{"id":50921,"date":"2016-02-26T21:29:18","date_gmt":"2016-02-26T18:29:18","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=50921"},"modified":"2016-02-26T21:29:18","modified_gmt":"2016-02-26T18:29:18","slug":"lisanssiz-elektrik-gucu-354-mwa-yukseldi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/lisanssiz-elektrik-gucu-354-mwa-yukseldi\/","title":{"rendered":"(Turkish) Lisanss\u0131z Elektrik G\u00fcc\u00fc 354 MW\u2019a Y\u00fckseldi&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/50921\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Ge\u00e7en ay toplam kurulu g\u00fc\u00e7leri 43,6 MW olan 48 lisanss\u0131z elektrik \u00fcretim projesinin devreye girdi\u011fi bildirildi.<\/strong><\/p>\n<p>T\u00fcrkiye Elektrik \u0130letim A.\u015e. taraf\u0131ndan a\u00e7\u0131klanan bilgilere g\u00f6re ge\u00e7en ay devreye giren bu projelerin 41,2 MW g\u00fcc\u00fcndeki 47 adedini g\u00fcne\u015f enerji<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/02\/lisanssiz-elektrik-gucu-354-mwa-yukseldi.jpg\"><img loading=\"lazy\" class=\"alignleft size-medium wp-image-50922\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/02\/lisanssiz-elektrik-gucu-354-mwa-yukseldi-300x163.jpg\" alt=\"lisanssiz-elektrik-gucu-354-mwa-yukseldi\" width=\"300\" height=\"163\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/02\/lisanssiz-elektrik-gucu-354-mwa-yukseldi-300x163.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/02\/lisanssiz-elektrik-gucu-354-mwa-yukseldi-80x43.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/02\/lisanssiz-elektrik-gucu-354-mwa-yukseldi.jpg 460w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>si yat\u0131r\u0131mlar\u0131 olu\u015ftururken, 2,5 MW g\u00fcc\u00fcnde bir r\u00fczgar enerjisi yat\u0131r\u0131m\u0131 devreye girdi.<\/p>\n<p>Devreye giren son projeler sonras\u0131nda T\u00fcrkiye\u2019nin lisanss\u0131z alandaki toplam elektrik \u00fcretim kapasitesi 354,3 MW\u2019a, toplam proje say\u0131s\u0131 ise 444 adede y\u00fckseldi.<\/p>\n<p>Bu projelerin 290 MW g\u00fcc\u00fcndeki 409 adedini g\u00fcne\u015f enerjisi yat\u0131r\u0131mlar\u0131, 7,3 MW g\u00fcc\u00fcndeki 10 adedini r\u00fczgar enerjisi yat\u0131r\u0131mlar\u0131 ve 56,5 MW g\u00fcc\u00fcndeki 24 adedini termik santral yat\u0131r\u0131mlar\u0131 olu\u015fturuyor.<\/p>\n<p>Lisanss\u0131z elektrik \u00fcretim santrallerinin ge\u00e7en ayki toplam elektrik \u00fcretimindeki paylar\u0131 ise y\u00fczde 0,5 olurken, g\u00fcne\u015f enerjisi projelerinin bu \u00fcretimdeki pay\u0131 ise tek ba\u015f\u0131na y\u00fczde 0,4 oldu.<\/p>\n<p>TE\u0130A\u015e verilerine g\u00f6re T\u00fcrkiye\u2019nin toplam elektrik \u00fcretim kapasitesi ise 73.427,4 MW\u2019a ula\u015fm\u0131\u015f durumda.<\/p>\n<p>Kaynak: <a href=\"http:\/\/yesilekonomi.com\/yenilenebilir-enerji\/lisanssiz-elektrik-gucu-354-mwa-yukseldi\" target=\"_blank\" rel=\"nofollow\">Ye\u015fil Ekonomi<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Ge\u00e7en ay toplam kurulu g\u00fc\u00e7leri 43,6 MW olan 48 lisanss\u0131z elektrik \u00fcretim projesinin devreye girdi\u011fi bildirildi. T\u00fcrkiye Elektrik \u0130letim A.\u015e. taraf\u0131ndan a\u00e7\u0131klanan bilgilere [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":50922,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53],"tags":[19,63,67,1009,2698,165,3518,2282,4309,105],"views":975,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/50921"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=50921"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/50921\/revisions"}],"predecessor-version":[{"id":50923,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/50921\/revisions\/50923"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/50922"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=50921"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=50921"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=50921"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}