{"id":50098,"date":"2016-02-08T02:12:45","date_gmt":"2016-02-07T23:12:45","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=50098"},"modified":"2016-02-08T02:12:45","modified_gmt":"2016-02-07T23:12:45","slug":"fasin-2-gwlik-gunes-enerjisi-projenin-ilk-bolumu-tamamlandi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/fasin-2-gwlik-gunes-enerjisi-projenin-ilk-bolumu-tamamlandi\/","title":{"rendered":"(Turkish) Fas\u2019\u0131n 2 GW\u2019l\u0131k G\u00fcne\u015f Enerjisi Projenin \u0130lk B\u00f6l\u00fcm\u00fc Tamamland\u0131&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/50098\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<p style=\"color: #444444;\"><strong>Tamamland\u0131\u011f\u0131 zaman 2.000 MW\u2019l\u0131k kurulu g\u00fcce ula\u015facak Noor g\u00fcne\u015f enerjisi projesinin ilk faz\u0131 Fas Kral\u0131 6. Muhammed taraf\u0131ndan 4 \u015eubat 2016 g\u00fcn\u00fc resmi olarak a\u00e7\u0131ld\u0131.<\/strong><\/p>\n<p style=\"color: #444444;\">160 MW g\u00fcc\u00fcndeki Varzazat yo\u011funla\u015ft\u0131r\u0131lm\u0131\u015f g\u00fcne\u015f enerjisi santrali (CSP) ge\u00e7en y\u0131l\u0131n Aral\u0131k ay\u0131nda tama<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/02\/fasin-2-gwlik-gunes-enerjisi-projenin-ilk-bolumu-tamamlandi.jpg\"><img loading=\"lazy\" class=\"alignright size-medium wp-image-50099\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/02\/fasin-2-gwlik-gunes-enerjisi-projenin-ilk-bolumu-tamamlandi-300x163.jpg\" alt=\"fasin-2-gwlik-gunes-enerjisi-projenin-ilk-bolumu-tamamlandi\" width=\"300\" height=\"163\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/02\/fasin-2-gwlik-gunes-enerjisi-projenin-ilk-bolumu-tamamlandi-300x163.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/02\/fasin-2-gwlik-gunes-enerjisi-projenin-ilk-bolumu-tamamlandi-80x43.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/02\/fasin-2-gwlik-gunes-enerjisi-projenin-ilk-bolumu-tamamlandi.jpg 460w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>mlanm\u0131\u015f fakat resmi a\u00e7\u0131l\u0131\u015f\u0131 a\u00e7\u0131klanmayan bir nedenle \u015eubat ay\u0131na ertelenmi\u015fti.<\/p>\n<p style=\"color: #444444;\">Proje Fas\u2019\u0131n iklim de\u011fi\u015fikli\u011fi ile m\u00fccadelesi ve Fas G\u00fcne\u015f Plan\u0131 kapsam\u0131nda yap\u0131lacak \u00e7al\u0131\u015fmalar\u0131 geli\u015ftirmek ve y\u00f6netmek amac\u0131 ile kurulan Fas G\u00fcne\u015f Enerjisi Ajans\u0131 taraf\u0131ndan geli\u015ftirildi.<\/p>\n<p style=\"color: #444444;\">Projenin yat\u0131r\u0131mc\u0131s\u0131 Suudi Arabistanl\u0131 Acwa Power \u015firketi olurken, m\u00fchendislik, tedarik ve in\u015faat \u00e7al\u0131\u015fmalar\u0131 ise \u0130spanyol Sener ve Acciona ile \u00c7inli Sepco ve Power China \u015firketleri taraf\u0131ndan ger\u00e7ekle\u015ftirildi.<\/p>\n<p style=\"color: #444444;\">35 futbol sahas\u0131 b\u00fcy\u00fckl\u00fc\u011f\u00fcnde bir alan\u0131 kapsayan Noor-I santrali 500 bin parabolik aynadan olu\u015fuyor.<\/p>\n<p style=\"color: #444444;\">Bu aynalar toplad\u0131klar\u0131 g\u00fcne\u015f \u0131\u015f\u0131\u011f\u0131 ile ortalar\u0131ndan ge\u00e7en borular\u0131n i\u00e7indeki erimi\u015f tuzun s\u0131cakl\u0131\u011f\u0131n\u0131 428 dereceye kadar y\u00fckseltiyorlar. Elde edilen bu s\u0131cakl\u0131k ile de yak\u0131nlardaki bir kaynaktan elde edilen suyun buharla\u015ft\u0131r\u0131lmas\u0131, bu buhar ile de santraldeki t\u00fcrbinlerin d\u00f6nd\u00fcr\u00fclerek elektrik \u00fcretimi sa\u011flanmas\u0131 m\u00fcmk\u00fcn oluyor.