{"id":50089,"date":"2020-06-01T06:00:40","date_gmt":"2020-06-01T03:00:40","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=50089"},"modified":"2020-08-01T14:45:27","modified_gmt":"2020-08-01T11:45:27","slug":"gunes-santrali-ges-cagri-mektubu-ve-tedas-proje-onayi-hizmetleri","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/gunes-santrali-ges-cagri-mektubu-ve-tedas-proje-onayi-hizmetleri\/","title":{"rendered":"(Turkish) G\u00fcne\u015f Santrali ( GES ) \u00c7a\u011fr\u0131 Mektubu ve TEDA\u015e Proje Onay\u0131 Hizmetleri"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/50089\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1>1\u00a0MW \u00c7at\u0131 ve Tarla \u00dcst\u00fc G\u00fcne\u015f Enerjisi Santrali Projesi EDA\u015e\u00a0\u00c7a\u011fr\u0131 Mektubu ve TEDA\u015e Proje Onay\u0131 Hizmeti<\/h1>\n<h2><strong>\u00c7at\u0131 ve Tarla \u00dcst\u00fc G\u00fcne\u015f Enerjisi Santrali Kurulumuna Uygun Arazi Tespiti, Arazilerin Geli\u015ftirilmesi ve Sahibi Olunan Arazilerin Uygunlu\u011funun <span style=\"text-decoration: underline;\">Ara\u015ft\u0131r\u0131lmas\u0131 ve S\u00fcre\u00e7leri;<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/02\/ges-cagri-mektubu-ve-tedas-proje-onayi-hizmetleri.jpg\"><img loading=\"lazy\" class=\"alignright size-medium wp-image-50090\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/02\/ges-cagri-mektubu-ve-tedas-proje-onayi-hizmetleri-300x232.jpg\" alt=\"ges-cagri-mektubu-ve-tedas-proje-onayi-hizmetleri\" width=\"300\" height=\"232\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/02\/ges-cagri-mektubu-ve-tedas-proje-onayi-hizmetleri-300x232.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/02\/ges-cagri-mektubu-ve-tedas-proje-onayi-hizmetleri-64x50.jpg 64w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/02\/ges-cagri-mektubu-ve-tedas-proje-onayi-hizmetleri.jpg 340w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/span><\/strong><\/h2>\n<p>&#8211; Yat\u0131r\u0131m i\u00e7in uygun arazilerin bulunmas\u0131, arazilerin yat\u0131r\u0131ma elveri\u015flili\u011finin de\u011ferlendirilmesi, trafo\u00a0kapasitesinin kontrol\u00fc,<\/p>\n<p>&#8211; Arazilerin y\u0131ll\u0131k g\u00fcne\u015f radyasyon oranlar\u0131, e\u011fimleri ve g\u00fcne\u015flenme saatleri vb. gibi teknik detaylar bak\u0131m\u0131ndan de\u011ferlendirilmesi,<\/p>\n<p>&#8211; Kurulacak olan santralin, ba\u011flant\u0131 yap\u0131laca\u011f\u0131 <strong>Trafo Merkezi (T.M)<\/strong> kapasitesinin de\u011ferlendirilmesi<\/p>\n<h2><strong>\u00c7at\u0131 ve Tarla \u00dcst\u00fc G\u00fcne\u015f Enerjisine Dayal\u0131 Projelerin <span style=\"text-decoration: underline;\">Onay S\u00fcreci;<\/span><\/strong><\/h2>\n<p>&#8211; Kendisine Ba\u011flant\u0131 Anla\u015fmas\u0131na \u00c7a\u011fr\u0131 Mektubu g\u00f6nderilen ger\u00e7ek veya t\u00fczel ki\u015filere, s\u00f6z konusu su kullan\u0131m hakk\u0131 izin belgesinin al\u0131nma veya Ba\u011flant\u0131 Anla\u015fmas\u0131na \u00c7a\u011fr\u0131 Mektubunun tebli\u011f tarihinden itibaren y\u00fczseksen g\u00fcn s\u00fcre verilir.