{"id":52010,"date":"2016-04-15T12:57:53","date_gmt":"2016-04-15T09:57:53","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=52010"},"modified":"2016-04-15T12:57:53","modified_gmt":"2016-04-15T09:57:53","slug":"marsan-gunes-paneli-uretecek","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/marsan-gunes-paneli-uretecek\/","title":{"rendered":"(Turkish) Marsan G\u00fcne\u015f Paneli \u00dcretecek&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/52010\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Marsan Marmara Holding, Gebze \u0130MES Organize Sanayi B\u00f6lgesi\u2019nde, Temmuz 2016 tarihinde &#8220;Marsun&#8221; markas\u0131yla g\u00fcne\u015f paneli \u00fcretimine ba\u015flayacak.<\/strong><\/p>\n<p>G\u00fcne\u015f enerjisi alan\u0131nda yat\u0131r\u0131m yapmaya karar veren Marsan Marmara Holding&#8217;in Gebze&#8217;deki fabrikas\u0131, y\u0131l<img loading=\"lazy\" class=\"alignright size-medium wp-image-52011\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/04\/marsan-gunes-paneli-uretecek-300x153.jpg\" alt=\"marsan-gunes-paneli-uretecek\" width=\"300\" height=\"153\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/04\/marsan-gunes-paneli-uretecek-300x153.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/04\/marsan-gunes-paneli-uretecek-500x256.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/04\/marsan-gunes-paneli-uretecek-80x41.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/04\/marsan-gunes-paneli-uretecek.jpg 760w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>da 270 megavat \u00fcretim kapasitesiyle mono, poly, bi-facial ve \u00e7ift \u00e7aml\u0131 g\u00fcne\u015f enerjisi panellerinin \u00fcretimini yapacak.<\/p>\n<p>Holding CEO\u2019su ve eski ba\u015fbakanlardan Tansu \u00c7iller\u2019in o\u011flu Berk \u00c7iller, \u201cVerimli, kaliteli, katma de\u011feri y\u00fcksek g\u00fcne\u015f enerjisi panellerini \u00fcretme stratejisiyle yola \u00e7\u0131kt\u0131k\u201d a\u00e7\u0131klamas\u0131n\u0131 yapt\u0131.<\/p>\n<p>Marsun g\u00fcne\u015f enerjisi panellerine, yurtd\u0131\u015f\u0131ndan sipari\u015flerin geldi\u011fini kaydeden Berk \u00c7iller, \u201cBir y\u0131l\u0131 a\u015fk\u0131n s\u00fcredir, Hollanda, \u00c7in, Tayvan\u2019dan gelen uzmanlar\u0131m\u0131zla \u00e7al\u0131\u015fmaya devam ediyoruz. Temmuz ay\u0131nda faaliyete ge\u00e7ecek olan fabrikam\u0131za, Amerika, Avrupa, Avustralya, Afrika \u00fclkelerinden sipari\u015f al\u0131yoruz. 4 k\u0131tadan ald\u0131\u011f\u0131m\u0131z sipari\u015fle, hemen hemen bu y\u0131l\u0131n ve gelecek y\u0131l\u0131n kapasitesini doldurmak \u00fczereyiz.\u201d dedi.<\/p>\n<p>Eski Ba\u015fbakan Tansu \u00c7iller ve e\u015fi \u00d6zer U\u00e7uran \u00c7iller, \u0130n\u015faat, turizm, gayrimenkul yat\u0131r\u0131m gibi sekt\u00f6rlerde 19 \u015firketiyle 35 y\u0131ld\u0131r faaliyet g\u00f6steren Marsan Marmara Holding\u2019in kurucu ortaklar\u0131.<\/p>\n<p>Kaynak: B\u00fcltenler<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Marsan Marmara Holding, Gebze \u0130MES Organize Sanayi B\u00f6lgesi\u2019nde, Temmuz 2016 tarihinde &#8220;Marsun&#8221; markas\u0131yla g\u00fcne\u015f paneli \u00fcretimine ba\u015flayacak. G\u00fcne\u015f enerjisi alan\u0131nda yat\u0131r\u0131m yapmaya karar [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":52011,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49],"tags":[29128,63,67,1009,2698,165,227,13,23133,142,8255,22975,4269,29126,29129,29127,29130,1854],"views":1122,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/52010"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=52010"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/52010\/revisions"}],"predecessor-version":[{"id":52012,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/52010\/revisions\/52012"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/52011"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=52010"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=52010"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=52010"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}