<\/p>\n<p style=\"color: #444444;\">Parabolik aynal\u0131 sisteme sahip Noor-I santralindeki 500 bin parabolik ayna g\u00fcne\u015f \u0131\u015f\u0131\u011f\u0131n\u0131 kullanarak borular\u0131n i\u00e7indeki erimi\u015f tuzu 428 dereceye kadar \u0131s\u0131tacak. Bu madde g\u00fcne\u015f batt\u0131ktan sonraki 3 saat boyunca da s\u0131cakl\u0131\u011f\u0131 muhafaza ederek elektrik \u00fcretiminin devam\u0131na m\u00fcmk\u00fcn k\u0131labilecek.<\/p>\n<p style=\"color: #444444;\"><img loading=\"lazy\" class=\"aligncenter\" src=\"http:\/\/yesilekonomi.com\/usrfiles\/images\/noor-1-2.jpg\" alt=\"\" width=\"483\" height=\"315\" \/><\/p>\n<p style=\"color: #444444;\">Projenin sonraki a\u015famas\u0131 olacak Noor-II 200 MW, Noor-III ise 150 MW kurulu g\u00fcce sahip olacak. Bu santrallerde elde edilen s\u0131cakl\u0131\u011f\u0131n muhafaza s\u00fcresi ise 7 saat olabilecek.<\/p>\n<p style=\"color: #444444;\">Santralde \u00fcretilen elektri\u011fe sabit bir al\u0131m fiyat\u0131 uygulanm\u0131yor. Fas G\u00fcne\u015f Enerjisi \u0130daresi\u2019nin a\u00e7\u0131klamas\u0131na g\u00f6re ise Noor-I\u00a0 projesinde \u00fcretilen elektrik Fas elektrik da\u011f\u0131t\u0131m \u015firketine kilovat-saat ba\u015f\u0131na 1,62 Fas Dirhem ile (17 dolar-sent) Fas elektrik da\u011f\u0131t\u0131m \u015firketine sat\u0131labilecek iken, bu rakam Noor-II projesi i\u00e7in 1,36 dirhem (14 dolar-sent) , Noor-III projesi i\u00e7in 1,42 dirhem (15 dolar-sent)\u00a0 olarak uygulanacak.<\/p>\n<p style=\"color: #444444;\">Projenin d\u00f6rd\u00fcnc\u00fc a\u015famas\u0131 ise 70 MW g\u00fcc\u00fcnde bir fotovoltaik santralden olu\u015facak.<\/p>\n<p style=\"color: #444444;\">\u0130leriki a\u015famalarda ise\u00a0 80 MW g\u00fcc\u00fcnde olacak NOOR Laayoune ve 20 MW g\u00fcc\u00fcnde olacak NOOR Boujdour fotovoltaik santralleri devreye al\u0131nacak.<\/p>\n<p style=\"color: #444444;\">Noor projesi termal ve fotovoltaik g\u00fcne\u015f enerjisi teknolojilerinin kullan\u0131laca\u011f\u0131 NOOR Midelt\u00a0 ve Noor Tata santralleri ile geni\u015flemeye devam edecek.<\/p>\n<p style=\"color: #444444;\">2020 y\u0131l\u0131nda elektrik \u00fcretiminin y\u00fczde 42\u2019sini yenilenebilir enerji kaynaklar\u0131ndan sa\u011flamay\u0131 hedefleyen Fas hali haz\u0131rda bu ihtiyac\u0131n\u0131 y\u00fczde 97 oran\u0131nda fosil yak\u0131t ithali ile kar\u015f\u0131layabiliyor.<\/p>\n<p style=\"color: #444444;\">Bununla birlikte Fas 2030 y\u0131l\u0131 karbondioksit sal\u0131mlar\u0131n\u0131n, ola\u011fan senaryoya g\u00f6re, y\u00fczde 32 oran\u0131nda daha az ger\u00e7ekle\u015fece\u011fi taahh\u00fcd\u00fcnde bulunmu\u015ftu.<\/p>\n<p style=\"color: #444444;\">Kaynak: <a href=\"http:\/\/yesilekonomi.com\/yenilenebilir-enerji\/fasin-2-gwlik-gunes-enerjisi-projenin-ilk-bolumu-tamamlandi\" target=\"_blank\" rel=\"nofollow\">Ye\u015fil Ekonomi<\/a><\/p>\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Tamamland\u0131\u011f\u0131 zaman 2.000 MW\u2019l\u0131k kurulu g\u00fcce ula\u015facak Noor g\u00fcne\u015f enerjisi projesinin ilk faz\u0131 Fas Kral\u0131 6. Muhammed taraf\u0131ndan 4 \u015eubat 2016 g\u00fcn\u00fc [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":50099,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49],"tags":[63,67,1009,2698,165,15126,2326,227,13,2569,23133,22975,4269,28385],"views":979,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/50098"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=50098"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/50098\/revisions"}],"predecessor-version":[{"id":50100,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/50098\/revisions\/50100"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/50099"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=50098"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=50098"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=50098"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}