<\/p>\n<p>Ger\u00e7ek veya t\u00fczel ki\u015filer s\u00f6z konusu s\u00fcrenin ilk doksan g\u00fcn\u00fc i\u00e7erisinde \u00fcretim tesisi ve varsa irtibat hatt\u0131 projesini TEDA\u015e\u2019a sunar. (Doksan g\u00fcn i\u00e7inde proje onay\u0131 i\u00e7in ba\u015fvuruda bulunmayan ger\u00e7ek veya t\u00fczel ki\u015filerin ba\u011flant\u0131 ba\u015fvurular\u0131 ge\u00e7ersiz say\u0131larak sunmu\u015f olduklar\u0131 belgeler kendilerine iade edilir.)<\/p>\n<h2><strong>\u00c7at\u0131 \u00dcst\u00fc GES Projeniz 50 kW\u2019tan B\u00fcy\u00fck m\u00fc?<\/strong><\/h2>\n<p>1.)\u200bE\u011fer projeniz 50kW&#8217;tan k\u00fc\u00e7\u00fckse;\u00a0Proje Onay Ba\u015fvurunuz TEDA\u015e B\u00f6lge Koordinat\u00f6rl\u00fcklerine Yap\u0131l\u0131r<\/p>\n<p>2.)B\u00fcy\u00fckse;\u00a0Proje Onay Ba\u015fvurunuz TEDA\u015e Genel M\u00fcd\u00fcrl\u00fc\u011f\u00fcne Yap\u0131l\u0131r.<\/p>\n<h2><strong>\u00c7at\u0131 \u00dcst\u00fc \/ Tarla GES \u00dcretim Tesisi Tipi Nedir?<\/strong><\/h2>\n<h3><strong>3.a-)\u00a0\u00c7at\u0131 ve Cephe Uygulamal\u0131 GES Projesi<\/strong><\/h3>\n<p>3.a-) \u00c7at\u0131 ve cephe uygulamal\u0131 g\u00fcne\u015f elektrik santrali ve yard\u0131mc\u0131 tesisleri proje onay\u0131 i\u00e7in sunulan elektrik klas\u00f6rlerinde olmas\u0131 gerekenler \u015funlard\u0131r;<\/p>\n<h3><strong>3.a.a-)\u00a0Belgeler;<\/strong><\/h3>\n<p>1-)\u0130lgili da\u011f\u0131t\u0131m \u015firketinden al\u0131nan \u201cBa\u011flant\u0131 G\u00f6r\u00fc\u015f\u00fc\u201d ve \u201cBa\u011flant\u0131 Anla\u015fmas\u0131na \u00c7a\u011fr\u0131 Mektubu\u201d yaz\u0131lar\u0131.<\/p>\n<p>2-)\u00c7at\u0131 veya cephe uygulamal\u0131 g\u00fcne\u015f elektrik santrali kurulmas\u0131 sonucunda meydana gelen ek y\u00fcklere (kar, buz ve r\u00fczgar y\u00fck\u00fc ve tesis edilecek g\u00fcne\u015f enerji sistemi y\u00fck\u00fc) kar\u015f\u0131 binan\u0131n uygun oldu\u011funa ve \u00e7at\u0131 ve\/veya cephe uygulamal\u0131 GES tesisinin yap\u0131labilece\u011fine dair \u0130l \u00d6zel \u0130daresi veya Belediyeden onaylanm\u0131\u015f uygunluk yaz\u0131s\u0131.