{"id":51280,"date":"2016-03-07T06:30:16","date_gmt":"2016-03-07T03:30:16","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=51280"},"modified":"2016-03-07T06:30:16","modified_gmt":"2016-03-07T03:30:16","slug":"filipinlerde-bir-gunde-iki-ges-acilisi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/filipinlerde-bir-gunde-iki-ges-acilisi\/","title":{"rendered":"(Turkish) Filipinler&#8217;de Bir G\u00fcnde \u0130ki GES A\u00e7\u0131l\u0131\u015f\u0131!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/51280\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Filipinler`de bir g\u00fcnde 185 MW kurulu g\u00fcc\u00fcnde iki g\u00fcne\u015f enerjisi santrali a\u00e7\u0131l\u0131\u015f\u0131 yap\u0131ld\u0131.<\/strong><\/p>\n<p>Filipinler`de 3 Mart Per\u015fembe g\u00fcn\u00fc Filipinler \u0130nformasyon Ofisi`nin sahibi oldu\u011fu ve G\u00fcneydo\u011fu Asya`n\u0131n <a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/03\/filipinlerde-bir-gunde-iki-ges-acilisi.jpg\"><img loading=\"lazy\" class=\"alignright size-medium wp-image-51281\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/03\/filipinlerde-bir-gunde-iki-ges-acilisi-300x184.jpg\" alt=\"filipinlerde-bir-gunde-iki-ges-acilisi\" width=\"300\" height=\"184\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/03\/filipinlerde-bir-gunde-iki-ges-acilisi-300x184.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/03\/filipinlerde-bir-gunde-iki-ges-acilisi-80x50.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/03\/filipinlerde-bir-gunde-iki-ges-acilisi.jpg 448w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>en b\u00fcy\u00fck g\u00fcne\u015f santrali olan 135 MW kurulu g\u00fcc\u00fcndeki Cadiz g\u00fcne\u015f santralinin resmi a\u00e7\u0131l\u0131\u015f\u0131 ger\u00e7ekle\u015ftirilirken, Alman Conergy \u015firketi Tarlac`da 50 MW`l\u0131k bir di\u011fer g\u00fcne\u015f santralini devreye ald\u0131.<\/p>\n<p>D\u00fcnyan\u0131n yedinci b\u00fcy\u00fck g\u00fcne\u015f santrali olan Cadiz g\u00fcne\u015f santrali yakla\u015f\u0131k 200 milyon Dolar`a maloldu ve santralin y\u0131lda 188,500 MW saat elektrik \u00fcretmesi planlan\u0131yor. Bunun da yakla\u015f\u0131k 167.526 konutun elektrik ihtiyac\u0131n\u0131 kar\u015f\u0131layaca\u011f\u0131 ve 177.7 milyon litre su tasarrufu sa\u011flayarak her y\u0131l 94.627 ton karbon emisyonunu azaltmas\u0131 \u00f6ng\u00f6r\u00fcl\u00fcyor.<\/p>\n<p>Alman Conergy \u015firketinin Tarlac`da kurdu\u011fu g\u00fcne\u015f santralinin ise y\u0131lda 78.070 MW saat elektrik \u00fcretmesi ve bunun da yakla\u015f\u0131k 31.700 konutun elektrik ihtiyac\u0131n\u0131 kar\u015f\u0131lamas\u0131 bekleniyor.<\/p>\n<p>Bu iki santralin kurulumuyla birlikte Filipinler`de GES say\u0131s\u0131 ona \u00e7\u0131karken, kapasite de 377 MW`a y\u00fckseldi.<\/p>\n<p>Kaynak: <a href=\"http:\/\/enerjigunlugu.net\/filipinlerde-bir-gunde-iki-ges-acilisi_17538.html#.Vtz1FVSLRdg\" target=\"_blank\" rel=\"nofollow\">Enerji G\u00fcnl\u00fc\u011f\u00fc<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Filipinler`de bir g\u00fcnde 185 MW kurulu g\u00fcc\u00fcnde iki g\u00fcne\u015f enerjisi santrali a\u00e7\u0131l\u0131\u015f\u0131 yap\u0131ld\u0131. Filipinler`de 3 Mart Per\u015fembe g\u00fcn\u00fc Filipinler \u0130nformasyon Ofisi`nin sahibi oldu\u011fu [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":51281,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49],"tags":[28824,28822,22160,63,67,1009,2698,165,24394,28823,227,13,23133,22975,4269,28825],"views":693,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/51280"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=51280"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/51280\/revisions"}],"predecessor-version":[{"id":51282,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/51280\/revisions\/51282"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/51281"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=51280"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=51280"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=51280"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}