{"id":51095,"date":"2016-03-02T10:39:04","date_gmt":"2016-03-02T07:39:04","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=51095"},"modified":"2016-03-02T10:39:04","modified_gmt":"2016-03-02T07:39:04","slug":"tskbden-turcas-bm-kuyucak-jeotermale-kredi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/tskbden-turcas-bm-kuyucak-jeotermale-kredi\/","title":{"rendered":"(Turkish) TSKB&#8217;den Turcas BM Kuyucak Jeotermal&#8217;e Kredi&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/51095\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Turcas BM Kuyucak Jeotermal Elektrik \u00dcretim A.\u015e. ile T\u00fcrkiye S\u0131nai Kalk\u0131nma Bankas\u0131 A.\u015e.(TSKB) aras\u0131nda kredi s\u00f6zle\u015fmesi imzaland\u0131.<img loading=\"lazy\" class=\"alignright  wp-image-51096\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/03\/tskbden-turcas-bm-kuyucak-jeotermale-kredi-300x240.jpg\" alt=\"tskbden-turcas-bm-kuyucak-jeotermale-kredi\" width=\"300\" height=\"198\" \/><\/strong><\/p>\n<p>Turcas Petrol`den KAP`a yap\u0131lan a\u00e7\u0131klamaya g\u00f6re,%46 oran\u0131ndaki dolayl\u0131 i\u015ftiraki Turcas BM Kuyucak Jeotermal Elektrik \u00dcretim A.\u015e. ile T\u00fcrkiye S\u0131nai Kalk\u0131nma Bankas\u0131 A.\u015e. aras\u0131nda 15 milyon Euro ve 40,5 milyon ABD Dolar\u0131 tutar\u0131nda nakdi ve\/veya gayrinakdi ve 10 milyon T\u00fcrk Liras\u0131 tutar\u0131nda gayrinakdi, azami 30 ay anapara geri \u00f6demesiz olmak \u00fczere toplam 14 y\u0131l vadeli kredi s\u00f6zle\u015fmesi 1 Mart 2016 tarihinde imzaland\u0131.<\/p>\n<p>Bahsi ge\u00e7en kredi, TBK`n\u0131n Ayd\u0131n ili Kuyucak il\u00e7esindeki 16 MW kurulu g\u00fcc\u00fcnde olmas\u0131 planlanan toplam 71 milyon 250 bin ABD Dolar\u0131 (finansman maliyetleri dahil) tutar\u0131ndaki jeotermal elektrik \u00fcretim santrali yat\u0131r\u0131m\u0131n\u0131n finansman\u0131nda kullan\u0131lacak. S\u00f6z konusu santral yat\u0131r\u0131m\u0131n\u0131n 8 MW`l\u0131k ilk faz\u0131n\u0131n 2017 y\u0131l\u0131n\u0131n \u00fc\u00e7\u00fcnc\u00fc \u00e7eyre\u011finde, ikinci faz\u0131n\u0131n ise 2018 y\u0131l\u0131n\u0131n \u00fc\u00e7\u00fcnc\u00fc \u00e7eyre\u011finde ticari i\u015fletmeye ge\u00e7mesi planlan\u0131yor.<\/p>\n<p>Kaynak: <a href=\"http:\/\/enerjigunlugu.net\/tskbden-turcas-bm-kuyucak-jeotermale-kredi_17481.html#.VtaXkFSLRdg\" target=\"_blank\" rel=\"nofollow\">Enerji G\u00fcnl\u00fc\u011f\u00fc<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Turcas BM Kuyucak Jeotermal Elektrik \u00dcretim A.\u015e. ile T\u00fcrkiye S\u0131nai Kalk\u0131nma Bankas\u0131 A.\u015e.(TSKB) aras\u0131nda kredi s\u00f6zle\u015fmesi imzaland\u0131. Turcas Petrol`den KAP`a yap\u0131lan a\u00e7\u0131klamaya g\u00f6re,%46 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":51096,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,48],"tags":[63,67,1009,2698,165,58,56,23226,22984,23225,2712,1489,28738],"views":1230,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/51095"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=51095"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/51095\/revisions"}],"predecessor-version":[{"id":51097,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/51095\/revisions\/51097"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/51096"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=51095"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=51095"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=51095"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}