<\/p>\n<p>3-)Sistem Temel Bilgi Formu (EK-A) a. Tesiste kullan\u0131lacak olan g\u00fcne\u015f enerjisi teknolojisine ait her bir ekipman\u0131n (pv mod\u00fcl\u00fc, invert\u00f6r, yans\u0131t\u0131c\u0131 y\u00fczey, odaklay\u0131c\u0131 sistemi, vb.) elektriksel ve fiziksel teknik \u00f6zellikleri<\/p>\n<p>4-)Sistem Tasar\u0131mc\u0131s\u0131 Bilgileri (Sistemi tasarlayan \u015firket bilgisi, irtibat ki\u015fisi ve ileti\u015fim bilgileri (posta adresi, telefon numaras\u0131 ve e-posta adresi)<\/p>\n<p>5-)Elektrik Tesisleri Proje Y\u00f6netmeli\u011fine uygun olarak di\u011fer gerekli belgeler,<\/p>\n<h3><strong>3.a.b-)\u00a0Hesaplar;<\/strong><\/h3>\n<p>1-)G\u00fc\u00e7 kayb\u0131, gerilim d\u00fc\u015f\u00fcm\u00fc ve ak\u0131m ta\u015f\u0131ma kontrol\u00fcn\u00fc g\u00f6sterir do\u011fru ak\u0131m (DC) kablo hesaplar\u0131,<\/p>\n<p>2-)Panel se\u00e7im, maksimum ve minimum evirici DC giri\u015f gerilim kontrol\u00fcn\u00fc g\u00f6sterir hesaplar,<\/p>\n<p>3-)Gerilim d\u00fc\u015f\u00fcm\u00fc, ak\u0131m ta\u015f\u0131ma ve k\u0131sa devre kontrol\u00fcn\u00fc g\u00f6sterir YG ve AG kablo hesaplar\u0131,<\/p>\n<p>4-)K\u0131sa devre hesaplar\u0131,<\/p>\n<p>5-)Topraklama ve paratoner tesisi hesaplar\u0131,<\/p>\n<p>6-)\u0130\u00e7 ihtiya\u00e7 transformat\u00f6r g\u00fc\u00e7 hesaplar\u0131 (varsa),<\/p>\n<p>7-)Transformat\u00f6r anma g\u00fc\u00e7lerine g\u00f6re kompanzasyon tesisi hesaplar\u0131 (varsa),<\/p>\n<p>8-)Ayd\u0131nlatma ve acil ayd\u0131nlatma hesaplar\u0131 (varsa).<\/p>\n<h3><strong>3.a.c-) Proje Paftalar\u0131;<\/strong><\/h3>\n<p>1-)Panel, evirici ve panolar\u0131n\u00a0yerlerini g\u00f6steren \u00f6l\u00e7ekli yerle\u015fim plan\u0131 (sistem kurulum \u015femas\u0131),<\/p>\n<p>2-)Tek Hat Ba\u011flant\u0131 \u015eemas\u0131<\/p>\n<p>3-)Fotovoltaik dizi (string) bilgileri<\/p>\n<p>4-)Dize elektriksel ayr\u0131nt\u0131lar<\/p>\n<p>5-)Topraklama ve a\u015f\u0131r\u0131 gerilim korumas\u0131<\/p>\n<p>6-)Santral AC Taraf<\/p>\n<p>7-)\u00d6l\u00e7\u00fc, izleme ve haberle\u015fme detay planlar\u0131,<\/p>\n<p>8-)YG ve AG g\u00fc\u00e7 da\u011f\u0131t\u0131m vaziyet planlar\u0131 (varsa),<\/p>\n<p>9-)Ayd\u0131nlatma ve acil ayd\u0131nlatma tesisatlar\u0131 planlar\u0131 (varsa),<\/p>\n<p>10-)YG h\u00fccrelerin genel g\u00f6r\u00fcn\u00fc\u015f ve kesit detaylar\u0131 (varsa )<\/p>\n<p>11-)Yang\u0131n alg\u0131lama ve s\u00f6nd\u00fcrme sistemi planlar\u0131 (varsa).<\/p>\n<h2><strong><span style=\"text-decoration: underline;\">3.b-)\u00a0Arazi Uygulamal\u0131 GES Projesi<\/span><\/strong><\/h2>\n<h3><strong>3.b.a Belgeler ;<\/strong><\/h3>\n<p>1-)\u0130lgili da\u011f\u0131t\u0131m \u015firketinden al\u0131nan \u201cBa\u011flant\u0131 G\u00f6r\u00fc\u015f\u00fc\u201d ve \u201cBa\u011flant\u0131 Anla\u015fmas\u0131na \u00c7a\u011fr\u0131 Mektubu\u201d yaz\u0131lar\u0131,<\/p>\n<p>2-)Kar, buz ve r\u00fczgar y\u00fck\u00fc ile kurulacak olan g\u00fcne\u015f enerjisi teknolojisine ait aksamlar\u0131n statik ve dinamik y\u00fckleri etkisindeki mukavemet hesaplar\u0131n\u0131n uygun bulundu\u011funa dair \u0130l \u00d6zel \u0130daresi veya Belediye taraf\u0131ndan onaylanm\u0131\u015f uygunluk yaz\u0131s\u0131,<\/p>\n<p>3-)Tesisin