{"id":49851,"date":"2016-02-02T00:32:13","date_gmt":"2016-02-01T21:32:13","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=49851"},"modified":"2016-02-02T00:32:13","modified_gmt":"2016-02-01T21:32:13","slug":"18-futbol-sahasi-buyuklugunde-paneller-insa-ediyor","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/18-futbol-sahasi-buyuklugunde-paneller-insa-ediyor\/","title":{"rendered":"(Turkish) 18 Futbol Sahas\u0131 B\u00fcy\u00fckl\u00fc\u011f\u00fcnde Paneller \u0130n\u015fa Ediyor!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/49851\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<p style=\"color: #363636;\"><strong>Japon elektronik devi Kyocera firmas\u0131 taraf\u0131ndan yap\u0131lan paneller 13.7 megawattl\u0131k (MW) bir g\u00fcce sahip olacak. 18 futbol sahas\u0131 b\u00fcy\u00fckl\u00fc\u011f\u00fcnde olacak dev tesis, toplam 4.790 evin enerji ihtiyac\u0131n\u0131 ka<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/02\/18-futbol-sahasi-buyuklugunde-paneller-insa-ediyor.jpg\"><img loading=\"lazy\" class=\"alignright  wp-image-49852\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/02\/18-futbol-sahasi-buyuklugunde-paneller-insa-ediyor.jpg\" alt=\"18-futbol-sahasi-buyuklugunde-paneller-insa-ediyor\" width=\"300\" height=\"180\" \/><\/a>r\u015f\u0131layacak.<\/strong><\/p>\n<p style=\"color: #363636;\">Kyocera firmas\u0131 yetkilileri yapt\u0131klar\u0131 a\u00e7\u0131klamada, y\u00fczen g\u00fcne\u015f sistemlerinin kullan\u0131m\u0131 alan\u0131ndaki bilinen uzman firma Ciel et Terre ile beraber \u00e7al\u0131\u015ft\u0131klar\u0131n\u0131 belirtti. Panellerin kurulaca\u011f\u0131 platformu metalsiz, tamam\u0131yla geri d\u00f6n\u00fc\u015ft\u00fcr\u00fclebilir malzemelerden yap\u0131laca\u011f\u0131n\u0131 belirten firma yetkilileri, y\u00fczen g\u00fcne\u015f sistemlerinin suyun kalitesine olumsuz y\u00f6nde herhangi bir etkisinin olmayaca\u011f\u0131n\u0131 s\u00f6yledi.<\/p>\n<p style=\"color: #363636;\">Japonya y\u00fczen g\u00fcne\u015f enerjisi tesisleriyle \u00fclkede bolca bulunan su y\u00fczeylerini verimli bir \u015fekilde kullanmay\u0131 planl\u0131yor. Yap\u0131m\u0131na ilk olarak 2014 y\u0131l\u0131n\u0131n Ekim ay\u0131nda ba\u015flanan sistem, Tokyo\u2019nun g\u00fcney do\u011fu b\u00f6lgesinde bulunan Yamakura Dam rezervlerinde yer alacak ve 2018\u2032in Mart ay\u0131nda faaliyete ge\u00e7ecek.<\/p>\n<p style=\"color: #363636;\">Kaynak: Cihan<\/p>\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Japon elektronik devi Kyocera firmas\u0131 taraf\u0131ndan yap\u0131lan paneller 13.7 megawattl\u0131k (MW) bir g\u00fcce sahip olacak. 18 futbol sahas\u0131 b\u00fcy\u00fckl\u00fc\u011f\u00fcnde olacak dev tesis, [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":49852,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49],"tags":[63,67,1009,93,2698,165,227,13,23133,22975,4269,24777,20591,1547,1384],"views":1040,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/49851"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=49851"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/49851\/revisions"}],"predecessor-version":[{"id":49853,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/49851\/revisions\/49853"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/49852"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=49851"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=49851"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=49851"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}