{"id":522,"date":"2012-06-15T11:12:48","date_gmt":"2012-06-15T11:12:48","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=522"},"modified":"2012-06-15T11:16:08","modified_gmt":"2012-06-15T11:16:08","slug":"nukleer-icin-on-hazirlik-mi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/nukleer-icin-on-hazirlik-mi\/","title":{"rendered":"(Turkish) N\u00fckleer \u0130\u00e7in \u00d6n Haz\u0131rl\u0131k m\u0131?"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/522\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<div><strong>Ciner Grubu, \u00c7inli Harbin Electric International ile i\u015fbirli\u011fi anla\u015fmas\u0131 imzalad\u0131.<\/strong><\/div>\n<div>\u00a0<\/div>\n<div><img loading=\"lazy\" class=\"alignright size-full wp-image-523\" title=\"nukleer-on-hazirlik\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2012\/06\/nukleer-on-hazirlik.jpg\" alt=\"\" width=\"280\" height=\"210\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2012\/06\/nukleer-on-hazirlik.jpg 280w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2012\/06\/nukleer-on-hazirlik-66x50.jpg 66w\" sizes=\"(max-width: 280px) 100vw, 280px\" \/>Park Holding, toplam 51 bin megavatl\u0131k y\u0131ll\u0131k \u00fcretim kapasitesiyle i\u015fletmesi ve madencilik alanlar\u0131nda i\u015fbirli\u011fi anla\u015fmas\u0131na imza att\u0131. \u00c7in\u2019in enerji sekt\u00f6r\u00fcndeki k\u00f6kl\u00fc firmas\u0131 Harbin Electric International ile \u00fcretim, santral arbin International\u2019\u0131n 30 bin megavat k\u00f6m\u00fcr, 10 bin megavat hidroelektrik, 6 bin megavat gaz ve 5 bin megavat n\u00fckleer \u00fcretim kapasitesi bulunuyor. Ciner ise T\u00fcrkiye\u2019de enerji ve madencilikte sekt\u00f6r\u00fcnde dev yat\u0131r\u0131mlar\u0131 bulunan en ba\u015far\u0131l\u0131 bir grup. \u00d6zellikle n\u00fckleer enerji alan\u0131nda olduk\u00e7a i\u015ftahl\u0131 olan Ciner Grubu, Ruslar\u2019\u0131n Akkuyu\u2019da in\u015fa edece\u011fi santralin ilk ortaklar\u0131ndan biriydi. Ancak bir s\u00fcre sonra devre d\u0131\u015f\u0131 b\u0131rak\u0131lm\u0131\u015ft\u0131. Sinop\u2019ta yap\u0131lacak ikinci n\u00fckleer santral i\u00e7in de h\u00fck\u00fcmetin aray\u0131\u015flar\u0131 devam ediyor. Ciner Grubu\u2019nun bu b\u00f6lgedeki yat\u0131r\u0131mlarda da pay almak istedi\u011fi biliniyor. \u00d6nce Japonlara ihale edilen ikinci n\u00fckleer santral yat\u0131r\u0131m\u0131 \u00fclkede ya\u015fanan deprem sonras\u0131 ask\u0131y\u0131 al\u0131nm\u0131\u015ft\u0131. G\u00fcney Kore ile g\u00f6r\u00fc\u015fmeler de bir t\u00fcrl\u00fc sonu\u00e7land\u0131r\u0131lamay\u0131nca, \u201c\u00c7in T\u00fcrkiye\u2019deki n\u00fckleer enerji santraline talibiz\u201d a\u00e7\u0131klamas\u0131 yapm\u0131\u015ft\u0131. Bu i\u015fbirli\u011fi i\u015f \u00e7evrelerinde ikinci n\u00fckleer santralinin \u00f6n H\u0131z\u0131rl\u0131\u011f\u0131 olarak yorumlan\u0131yor. Bu arada ge\u00e7ti\u011fimiz g\u00fcnlerde Eti Soda\u2019da hisse sat\u0131\u015f\u0131 i\u00e7in yat\u0131r\u0131m bankalar\u0131na yetki veren Ciner Grubu\u2019nun, Harbin International ile burada da i\u015fbirli\u011fi yapabilece\u011fi s\u00f6yleniyor.Bu arada Park Holding, Kosova\u2019da 600 megavatl\u0131k yeni bir santral yap\u0131m\u0131 ve 600 megavatl\u0131k bir santral\u0131n rehabilitasyonu i\u00e7in k\u0131sa listeye kald\u0131\u011f\u0131 biliniyor. Ciner\u2019in bu yat\u0131r\u0131m\u0131 da \u00c7inli Harbin ile beraber yapmas\u0131 bekleniyor.<\/div>\n<div>\n<p>Harbin\u2019in Hindistan, Vietnam, Banglade\u015f, Pakistan gibi pek \u00e7ok \u00fclkede devam eden projeleri bulunuyor.\u00a0<\/p>\n<p><strong>Kaynak:<\/strong> <a href=\"http:\/\/www.borsagundem.com\/haber\/Nukleer-icin-on-hazirlik-mi-\/100668\" target=\"_blank\">borsagundem.com<\/a><\/p>\n<\/div>\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Ciner Grubu, \u00c7inli Harbin Electric International ile i\u015fbirli\u011fi anla\u015fmas\u0131 imzalad\u0131. \u00a0 Park Holding, toplam 51 bin megavatl\u0131k y\u0131ll\u0131k \u00fcretim kapasitesiyle i\u015fletmesi ve [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":523,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,43],"tags":[67,71],"views":877,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/522"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=522"}],"version-history":[{"count":3,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/522\/revisions"}],"predecessor-version":[{"id":525,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/522\/revisions\/525"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/523"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=522"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=522"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=522"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}