in\u015fa edilece\u011fi alan\u0131n GES kurmaya uygun oldu\u011funu g\u00f6steren \u0130l \u00d6zel \u0130daresi veya Belediye taraf\u0131ndan onaylanm\u0131\u015f uygunluk yaz\u0131s\u0131,<\/p>\n<p>4-)Sistem Temel Bilgi Formu (EK-A) a) Tesiste kullan\u0131lacak olan g\u00fcne\u015f enerjisi teknolojisine ait her bir ekipman\u0131n (pv mod\u00fcl\u00fc, invert\u00f6r, yans\u0131t\u0131c\u0131 y\u00fczey, odaklay\u0131c\u0131 sistemi, vb.) elektriksel ve fiziksel teknik \u00f6zellikleri<\/p>\n<p>5-)Sistem Tasar\u0131mc\u0131s\u0131 Bilgileri (Sistemi tasarlayan \u015firket bilgisi, irtibat ki\u015fisi ve ileti\u015fim bilgileri (posta adresi, telefon numaras\u0131 ve e-posta adresi)<\/p>\n<p>6-)\u0130lgili mevzuata uygun olarak di\u011fer gerekli belgeler<\/p>\n<h3><strong>3.b.b-) Hesaplar<\/strong><\/h3>\n<p>1-)G\u00fc\u00e7 kayb\u0131, gerilim d\u00fc\u015f\u00fcm\u00fc ve ak\u0131m ta\u015f\u0131ma kontrol\u00fcn\u00fc g\u00f6sterir do\u011fru ak\u0131m (DC) kablo hesaplar\u0131,<\/p>\n<p>2-)Panel se\u00e7im, maksimum ve minimum evirici DC giri\u015f gerilim kontrol\u00fcn\u00fc g\u00f6sterir hesaplar,<\/p>\n<p>3-)Gerilim d\u00fc\u015f\u00fcm\u00fc, ak\u0131m ta\u015f\u0131ma ve k\u0131sa devre kontrol\u00fcn\u00fc g\u00f6sterir YG ve AG (AC) kablo hesaplar\u0131,<\/p>\n<p>4-)K\u0131sa devre hesaplar\u0131,<\/p>\n<p>5-)Topraklama ve paratoner tesisi hesaplar\u0131,<\/p>\n<p>6-)\u0130\u00e7 ihtiya\u00e7 transformat\u00f6r g\u00fc\u00e7 hesaplar\u0131 (varsa),<\/p>\n<p>7-)Transformat\u00f6r anma g\u00fc\u00e7lerine g\u00f6re kompanzasyon tesisi hesaplar\u0131 (varsa),<\/p>\n<p>8-)Ayd\u0131nlatma ve acil ayd\u0131nlatma hesaplar\u0131 (varsa)<\/p>\n<h3><strong>3.b.c-) Proje Paftalar\u0131;<\/strong><\/h3>\n<p>1-)Panel, evirici ve panolar\u0131n\u00a0yerlerini g\u00f6steren \u00f6l\u00e7ekli yerle\u015fim plan\u0131 (sistem kurulum \u015femas\u0131),<\/p>\n<p>2-)Tek Hat Ba\u011flant\u0131 \u015eemas\u0131<\/p>\n<p>3-)Fotovoltaik dizi (string) bilgileri<\/p>\n<p>4-)Dize elektriksel ayr\u0131nt\u0131lar<\/p>\n<p>5-)Topraklama ve a\u015f\u0131r\u0131 gerilim korumas\u0131<\/p>\n<p>6-)Santral AC Taraf<\/p>\n<p>7-)\u00d6l\u00e7\u00fc, izleme ve haberle\u015fme detay planlar\u0131,<\/p>\n<p>8-)YG ve AG g\u00fc\u00e7 da\u011f\u0131t\u0131m vaziyet planlar\u0131 (varsa),<\/p>\n<p>9-)Ayd\u0131nlatma ve acil ayd\u0131nlatma tesisatlar\u0131 planlar\u0131 (varsa),<\/p>\n<p>10-)YG h\u00fccrelerin genel g\u00f6r\u00fcn\u00fc\u015f ve kesit detaylar\u0131 (varsa )<\/p>\n<p>11-)Yang\u0131n alg\u0131lama ve s\u00f6nd\u00fcrme sistemi planlar\u0131 (varsa)<\/p>\n<h3><strong>3.b.d-) Mevcut Planlar\u00a0<\/strong><\/h3>\n<p>&#8211; Varsa mevcut tesise ait elektriksel bilgi, belge ve \u00e7izimler<\/p>\n<h2><strong>4.) Ge\u00e7i\u00e7i kabul-Onay S\u00fcre\u00e7leri<\/strong><\/h2>\n<p>1-)Proje Onay \u0130\u015flemi 180\u00a0g\u00fcn i\u00e7inde tamamland\u0131 m\u0131?