{"id":50989,"date":"2016-02-28T22:09:18","date_gmt":"2016-02-28T19:09:18","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=50989"},"modified":"2016-02-28T22:09:18","modified_gmt":"2016-02-28T19:09:18","slug":"iran-ve-azerbaycan-aras-nehrine-hes-kuracak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/iran-ve-azerbaycan-aras-nehrine-hes-kuracak\/","title":{"rendered":"(Turkish) \u0130ran ve Azerbaycan Aras Nehrine HES Kuracak!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/50989\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>\u0130ran ve Azerbaycan Ar<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/02\/iran-ve-azerbaycan-aras-nehrine-hes-kuracak.jpg\"><img loading=\"lazy\" class=\"alignleft size-medium wp-image-50990\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/02\/iran-ve-azerbaycan-aras-nehrine-hes-kuracak-300x225.jpg\" alt=\"iran-ve-azerbaycan-aras-nehrine-hes-kuracak\" width=\"300\" height=\"225\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/02\/iran-ve-azerbaycan-aras-nehrine-hes-kuracak-300x225.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/02\/iran-ve-azerbaycan-aras-nehrine-hes-kuracak-500x375.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/02\/iran-ve-azerbaycan-aras-nehrine-hes-kuracak-66x50.jpg 66w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/02\/iran-ve-azerbaycan-aras-nehrine-hes-kuracak.jpg 900w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>as nehri \u00fczerinde 36 MW kurulu g\u00fcc\u00fcnde iki hidroelektrik santral kuracak.<\/strong><\/p>\n<p>\u0130ran haber ajans\u0131 Shana`n\u0131n bug\u00fcnk\u00fc haberine g\u00f6re, \u0130ran ve Azerbaycan iki \u00fclke aras\u0131nda s\u0131n\u0131r nehri olan Aras \u00fczerinde iki hidroelektrik santral kurmak i\u00e7in anla\u015fmaya vard\u0131lar.<\/p>\n<p>Baz\u0131 Azeri haber ajanslar\u0131na g\u00f6re, iki \u00fclke aras\u0131nda Tebriz`de yap\u0131lan toplant\u0131da Aras nehri \u00fczerinde 36 MW kurulu g\u00fcc\u00fcnde iki hidroelektrik santrali kurulmas\u0131 kararla\u015ft\u0131r\u0131ld\u0131.<\/p>\n<p>\u0130ki \u00fclke ilk olarak on ay haz\u0131rl\u0131k ve ara\u015ft\u0131rma \u00e7al\u0131\u015fmas\u0131 y\u00fcr\u00fctecek. Sonu\u00e7lar bir sonraki \u0130ran-Azerbaycan Ortak Ekonomik Komite toplant\u0131s\u0131nda tekrar ele al\u0131nacak.<\/p>\n<p>Kaynak: <a href=\"http:\/\/enerjigunlugu.net\/iran-ve-azerbaycan-aras-nehrine-hes-kuracak_17444.html#.VtNFN1SLRdg\" target=\"_blank\" rel=\"nofollow\">Enerji G\u00fcnl\u00fc\u011f\u00fc<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.\u0130ran ve Azerbaycan Aras nehri \u00fczerinde 36 MW kurulu g\u00fcc\u00fcnde iki hidroelektrik santral kuracak. \u0130ran haber ajans\u0131 Shana`n\u0131n bug\u00fcnk\u00fc haberine g\u00f6re, \u0130ran ve [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":50990,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,47],"tags":[10044,4319,63,67,1009,2698,165,35370,1090,1333],"views":1291,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/50989"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=50989"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/50989\/revisions"}],"predecessor-version":[{"id":50991,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/50989\/revisions\/50991"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/50990"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=50989"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=50989"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=50989"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}