{"id":51217,"date":"2016-03-04T21:12:10","date_gmt":"2016-03-04T18:12:10","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=51217"},"modified":"2016-03-04T21:12:10","modified_gmt":"2016-03-04T18:12:10","slug":"erzurumda-2424-mwlik-cayasan-hes-kurulacak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/erzurumda-2424-mwlik-cayasan-hes-kurulacak\/","title":{"rendered":"(Turkish) Erzurum&#8217;da 24,24 MW&#8217;l\u0131k \u00c7aya\u015fan HES Kurulacak!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/51217\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Van Elektrik, Erzurum`da Tortum \u00c7ay\u0131 \u00fczerinde 24,24 MW`l\u0131k \u00c7aya\u015fan HES kurmay\u0131 planl\u0131yor.<\/strong><\/p>\n<p>Van Elektrik \u00dcretim San. ve Tic. A.\u015e. taraf\u0131ndan Erzurum \u0130li, Tortum ve Uzundere \u0130l\u00e7eleri, Tortum \u00c7ay\u0131 \u00fcz<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/03\/erzurumda-2424-mwlik-cayasan-hes-kurulacak.jpg\"><img loading=\"lazy\" class=\"alignright size-medium wp-image-51218\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/03\/erzurumda-2424-mwlik-cayasan-hes-kurulacak-300x162.jpg\" alt=\"erzurumda-2424-mwlik-cayasan-hes-kurulacak\" width=\"300\" height=\"162\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/03\/erzurumda-2424-mwlik-cayasan-hes-kurulacak-300x162.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/03\/erzurumda-2424-mwlik-cayasan-hes-kurulacak-500x271.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/03\/erzurumda-2424-mwlik-cayasan-hes-kurulacak-80x43.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/03\/erzurumda-2424-mwlik-cayasan-hes-kurulacak.jpg 619w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>erinde &#8220;\u00c7aya\u015fan Reg\u00fclat\u00f6r\u00fc ve HES (Kurulu G\u00fcc\u00fc 24,98 MWm\/ 24,24 MWe) K\u0131rma-Eleme Y\u0131kama Tesisi ve Haz\u0131r Beton Santralleri ile Malzeme Ocaklar\u0131\u201d projesinin hayata ge\u00e7irilmesi planlan\u0131yor.<\/p>\n<p>\u00c7aya\u015fan Reg\u00fclat\u00f6r\u00fc ve HES projesinin in\u015fas\u0131 ile y\u0131lda toplam 80,66 GWh enerji \u00fcretimi ger\u00e7ekle\u015ftirilecek. \u0130n\u015faat s\u00fcresi 2 y\u0131l olarak \u00f6ng\u00f6r\u00fclen projenin yat\u0131r\u0131m bedeli 230.057.541 TL olarak hesapland\u0131.<\/p>\n<p><strong>PROJE \u0130LE \u0130LG\u0130L\u0130 \u00c7ED S\u00dcREC\u0130 BA\u015eLADI<\/strong><\/p>\n<p>\u00c7evresel Etki De\u011ferlendirmesi \u0130zin ve Denetim Genel M\u00fcd\u00fcrl\u00fc\u011f\u00fc`n\u00fcn yapt\u0131\u011f\u0131 a\u00e7\u0131klamada, proje ile ilgili \u00c7evresel Etki De\u011ferlendirmesi s\u00fcrecinin ba\u015flad\u0131\u011f\u0131 duyuruldu. \u00c7ED S\u00fcreci tamamlanana kadar s\u00fcre\u00e7 ile ilgili her t\u00fcrl\u00fc bilgiler ve projeye ili\u015fkin g\u00f6r\u00fc\u015f, soru ve \u00f6neriler Erzurum Valili\u011fi`ne (\u00c7evre ve \u015eehircilik \u0130l M\u00fcd\u00fcrl\u00fc\u011f\u00fc) veya \u00c7evre ve \u015eehircilik Bakanl\u0131\u011f\u0131\u2019na g\u00f6nderilebilecek.<\/p>\n<p>Kaynak: <a href=\"http:\/\/enerjigunlugu.net\/erzurumda-2424-mwlik-cayasan-hes-kurulacak_17498.html#.VtnPMlSLRdg\" target=\"_blank\" rel=\"nofollow\">Enerji G\u00fcnl\u00fc\u011f\u00fc<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Van Elektrik, Erzurum`da Tortum \u00c7ay\u0131 \u00fczerinde 24,24 MW`l\u0131k \u00c7aya\u015fan HES kurmay\u0131 planl\u0131yor. Van Elektrik \u00dcretim San. ve Tic. A.\u015e. taraf\u0131ndan Erzurum \u0130li, Tortum [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":51218,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,47],"tags":[28807,5927,63,67,1009,2698,165,7708,35370,1090,28806,28805],"views":1421,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/51217"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=51217"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/51217\/revisions"}],"predecessor-version":[{"id":51219,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/51217\/revisions\/51219"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/51218"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=51217"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=51217"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=51217"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}