<\/p>\n<p>2-)Proje Onay Bedeli Yat\u0131r\u0131lmas\u0131 ve Onay \u0130\u015flemi.<\/p>\n<p>3-)Proje onay\u0131ndan sonra, belgelerle birlikte ba\u015fvurudan sonra otuz g\u00fcn i\u00e7erisinde Ba\u011flant\u0131 ve Sistem Kullan\u0131m Anla\u015fmalar\u0131 imzalan\u0131r.<\/p>\n<p>4-)\u00dcretim tesisinin kabul ve devreye almas\u0131na ge\u00e7i\u015f<\/p>\n<h2><span style=\"text-decoration: underline; color: #000000;\"><strong>Genel Bilgilendirme:<\/strong><\/span><\/h2>\n<p><strong>Elektrik \u00dcretim Miktar\u0131;<\/strong> \u00a01 KW \u2019l\u0131k kurulu g\u00fcc\u00fc olan bir G\u00fcne\u015f Enerji Santralinden y\u0131ll\u0131k 1400-1600 kwh\/y\u0131l elektrik \u00fcretilir.<\/p>\n<p><strong>1 MW \u2019l\u0131k ( 1000 KW ) kurulu g\u00fcc\u00fc<\/strong> olan G\u00fcne\u015f Enerjisi santralinden y\u0131ll\u0131k ortalama \u00fcretim 500 kwh\/ y\u0131l olarak al\u0131nd\u0131\u011f\u0131nda y\u0131ll\u0131k1.500.000 kwh elektrik \u00fcretilir.<\/p>\n<p><strong>YATIRIMIN GER\u0130 \u00d6DEME S\u00dcRES\u0130 ( YIL )<\/strong> \u00a0= TOPLAM MAL\u0130YET \/ YILLIK TOPLAM GEL\u0130R \u00a0TOPLAM MAL\u0130YET EURO ( Yakla\u015f\u0131k ) \u00a0= 1.130.000 \u20ac<\/p>\n<p><strong>TOPLAM YILLIK GEL\u0130R ( Yakla\u015f\u0131k )\u00a0<\/strong>= YILLIK \u00dcRET\u0130M X TE\u015eV\u0130K F\u0130YATI \u00a0TOPLAM YILLIK GEL\u0130R ( Yakla\u015f\u0131k ) = \u00a01.500.000 kwh\/y\u0131l \u00a0X 0.1140 \u20ac \/ kwh<\/p>\n<p><strong>TOPLAM YILLIK GEL\u0130R<\/strong> =171.000 \u20ac \/ y\u0131l \u00a0YATIRIMIN GER\u0130 \u00d6DEME S\u00dcRES\u0130 ( YIL ) \u00a0= 1.130.000 \u20ac \/ 171.000 \u20ac \/ y\u0131l<\/p>\n<p>YATIRIMIN GER\u0130 \u00d6DEME S\u00dcRES\u0130 ( YIL ) \u00a0= \u00a06.6 \u00a0YIL<\/p>\n<p><strong>SANTRAL\u0130N EKONOM\u0130K \u00d6MR\u00dc<\/strong> = 25 YIL\u2019DIR \u00a0SANTRAL \u00a025 YIL\u2019IN SONUNDA DA VER\u0130M\u0130 D\u00dc\u015eER AMA \u00d6M\u00dcR BOYU ELEKTR\u0130K \u00dcRETMEYE DEVAM EDER.<\/p>\n<h2><span style=\"text-decoration: underline; color: #000000;\"><strong> Sonu\u00e7 olarak:<\/strong><\/span><\/h2>\n<p>1 MW \u2019LIK ( 1000 KW ) \u00a0<strong>G\u00fcne\u015f Enerjisi Santrali kurulumu i\u00e7in<\/strong> yakla\u015f\u0131k <strong>1.130.000 \u20ac ( 3.360.000 TL )<\/strong> maliyetiniz olmaktad\u0131r.<\/p>\n<p><strong>Y\u0131ll\u0131k geliriniz de<\/strong> yakla\u015f\u0131k <span style=\"text-decoration: underline;\">171.000 \u20ac\u00a0( 508.460 TL )<\/span> oldu\u011funa g\u00f6re;<\/p>\n<p>Yat\u0131rd\u0131\u011f\u0131n\u0131z paray\u0131 yakla\u015f\u0131k <strong>6.6 y\u0131lda geri al\u0131yorsunuz<\/strong> ve bundan sonraki yakla\u015f\u0131k <strong>20 \u2013 25 y\u0131l \u00a0boyunca<\/strong> 171.000 \u20ac ( 508.460 TL \/y\u0131l \u00a0ya da \u00a0Ayl\u0131k yakla\u015f\u0131k \u00a042.370 TL) \u00a0geliriniz olmaktad\u0131r.