{"id":51134,"date":"2016-03-03T12:10:42","date_gmt":"2016-03-03T09:10:42","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=51134"},"modified":"2016-03-03T12:12:34","modified_gmt":"2016-03-03T09:12:34","slug":"aksa-enerjiden-ganada-dev-enerji-anlasmasi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/aksa-enerjiden-ganada-dev-enerji-anlasmasi\/","title":{"rendered":"(Turkish) Aksa Enerji\u2019den Gana\u2019da Dev Enerji Anla\u015fmas\u0131!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/51134\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<p style=\"color: #0a0a0a;\"><strong>Aksa Enerji, Gana Cumhuriyeti\u2019nde santral kurulumu ve enerji sat\u0131\u015f\u0131 konusunda anla\u015fmalar\u0131n yap\u0131ld\u0131\u011f\u0131n\u0131 duyurdu. Aksa Enerji, Gana Cumhuriyeti\u2019nde kurulacak 370 MW kurulu g\u00fc\u00e7teki HFO yak\u0131tl\u0131 enerji santrali projesiyle ilgili ya\u015fanan geli\u015fmelerle ilgili kamuoyunu bilgilendirdi.<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/01\/acil-enerji-ihtiyacina-cozum-kiralik-jenerator.jpg\"><img loading=\"lazy\" class=\"alignright size-full wp-image-48944\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/01\/acil-enerji-ihtiyacina-cozum-kiralik-jenerator.jpg\" alt=\"aksa-enerji\" width=\"300\" height=\"300\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/01\/acil-enerji-ihtiyacina-cozum-kiralik-jenerator.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/01\/acil-enerji-ihtiyacina-cozum-kiralik-jenerator-150x150.jpg 150w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/01\/acil-enerji-ihtiyacina-cozum-kiralik-jenerator-50x50.jpg 50w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/strong><\/p>\n<p style=\"color: #0a0a0a;\">\u015eirket\u2019ten Kamuyu Ayd\u0131nlatma Platformu\u2019na yap\u0131lan a\u00e7\u0131klamaya g\u00f6re, santralin in\u015faat\u0131 i\u00e7in gerekli finansman \u00e7al\u0131\u015fmalar\u0131nda finansman sa\u011flayacak bankalar\u0131n komite onaylar\u0131 tamamlan\u0131rken, finansman s\u00f6zle\u015fmesinin m\u00fczakere edilerek Nisan ay\u0131 i\u00e7erisinde tamamlanmas\u0131 \u00f6ng\u00f6r\u00fcl\u00fcyor.<\/p>\n<p style=\"color: #0a0a0a;\">Ayr\u0131ca yat\u0131r\u0131m projesi s\u00fcrerken d\u00f6rd\u00fcnc\u00fc \u00e7eyrek i\u00e7erisinde ilk grup motorlar\u0131n elektrik \u00fcretimine ba\u015flamas\u0131n\u0131n beklendi\u011fini de ifade edildi.<\/p>\n<p style=\"color: #0a0a0a;\">Aksa Enerji taraf\u0131ndan KAP\u2019a yap\u0131lan a\u00e7\u0131klamada \u015f\u00f6yle denildi:<\/p>\n<p style=\"color: #0a0a0a;\">\u201cGana Cumhuriyeti Parlamentosu taraf\u0131ndan onaylanm\u0131\u015f olan ve \u00fcretilen elektri\u011fin tamam\u0131n\u0131n al\u0131m garantili olarak Gana\u2019ya sat\u0131laca\u011f\u0131 anla\u015fma i\u00e7in \u201ctarife onay\u0131\u201d al\u0131nm\u0131\u015ft\u0131r.<\/p>\n<p style=\"color: #0a0a0a;\">Gana Enerji Komisyonu\u2019ndan \u201cToptan Elektrik Sat\u0131\u015f Lisans\u0131\u201d al\u0131nm\u0131\u015ft\u0131r. Aksa Energy Ghana Ltd \u015eti\u2019nin kurulumu tamamlanm\u0131\u015ft\u0131r.<\/p>\n<p style=\"color: #0a0a0a;\">Santralin kurulaca\u011f\u0131 arazi ile ilgili sat\u0131n alma anla\u015fmas\u0131 yap\u0131lm\u0131\u015f ve sahaya giri\u015f sa\u011flanm\u0131\u015ft\u0131r.<\/p>\n<p style=\"color: #0a0a0a;\">Santral arazisinde motorlar\u0131n kurulaca\u011f\u0131 temelin betonlar\u0131 at\u0131lm\u0131\u015f ve saha d\u00fczlenmi\u015f olup, santral binas\u0131n\u0131n \u00e7elik kolonlar\u0131 dikilmeye ba\u015flanacakt\u0131r.<\/p>\n<p style=\"color: #0a0a0a;\">\u00dcretilecek elektri\u011fin ta\u015f\u0131nmas\u0131 i\u00e7in gerekli hat ba\u011flant\u0131 anla\u015fmas\u0131 imzalanm\u0131\u015f ve hatt\u0131n in\u015faat\u0131 i\u00e7in firma se\u00e7imi<br \/>\ntamamlanm\u0131\u015ft\u0131r.