{"id":50008,"date":"2016-02-05T19:18:13","date_gmt":"2016-02-05T16:18:13","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=50008"},"modified":"2016-02-05T19:18:13","modified_gmt":"2016-02-05T16:18:13","slug":"gurmattan-aydina-jeotermal-enerji-santrali","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/gurmattan-aydina-jeotermal-enerji-santrali\/","title":{"rendered":"(Turkish) G\u00fcrmat\u2019tan Ayd\u0131n\u2019a Jeotermal Enerji Santrali&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/50008\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<p style=\"color: #666666;\"><strong>G\u00fcrmat Elektrik \u00dcretim A.\u015e. taraf\u0131ndan, Ayd\u0131n \u0130li, Germencik \u0130l\u00e7esi, Alang\u00fcll\u00fc Mahallesi s\u0131n\u0131rlar\u0131 i\u00e7erisinde 22,6 MW kapasiteli Efe 6 Jeotermal Enerji Santrali projesinin hayata ge\u00e7irilmesi planlan\u0131yor.<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/02\/gurmattan-aydina-jeotermal-enerji-santrali.jpg\"><img loading=\"lazy\" class=\"alignright  wp-image-50009\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/02\/gurmattan-aydina-jeotermal-enerji-santrali-300x110.jpg\" alt=\"gurmattan-aydina-jeotermal-enerji-santrali\" width=\"300\" height=\"183\" \/><\/a><\/strong><\/p>\n<p style=\"color: #666666;\">315.000.000 TL bedelli proje ilebinary sistem ile y\u0131lda 180.800.000 kW`l\u0131k elektrik \u00fcretilmesi ve 883 parsel \u00fczerinde yer alacak olan \u015falt sahas\u0131ndan 154 kV G\u00fcrmat I Fiderine aktar\u0131lmas\u0131 hedefleniyor.<\/p>\n<p style=\"color: #666666;\">Efe 6 Jeotermal Enerji Santrali projesi ile ilgili olarak 4628 say\u0131l\u0131 Elektrik Piyasas\u0131 Kanunu ve ilgili mevzuat uyar\u0131nca Enerji Piyasas\u0131 D\u00fczenleme Kurumu\u2019ndan 13.12.2012 tarih ve E\u00dc\/4165-16\/2491 lisans no ile 29 y\u0131l s\u00fcreyle \u00fcretim faaliyeti g\u00f6stermek \u00fczere \u201c\u00dcretim Lisans\u0131\u201d al\u0131nm\u0131\u015f durumda.<\/p>\n<p style=\"color: #666666;\">Haberin devam\u0131 i\u00e7in\u00a0<a style=\"color: #fc8d8d;\" href=\"http:\/\/enerjigunlugu.net\/gurmat-aydina-efe-6-jes-kuracak_17118.html#.VrM8NdKLThl\" target=\"_blank\">t\u0131klay\u0131n&gt;&gt;&gt;<\/a><\/p>\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. G\u00fcrmat Elektrik \u00dcretim A.\u015e. taraf\u0131ndan, Ayd\u0131n \u0130li, Germencik \u0130l\u00e7esi, Alang\u00fcll\u00fc Mahallesi s\u0131n\u0131rlar\u0131 i\u00e7erisinde 22,6 MW kapasiteli Efe 6 Jeotermal Enerji Santrali projesinin [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":50009,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,48],"tags":[63,67,1009,2698,165,28350,58,56,10686,23226,23225,6322],"views":2571,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/50008"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=50008"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/50008\/revisions"}],"predecessor-version":[{"id":50010,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/50008\/revisions\/50010"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/50009"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=50008"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=50008"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=50008"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}