<\/p>\n<p><strong>1 MW`l\u0131k<\/strong> bir santral kurmak i\u00e7in yakla\u015f\u0131k <strong>20 D\u00f6n\u00fcm araziye<\/strong> ihtiya\u00e7 vard\u0131r.<\/p>\n<p><span style=\"color: #000000;\"><em>Bu hesaplamalar, yat\u0131r\u0131mc\u0131ya sadece <strong>fikir vermesi a\u00e7\u0131s\u0131ndan<\/strong> <span style=\"text-decoration: underline;\">\u00f6rnek olarak hesaplanan<\/span> yakla\u015f\u0131k rakamlard\u0131r. Projenin detayl\u0131 fizibilitesi haz\u0131rland\u0131\u011f\u0131nda ve kullan\u0131lacak kredi \u015fartlar\u0131 ile elde edilecek gelirin vergilendirilmesi gibi durumlar netle\u015fti\u011finde ger\u00e7ek rakamlar ortaya \u00e7\u0131kacakt\u0131r&#8230;<\/em><\/span><\/p>\n<p><span style=\"color: #993300;\"><strong>Detayl\u0131 Bilgi \u0130\u00e7in<\/strong>\u2014&gt;<\/span>\u00a0\u0130leti\u015fim Formunu Doldurabilir ve(ya)\u00a0<a href=\"mailto:EnerjiYatirimDanismanligi@gmail.com\" target=\"_blank\" rel=\"noopener\">EnerjiYatirimDanismanligi@gmail.com<\/a>\u00a0 adresine mail atabilirsiniz.<\/p>\n<p>Detayl\u0131 <span style=\"text-decoration: underline;\">Bilgi Almak ve Sipari\u015f<\/span> \u0130\u00e7in <span style=\"text-decoration: underline;\">\u0130leti\u015fim Bilgileriniz \u0130le<\/span> Birlikte\u00a0<span style=\"text-decoration: underline;\">Mesaj da G\u00f6nderebilirsiniz<\/span>\u00a0Taraf\u0131n\u0131za En Ge\u00e7 <span style=\"text-decoration: underline;\">24 Saat \u0130\u00e7erisinde<\/span> Geri D\u00f6n\u00fc\u015f Yap\u0131lacakt\u0131r.<\/p>\n<p><strong><span style=\"color: #993300;\">\u0130leti\u015fim Formunu Doldurun, Biz Sizi Arayal\u0131m!<\/span><\/strong><\/p>\n<p><div role=\"form\" class=\"wpcf7\" id=\"wpcf7-f112046-o1\" lang=\"tr-TR\" dir=\"ltr\">\n<div class=\"screen-reader-response\"><p role=\"status\" aria-live=\"polite\" aria-atomic=\"true\"><\/p> <ul><\/ul><\/div>\n<form action=\"\/en\/wp-json\/wp\/v2\/posts\/50089#wpcf7-f112046-o1\" method=\"post\" class=\"wpcf7-form init\" novalidate=\"novalidate\" data-status=\"init\">\n<div style=\"display: none;\">\n<input type=\"hidden\" name=\"_wpcf7\" value=\"112046\" \/>\n<input type=\"hidden\" name=\"_wpcf7_version\" value=\"5.5.6.1\" \/>\n<input type=\"hidden\" name=\"_wpcf7_locale\" value=\"tr_TR\" \/>\n<input type=\"hidden\" name=\"_wpcf7_unit_tag\" value=\"wpcf7-f112046-o1\" \/>\n<input type=\"hidden\" name=\"_wpcf7_container_post\" value=\"0\" \/>\n<input type=\"hidden\" name=\"_wpcf7_posted_data_hash\" value=\"\" \/>\n<\/div>\n<p><label> Ad\u0131n\u0131z (gerekli)<br \/>\n    <span class=\"wpcf7-form-control-wrap your-name\"><input