliyor ve toprak i\u00e7in kullan\u0131ma uygun hale d\u00f6n\u00fc\u015ft\u00fcr\u00fcl\u00fcyor. Elektrik \u00fcretiminin ard\u0131ndan ortaya \u00e7\u0131kan at\u0131k g\u00fcbre kapasitesi ise, ek yat\u0131r\u0131m revizyonu ile 5 tondan, g\u00fcnl\u00fck ortalama 15-25 tona \u00e7\u0131kmas\u0131 planlan\u0131yor.<\/p>\n<p class=\"selectionShareable\" style=\"color: #0a0a0a;\"><img loading=\"lazy\" class=\"wp-image-80845 td-animation-stack-type0-2 aligncenter\" src=\"http:\/\/statik1.enerjienstitusu.com\/wp-content\/uploads\/albe-biyogaz-3.jpg\" alt=\"\" width=\"468\" height=\"263\" \/><\/p>\n<p class=\"selectionShareable\" style=\"color: #0a0a0a;\">Kaynak: B\u00fcltenler<\/p>\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Era \u015eirketler Grubu b\u00fcnyesinde faaliyet g\u00f6steren Albe Biyogaz tesisi, 10 milyon TL\u2019lik ek yat\u0131r\u0131m ile elektrik \u00fcretim kapasitesini ikiye katlayarak 1,87 mW [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":53065,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[22893,51,53],"tags":[29725,640,641,19,63,67,1009,93,2698,165,29726,2839,105],"views":1762,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/53064"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=53064"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/53064\/revisions"}],"predecessor-version":[{"id":53066,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/53064\/revisions\/53066"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/53065"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=53064"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=53064"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=53064"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}