{"id":51723,"date":"2016-03-17T21:08:00","date_gmt":"2016-03-17T18:08:00","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=51723"},"modified":"2016-03-17T21:08:00","modified_gmt":"2016-03-17T18:08:00","slug":"ruzgar-enerjisinde-general-electric-ve-guristen-dev-isbirligi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/ruzgar-enerjisinde-general-electric-ve-guristen-dev-isbirligi\/","title":{"rendered":"(Turkish) R\u00fczgar Enerjisinde General Electric ve G\u00fcri\u015f&#8217;ten Dev \u0130\u015fbirli\u011fi!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/51723\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<div class=\"entry_content\" style=\"color: #666666;\">\n<p><span style=\"font-weight: bold; color: #222222;\">GE\u2019nin yeni geli\u015ftirdi\u011fi y\u00fcksek \u00fcretim sa\u011flayan 2.75-120 ak\u0131ll\u0131 r\u00fczgar t\u00fcrbini T\u00fcrkiye\u2019de ilk kez G\u00dcR\u0130\u015e\u2019in Afyon\u2019daki Dinar R\u00fczgar Enerji Santrali\u2019nde kullan\u0131lacak.<\/span><\/p>\n<p>GE\u2019nin 31 adet 2.75-120\u00a0<span style=\"font-weight: bold; color: #222222;\">ak\u0131ll\u0131 r\u00fczgar t\u00fcrbini<\/span>, Dinar R\u00fczgar Santrali\u2019nin\u00a0<span style=\"font-weight: bold; color: #222222;\">enerji \u00fcretim kapasitesini<\/span>\u00a0115MW\u2019dan 200 MW\u2019a \u00e7\u0131kararak T\u00fcrkiye\u2019nin\u00a0<span style=\"font-weight: bold; color: #222222;\">yenilene<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/03\/ruzgar-enerjisinde-general-electric-ve-guristen-dev-isbirligi.jpg\"><img loading=\"lazy\" class=\"alignleft  wp-image-51724\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/03\/ruzgar-enerjisinde-general-electric-ve-guristen-dev-isbirligi-300x110.jpg\" alt=\"ruzgar-enerjisinde-general-electric-ve-guristen-dev-isbirligi\" width=\"300\" height=\"192\" \/><\/a>bilir enerji hedeflerini<\/span>\u00a0destekleyecek.<\/p>\n<p>GE\u2019nin yeni geli\u015ftirdi\u011fi y\u00fcksek \u00fcretim sa\u011flayan 2.75-120 ak\u0131ll\u0131\u00a0<span style=\"font-weight: bold; color: #222222;\">r\u00fczgar t\u00fcrbini<\/span>\u00a0T\u00fcrkiye\u2019de ilk kez G\u00dcR\u0130\u015e\u2019in Afyon\u2019daki Dinar R\u00fczgar Enerji Santrali\u2019nde kullan\u0131lacak.<\/p>\n<p>Tesiste yap\u0131lacak kurulum sonras\u0131, toplam\u00a0<span style=\"font-weight: bold; color: #222222;\">kurulu r\u00fczgar enerjisi<\/span>\u00a0g\u00fcc\u00fc 4 bin 718 MW olan \u00fclkemizde, GE\u2019nin\u00a0<span style=\"font-weight: bold; color: #222222;\">kurulu r\u00fczgar enerjisi g\u00fcc\u00fc<\/span>2016 y\u0131l\u0131nda 1.000 MW\u2019\u0131 a\u015fm\u0131\u015f olacak.<\/p>\n<p>General Electric ve G\u00dcR\u0130\u015e Holding aras\u0131nda Aral\u0131k ay\u0131nda imzalanan anla\u015fma kapsam\u0131nda kurulacak t\u00fcrbinler ile Dinar R\u00fczgar Enerjisi Santrali 115 megavat (MW) g\u00fcc\u00fcndeki sahas\u0131n\u0131n kapasitesi 200 MW\u2019a \u00e7\u0131kar\u0131lacak. GE2.75-120\u00a0<span style=\"font-weight: bold; color: #222222;\">r\u00fczgar t\u00fcrbinlerinin<\/span>\u00a0120 metre rotorlar\u0131 ve sayesinde y\u00fcksek enerji \u00fcretimi sa\u011flanacak. GE2.75-120\u00a0<span style=\"font-weight: bold; color: #222222;\">r\u00fczgar t\u00fcrbini<\/span>, y\u00fck y\u00f6netimi kontrol\u00fc, d\u00fc\u015f\u00fck akustik emisyonu, verimli<span style=\"font-weight: bold; color: #222222;\">\u00a0elektrik g\u00fc\u00e7 d\u00f6n\u00fc\u015ft\u00fcr\u00fcc\u00fcs\u00fc<\/span>\u00a0ile g\u00fc\u00e7l\u00fc bir performans sunuyor.<\/p>\n<p>D\u0130NAR R\u00fczgar Enerji Santrali, T\u00fcrkiye\u2019nin 2023 y\u0131l\u0131na kadar\u00a0<span style=\"font-weight: bold; color: #222222;\">r\u00fczgar enerjisi<\/span>\u00a0alan\u0131nda 20 gigavatl\u0131k (GW) toplam kapasiteye ula\u015fmak ve birincil\u00a0<span style=\"font-weight: bold; color: #222222;\">enerjinin<\/span>\u00a0y\u00fczde 30\u2019unun\u00a0<span style=\"font-weight: bold; color: #222222;\">yenilenebilir enerji kaynaklardan<\/span>\u00a0elde etmek y\u00f6n\u00fcndeki hedeflerine ula\u015fmas\u0131na katk\u0131da bulunacak.