type=\"text\" name=\"your-name\" value=\"\" size=\"40\" class=\"wpcf7-form-control wpcf7-text wpcf7-validates-as-required\" aria-required=\"true\" aria-invalid=\"false\" \/><\/span> <\/label><\/p>\n<p><label> E-posta adresiniz (gerekli)<br \/>\n    <span class=\"wpcf7-form-control-wrap your-email\"><input type=\"email\" name=\"your-email\" value=\"\" size=\"40\" class=\"wpcf7-form-control wpcf7-text wpcf7-email wpcf7-validates-as-required wpcf7-validates-as-email\" aria-required=\"true\" aria-invalid=\"false\" \/><\/span> <\/label><\/p>\n<p><label> Konu<br \/>\n    <span class=\"wpcf7-form-control-wrap your-subject\"><input type=\"text\" name=\"your-subject\" value=\"\" size=\"40\" class=\"wpcf7-form-control wpcf7-text\" aria-invalid=\"false\" \/><\/span> <\/label><\/p>\n<p><label> \u0130letiniz<br \/>\n    <span class=\"wpcf7-form-control-wrap your-message\"><textarea name=\"your-message\" cols=\"40\" rows=\"10\" class=\"wpcf7-form-control wpcf7-textarea\" aria-invalid=\"false\"><\/textarea><\/span> <\/label><\/p>\n<p><input type=\"submit\" value=\"G\u00f6nder\" class=\"wpcf7-form-control has-spinner wpcf7-submit\" \/><\/p>\n<p style=\"display: none !important;\" class=\"akismet-fields-container\" data-prefix=\"_wpcf7_ak_\"><label>&#916;<textarea name=\"_wpcf7_ak_hp_textarea\" cols=\"45\" rows=\"8\" maxlength=\"100\"><\/textarea><\/label><input type=\"hidden\" id=\"ak_js_1\" name=\"_wpcf7_ak_js\" value=\"174\"\/><script>document.getElementById( \"ak_js_1\" ).setAttribute( \"value\", ( new Date() ).getTime() );<\/script><\/p><div class=\"wpcf7-response-output\" aria-hidden=\"true\"><\/div><\/form><\/div><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. 1\u00a0MW \u00c7at\u0131 ve Tarla \u00dcst\u00fc G\u00fcne\u015f Enerjisi Santrali Projesi EDA\u015e\u00a0\u00c7a\u011fr\u0131 Mektubu ve TEDA\u015e Proje Onay\u0131 Hizmeti \u00c7at\u0131 ve Tarla \u00dcst\u00fc G\u00fcne\u015f Enerjisi [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":50090,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[4,18007],"tags":[63,67,1009,2698,165,2326,28378,28379,28382,28380,28381,227,28384,13,28383,2569,21768,23133,22975,4269],"views":23210,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/50089"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=50089"}],"version-history":[{"count":12,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/50089\/revisions"}],"predecessor-version":[{"id":74254,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/50089\/revisions\/74254"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/50090"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=50089"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=50089"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=50089"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}