{"id":52548,"date":"2016-05-01T23:14:44","date_gmt":"2016-05-01T20:14:44","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=52548"},"modified":"2016-05-01T23:14:44","modified_gmt":"2016-05-01T20:14:44","slug":"jinkosolardan-asunime-6-9-mwlik-fotovoltaik-modulu-tedarigi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/jinkosolardan-asunime-6-9-mwlik-fotovoltaik-modulu-tedarigi\/","title":{"rendered":"(Turkish) JinkoSolar\u2019dan Asunim&#8217;e 6.9 MW\u2019l\u0131k Fotovoltaik Mod\u00fcl\u00fc Tedari\u011fi&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/52548\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>G\u00fcne\u015f enerjisi FV end\u00fcstrisinin global lideri Jinko Solar Holding Co. Ltd.\u00a0(JinkoSolar), Asunim Yenilenebilir Enerji Teknolojileri \u0130n\u015faat M\u00fchendislik Sanayi Ticaret Ltd. (Asunim) firmas\u0131na T\u00fcrkiye\u2019de kullan\u0131lmak \u00fczere 6.9 MW FV mod\u00fcl\u00fc tedarik etti\u011fini duyurdu.<\/strong><\/p>\n<p>Yap\u0131lan a\u00e7\u0131klamada, &#8220;G\u00fcne\u015f enerji santralinin ba\u015far\u0131l\u0131 yap\u0131m s\u00fcrecinden 6 ay sonra Asunim-Phoenix Solar konsorsiyumu, sistemi aktif hale getirerek <a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/05\/jinkosolardan-asunime-6-9-mwlik-fotovoltaik-modulu-tedarigi.jpg\"><img loading=\"lazy\" class=\"alignleft  wp-image-52549\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/05\/jinkosolardan-asunime-6-9-mwlik-fotovoltaik-modulu-tedarigi-300x110.jpg\" alt=\"jinkosolardan-asunime-6-9-mwlik-fotovoltaik-modulu-tedarigi\" width=\"300\" height=\"175\" \/><\/a>\u015eubat 2016 y\u0131l\u0131nda\u00a0TEDA\u015e\u00a0onay\u0131n\u0131 ald\u0131. JinkoSolar taraf\u0131ndan sa\u011flanan 6.9 MWp\u2019lik y\u00fcksek verimlili\u011fe sahip PID i\u00e7ermeyen 260 Wp mod\u00fcller,\u00a0Kayseri\u00a0b\u00f6lgesinde en b\u00fcy\u00fck sistemlerden biri ve y\u0131lda yakla\u015f\u0131k olarak 11.000.000kWh elektrik \u00fcretmesi \u00f6ng\u00f6r\u00fclmektedir. G\u00fcne\u015f enerji santrali, Ye\u015filhisar Kayseri\u2019de bulunmaktad\u0131r ve olduk\u00e7a zorlu k\u0131\u015f ko\u015fullar\u0131nda ba\u015far\u0131yla in\u015fa edilmi\u015ftir.&#8221;<\/p>\n<p>Jinko Solar\u00a0Avrupa\u00a0Genel M\u00fcd\u00fcr\u00fc Frank Niendorf de \u015fu ifadeleri dile getirdi: &#8220;Olduk\u00e7a zorlu k\u0131\u015f ko\u015fullar\u0131nda bu projeyi ba\u015far\u0131l\u0131 bir \u015fekilde ger\u00e7ekle\u015ftirdikleri i\u00e7in Asunim-Phoenixz Solar konsorsiyumunu tebrik ediyorum. Asunim\u2019un T\u00fcrkiye\u2019deki uzun s\u00fcreli deneyimi ve profesyonel proje planlamalar\u0131n\u0131n bir sonucu olarak ekip, Phoeniz Solar ile birlikte m\u00fckemmel m\u00fchendislik ve Jinko\u2019nun PID i\u00e7ermeyen en etkin ve s\u0131n\u0131f\u0131n\u0131n en iyisi mod\u00fclleri sayesinde ayn\u0131 b\u00f6lgedeki di\u011fer projelerden \u00fcst\u00fcn bir ba\u015fka projeyi T\u00fcrkiye\u2019de ba\u015far\u0131yla y\u00f6netmi\u015ftir.&#8221;<\/p>\n<p>Kaynak: \u0130HA<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.G\u00fcne\u015f enerjisi FV end\u00fcstrisinin global lideri Jinko Solar Holding Co. Ltd.\u00a0(JinkoSolar), Asunim Yenilenebilir Enerji Teknolojileri \u0130n\u015faat M\u00fchendislik Sanayi Ticaret Ltd. (Asunim) firmas\u0131na T\u00fcrkiye\u2019de [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":52549,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49],"tags":[6742,1964,67,1009,2698,165,29443,2326,2569,142,29441,29442,1039,1216],"views":1442,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/52548"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=52548"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/52548\/revisions"}],"predecessor-version":[{"id":52550,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/52548\/revisions\/52550"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/52549"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=52548"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=52548"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=52548"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}