{"id":51956,"date":"2016-04-14T12:13:40","date_gmt":"2016-04-14T09:13:40","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=51956"},"modified":"2016-04-14T12:13:40","modified_gmt":"2016-04-14T09:13:40","slug":"dogankent-kurtun-ve-torul-hidroelektrik-santralleri-ozellestirilmesine-onay","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/dogankent-kurtun-ve-torul-hidroelektrik-santralleri-ozellestirilmesine-onay\/","title":{"rendered":"(Turkish) Do\u011fankent, K\u00fcrt\u00fcn ve Torul Hidroelektrik Santralleri \u00d6zelle\u015ftirilmesine Onay!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/51956\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<p style=\"color: #0a0a0a;\"><strong>\u00d6zelle\u015ftirme \u0130daresi Ba\u015fkanl\u0131\u011f\u0131, Do\u011fankent, K\u00fcrt\u00fcn ve Torul hidroelektrik santrallerinin \u00f6zelle\u015ftirilmesine izin verdi.<\/strong><span id=\"more-77573\"><\/span><\/p>\n<p style=\"color: #0a0a0a;\">Konuyla ilgili tebli\u011fler Resm<img loading=\"lazy\" class=\"alignleft size-medium wp-image-51957\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/04\/dogankent-kurtun-ve-torul-hidroelektrik-santralleri-ozellestirilmesine-onay-300x200.jpg\" alt=\"dogankent-kurtun-ve-torul-hidroelektrik-santralleri-ozellestirilmesine-onay\" width=\"300\" height=\"200\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/04\/dogankent-kurtun-ve-torul-hidroelektrik-santralleri-ozellestirilmesine-onay-300x200.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/04\/dogankent-kurtun-ve-torul-hidroelektrik-santralleri-ozellestirilmesine-onay-500x333.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/04\/dogankent-kurtun-ve-torul-hidroelektrik-santralleri-ozellestirilmesine-onay-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/04\/dogankent-kurtun-ve-torul-hidroelektrik-santralleri-ozellestirilmesine-onay.jpg 540w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>i Gazete\u2019nin bug\u00fcnk\u00fc say\u0131s\u0131nda yay\u0131mland\u0131.<\/p>\n<p style=\"color: #0a0a0a;\">Buna g\u00f6re, \u00d6zelle\u015ftirme Y\u00fcksek Kurulu, Do\u011fankent, K\u00fcrt\u00fcn ve Torul Hidroelektrik Santralleri ile bu santraller taraf\u0131ndan kullan\u0131lan ta\u015f\u0131nmazlar\u0131 1 milyar 225 milyon 100 bin lira ile en y\u00fcksek teklifi veren Kolin \u0130n\u015faat Turizm Sanayi ve Ticaret A\u015e\u2019ye sat\u0131\u015f\u0131na onay verdi. \u0130halede en y\u00fcksek ikinci teklifi 1 milyar 225 milyon lira ile Bilgin \u2013 Turcas \u2013 Yap\u0131san Ortak Giri\u015fim Grubu verirken, A\u015fkale \u00c7imento Sanayii T\u00fcrk A\u015e 1 milyar 193 milyon lira en y\u00fcksek \u00fc\u00e7\u00fcnc\u00fc teklifi veren \u015firket oldu.<\/p>\n<p style=\"color: #0a0a0a;\">Ayr\u0131ca kurul, \u0130zmir\u2019in Bornova \u0130l\u00e7esindeki \u00c7amdibi Mahallesi\u2019nde yer alan bin 260,00 metrekare y\u00fcz\u00f6l\u00e7\u00fcml\u00fc ta\u015f\u0131nmaz\u0131n \u00f6zelle\u015ftirme kapsam\u0131 ve program\u0131na al\u0131narak, 31 Aral\u0131k 2020 tarihine kadar sat\u0131\u015f y\u00f6ntemiyle \u00f6zelle\u015ftirmesine karar verdi.<\/p>\n<p style=\"color: #0a0a0a;\">Kaynak: Enerji Enstit\u00fcs\u00fc<\/p>\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. \u00d6zelle\u015ftirme \u0130daresi Ba\u015fkanl\u0131\u011f\u0131, Do\u011fankent, K\u00fcrt\u00fcn ve Torul hidroelektrik santrallerinin \u00f6zelle\u015ftirilmesine izin verdi. Konuyla ilgili tebli\u011fler Resmi Gazete\u2019nin bug\u00fcnk\u00fc say\u0131s\u0131nda yay\u0131mland\u0131. Buna g\u00f6re, [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":51957,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,47],"tags":[29070,29071,63,67,1009,2698,165,35370,17183,1090,3239,29072,1248,2998,1388,29073],"views":1098,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/51956"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=51956"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/51956\/revisions"}],"predecessor-version":[{"id":51958,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/51956\/revisions\/51958"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/51957"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=51956"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=51956"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=51956"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}