<\/p>\n<p>G\u00dcR\u0130\u015e Grup \u015eirketleri\u2019nden Mogan Enerji Genel M\u00fcd\u00fcr\u00fc Ali Karaduman:\u201cGE\u2019nin enerji \u00fcretimindeki deneyimi ve yeni geli\u015ftirdi\u011fi\u00a0<span style=\"font-weight: bold; color: #222222;\">ak\u0131ll\u0131 r\u00fczgar t\u00fcrbini teknolojisinin<\/span>\u00a0daha fazla \u00fcretim sa\u011flamas\u0131 karar\u0131m\u0131z a\u00e7\u0131s\u0131ndan \u00e7ok etkili oldu. GE2.75-120\u00a0<span style=\"font-weight: bold; color: #222222;\">r\u00fczgar t\u00fcrbinlerinin<\/span>\u00a0\u00fclkemizde ilk kez Dinar tesisimizde kullan\u0131lacak olmas\u0131ndan ve \u00fclkemizin enerji hedeflerine GE ile i\u015fbirli\u011finde katk\u0131 sa\u011flamaktan mutluluk duyuyoruz. \u201d dedi.<\/p>\n<p>GE T\u00fcrkiye Y\u00f6netim Kurulu Ba\u015fkan\u0131 ve Genel M\u00fcd\u00fcr\u00fc Canan M. \u00d6zsoy: \u201c<span style=\"font-weight: bold; color: #222222;\">Enerji ihtiyac\u0131<\/span>\u00a0g\u00fcn ge\u00e7tik\u00e7e artan \u00fclkemizin\u00a0<span style=\"font-weight: bold; color: #222222;\">r\u00fczgar kayna\u011f\u0131n\u0131<\/span>\u00a0en verimli \u015fekilde kullanmas\u0131, \u00fclkemizin\u00a0<span style=\"font-weight: bold; color: #222222;\">yenilenebilir enerji hedeflerine<\/span>\u00a0ula\u015fmas\u0131nda en \u00f6nemli unsurlardan birini olu\u015fturuyor. 1000 MW\u2019\u0131 a\u015fan kurulu g\u00fcc\u00fcm\u00fcz ile \u00fclkemizin\u00a0<span style=\"font-weight: bold; color: #222222;\">r\u00fczgar enerjisi alan\u0131nda<\/span>\u00a020 GW hedefinin \u00f6nemli bir par\u00e7as\u0131 olman\u0131n gururunu ya\u015f\u0131yoruz. G\u00dcR\u0130\u015e ile yapt\u0131\u011f\u0131m\u0131z i\u015fbirli\u011fi ile T\u00fcrkiye\u2019nin\u00a0<span style=\"font-weight: bold; color: #222222;\">yenilenebilir enerji<\/span>\u00a0portf\u00f6y\u00fcn\u00fc ileri ta\u015f\u0131maktan memnuniyet duyuyoruz\u201d dedi.<\/p>\n<p>G\u00dcR\u0130\u015e Enerji ile yap\u0131lan anla\u015fma kapsam\u0131nda;ta\u015f\u0131ma ve kurulumu ula\u015f\u0131m, y\u00fckleme, g\u00f6revlendirmeyi yapacak olan GE 5 y\u0131l boyunca i\u015fletme ve bak\u0131m \u00e7al\u0131\u015fmalar\u0131n\u0131 da ger\u00e7ekle\u015ftirecek. Tesis Aral\u0131k 2016\u2019da ticari operasyona ba\u015flayacak.<\/p>\n<p>Kaynak: <a href=\"http:\/\/www.alternatifenerji.com\/ruzgar-enerjisinde-general-electric-ve-guris-isbirligi\/\" target=\"_blank\" rel=\"nofollow\">Alternatif Enerji<\/a><\/p>\n<\/div>\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. GE\u2019nin yeni geli\u015ftirdi\u011fi y\u00fcksek \u00fcretim sa\u011flayan 2.75-120 ak\u0131ll\u0131 r\u00fczgar t\u00fcrbini T\u00fcrkiye\u2019de ilk kez G\u00dcR\u0130\u015e\u2019in Afyon\u2019daki Dinar R\u00fczgar Enerji Santrali\u2019nde kullan\u0131lacak. GE\u2019nin 31 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":51724,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,50],"tags":[63,67,1009,2698,165,474,69,16,231,23318,22615,4784],"views":949,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/51723"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=51723"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/51723\/revisions"}],"predecessor-version":[{"id":51725,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/51723\/revisions\/51725"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/51724"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=51723"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=51723"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=51723"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}