{"id":52790,"date":"2016-05-09T19:39:32","date_gmt":"2016-05-09T16:39:32","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=52790"},"modified":"2016-05-09T19:39:32","modified_gmt":"2016-05-09T16:39:32","slug":"nigdede-gunes-paneli-uretim-tesisinin-temeli-atildi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/nigdede-gunes-paneli-uretim-tesisinin-temeli-atildi\/","title":{"rendered":"(Turkish) Ni\u011fde\u2019de G\u00fcne\u015f Paneli \u00dcretim Tesisinin Temeli At\u0131ld\u0131!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/52790\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<p class=\"selectionShareable\" style=\"color: #0a0a0a;\"><strong>Eko Yenilenebilir Enerji Anonim \u015eirketi (EKORE) taraf\u0131ndan, T\u00fcrkiye\u2019nin temiz enerji pot<img loading=\"lazy\" class=\"alignright  wp-image-52791\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/05\/nigdede-gunes-paneli-uretim-tesisinin-temeli-atildi-300x225.jpg\" alt=\"nigdede-gunes-paneli-uretim-tesisinin-temeli-atildi\" width=\"300\" height=\"213\" \/>ansiyeline katk\u0131 sa\u011flayacak 100 MWp kapasiteli G\u00fcne\u015f H\u00fccresi \u00dcretim Tesisinin temeli at\u0131ld\u0131.<\/strong><\/p>\n<p class=\"selectionShareable\" style=\"color: #0a0a0a;\">Bor Karma Organize Sanayi B\u00f6lgesinde EKORE\u2019ye tahsis edilen 32 bin metrekarelik alanda in\u015fas\u0131na ba\u015flanan \u00fcretim tesisi ilk safhada 100 MWp h\u00fccre \u00fcretim kapasitesi ile \u00e7al\u0131\u015facak. Tesisin kapasitesi ek yat\u0131r\u0131mlarla zamanla katlanarak uzun vadede minimum 600 MWp kapasiteye \u00e7\u0131kart\u0131lacak.<\/p>\n<p class=\"selectionShareable\" style=\"color: #0a0a0a;\">EKORE Y\u00f6netim Kurulu Ba\u015fkan\u0131 Serhan S\u00fczer ise g\u00fcne\u015f enerjisinden elektrik \u00fcretmek i\u00e7in en maliyetli kalemi olan g\u00fcne\u015f paneli ve bu panelin kalbinin de g\u00fcne\u015f h\u00fccresi oldu\u011funa i\u015faret etti.<\/p>\n<p class=\"selectionShareable\" style=\"color: #0a0a0a;\">Kaynak: B\u00fcltenler<\/p>\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Eko Yenilenebilir Enerji Anonim \u015eirketi (EKORE) taraf\u0131ndan, T\u00fcrkiye\u2019nin temiz enerji potansiyeline katk\u0131 sa\u011flayacak 100 MWp kapasiteli G\u00fcne\u015f H\u00fccresi \u00dcretim Tesisinin temeli at\u0131ld\u0131. [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":52791,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49],"tags":[29575,25256,63,67,1009,2698,165,227,13,23133,29576,29574,22975,4269,4899],"views":1368,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/52790"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=52790"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/52790\/revisions"}],"predecessor-version":[{"id":52792,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/52790\/revisions\/52792"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/52791"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=52790"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=52790"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=52790"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}