<\/p>\n<p style=\"color: #0a0a0a;\">Santralin in\u015faat\u0131 ve elektrik \u00fcretimi i\u00e7in gerekli t\u00fcm in\u015faat ve \u00e7evre izinlerinin al\u0131nmas\u0131 tamamlanm\u0131\u015ft\u0131r.<\/p>\n<p style=\"color: #0a0a0a;\">Bug\u00fcne kadar 30 konteynerdan fazla ekipman sahaya g\u00f6nderilmi\u015f ve her t\u00fcrl\u00fc vergiden muaf olarak \u00fclkeye giri\u015fi sa\u011flanm\u0131\u015ft\u0131r.<\/p>\n<p style=\"color: #0a0a0a;\">Gana\u2019ya g\u00f6nderilecek t\u00fcm ekipman\u0131n bak\u0131mlar\u0131 yap\u0131lm\u0131\u015f, s\u00f6k\u00fcm i\u015flemleri \u015eirketimiz taraf\u0131ndan yap\u0131lm\u0131\u015ft\u0131r. Santralin detayl\u0131 m\u00fchendislik ve dizayn \u00e7al\u0131\u015fmalar\u0131 tamamlanm\u0131\u015ft\u0131r. 5 adet Wartsila V46 motorun santral sahas\u0131na nakli tamamlanm\u0131\u015ft\u0131r. 11 adet Wartsila V46 motorun Gana\u2019ya nakli Mart ay\u0131 i\u00e7erisinde<br \/>\nyap\u0131lacakt\u0131r. 6 adet Wartsila V46 motorun Gana\u2019ya nakli Nisan ay\u0131 i\u00e7erisinde yap\u0131lacakt\u0131r.<\/p>\n<p style=\"color: #0a0a0a;\">S\u00f6zle\u015fmenin en \u00f6nemli maddelerinden olan \u00d6deme Teminat\u0131 i\u00e7in ilgili yerel otoritelerin teyitleri al\u0131nm\u0131\u015f, teminat\u0131 konfirme edecek yabanc\u0131 bankan\u0131n kredi komite onay\u0131na sunulmu\u015ftur.<\/p>\n<p style=\"color: #0a0a0a;\">Santralin in\u015faat\u0131 i\u00e7in gerekli finansman \u00e7al\u0131\u015fmalar\u0131nda finansman sa\u011flayacak bankalar\u0131n komite onaylar\u0131 tamamlanm\u0131\u015f olup, finansman s\u00f6zle\u015fmesinin m\u00fczakere edilerek Nisan ay\u0131 i\u00e7erisinde tamamlanmas\u0131 \u00f6ng\u00f6r\u00fclmektedir.<\/p>\n<p style=\"color: #0a0a0a;\">Yat\u0131r\u0131m projesi t\u00fcm h\u0131z\u0131yla devam etmekte olup, d\u00f6rd\u00fcnc\u00fc \u00e7eyrek i\u00e7erisinde ilk grup motorlar\u0131n elektrik \u00fcretimine ba\u015flamas\u0131 beklenmektedir.<\/p>\n<p style=\"color: #0a0a0a;\">Yukar\u0131daki geli\u015fmelerin \u0131\u015f\u0131\u011f\u0131nda, santralin 2016 y\u0131l\u0131n\u0131n d\u00f6rd\u00fcnc\u00fc \u00e7eyre\u011finde peyder pey devreye girmeye ba\u015flamas\u0131 ile Amerikan Dolar\u0131 baz\u0131nda h\u0131zl\u0131 bir nakit ak\u0131\u015f\u0131 sa\u011flanacakt\u0131r. Operasyonel karl\u0131l\u0131\u011f\u0131m\u0131z\u0131 ciddi \u015fekilde art\u0131racak santral, \u015eirketimizi potansiyel kur fark\u0131 zararlar\u0131ndan do\u011fal olarak koruyacakt\u0131r.\u201d<\/p>\n<p style=\"color: #0a0a0a;\">Kaynak: B\u00fcltenler<\/p>\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Aksa Enerji, Gana Cumhuriyeti\u2019nde santral kurulumu ve enerji sat\u0131\u015f\u0131 konusunda anla\u015fmalar\u0131n yap\u0131ld\u0131\u011f\u0131n\u0131 duyurdu. Aksa Enerji, Gana Cumhuriyeti\u2019nde kurulacak 370 MW kurulu g\u00fc\u00e7teki [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":48944,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53],"tags":[1571,28757,63,67,1009,2698,3507,165,1975,24797,28758],"views":777,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/51134"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=51134"}],"version-history":[{"count":2,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/51134\/revisions"}],"predecessor-version":[{"id":51136,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/51134\/revisions\/51136"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/48944"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=51134"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=51134"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=51134"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}