{"id":49589,"date":"2016-01-26T13:58:21","date_gmt":"2016-01-26T10:58:21","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=49589"},"modified":"2016-01-26T13:58:21","modified_gmt":"2016-01-26T10:58:21","slug":"tanapin-eskisehir-yunanistan-siniri-boru-hattini-limak-yapacak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/tanapin-eskisehir-yunanistan-siniri-boru-hattini-limak-yapacak\/","title":{"rendered":"(Turkish) TANAP\u2019\u0131n Eski\u015fehir-Yunanistan S\u0131n\u0131r\u0131 Boru Hatt\u0131n\u0131 Limak Yapacak&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/49589\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<p style=\"color: #0a0a0a;\"><strong>Trans Anadolu Do\u011falgaz Boru Hatt\u0131 Projesi (TANAP) boru hatt\u0131 in\u015faat\u0131n\u0131n Eski\u015fehir\u2019den Yunanistan s\u0131n\u0131r\u0131na kadar olan 459 kilometrelik b\u00f6l\u00fcm\u00fcn\u00fc, Punj Lloyd-Limak i\u015f ortakl\u0131\u011f\u0131 yapacak.<\/strong><span id=\"more-75690\"><\/span><\/p>\n<p style=\"color: #0a0a0a;\">TANAP Do\u011falgaz \u0130letim A\u015e\u2019den<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/01\/tanapin-eskisehir-yunanistan-siniri-boru-hattini-limak-yapacak.jpg\"><img loading=\"lazy\" class=\"alignleft size-medium wp-image-49590\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/01\/tanapin-eskisehir-yunanistan-siniri-boru-hattini-limak-yapacak-300x165.jpg\" alt=\"\" width=\"300\" height=\"165\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/01\/tanapin-eskisehir-yunanistan-siniri-boru-hattini-limak-yapacak-300x165.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/01\/tanapin-eskisehir-yunanistan-siniri-boru-hattini-limak-yapacak-500x276.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/01\/tanapin-eskisehir-yunanistan-siniri-boru-hattini-limak-yapacak-80x44.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/01\/tanapin-eskisehir-yunanistan-siniri-boru-hattini-limak-yapacak.jpg 696w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a> yap\u0131lan yaz\u0131l\u0131 a\u00e7\u0131klamada, 48 in\u00e7 kara kesimi Lot-4 boru hatt\u0131 in\u015faat ihalesine ili\u015fkin ba\u015fvurular\u0131n de\u011ferlendirmesi sonucunda Punj Lloyd-Limak i\u015f ortakl\u0131\u011f\u0131 ile s\u00f6zle\u015fme imzaland\u0131\u011f\u0131 bildirildi.<\/p>\n<p style=\"color: #0a0a0a;\">A\u00e7\u0131klamada, \u201cEski\u015fehir\u2019den ba\u015flayarak Bilecik, K\u00fctahya, Bursa, Bal\u0131kesir, \u00c7anakkale, Tekirda\u011f ve Edirne illerinden ge\u00e7ip T\u00fcrkiye-Yunanistan s\u0131n\u0131r\u0131nda Edirne\u2019nin \u0130psala \u0130l\u00e7esi\u2019nde son bulacak olan 48 in\u00e7 \u00e7ap\u0131ndaki 459 kilometrelik k\u0131sm\u0131n\u0131n in\u015faat\u0131 i\u00e7in \u00f6n yeterlik alm\u0131\u015f yerli ve yabanc\u0131 11 firman\u0131n 8 Haziran 2015 tarihinde davet edilmesiyle ba\u015flayan ihale s\u00fcrecinin sonucunda Punj Lloyd-Limak \u0130\u015f Ortakl\u0131\u011f\u0131 ile s\u00f6zle\u015fme imzaland\u0131\u201d ifadesi kullan\u0131ld\u0131.<\/p>\n<p style=\"color: #0a0a0a;\">Kaynak: Enerji Enstit\u00fcs\u00fc<\/p>\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Trans Anadolu Do\u011falgaz Boru Hatt\u0131 Projesi (TANAP) boru hatt\u0131 in\u015faat\u0131n\u0131n Eski\u015fehir\u2019den Yunanistan s\u0131n\u0131r\u0131na kadar olan 459 kilometrelik b\u00f6l\u00fcm\u00fcn\u00fc, Punj Lloyd-Limak i\u015f ortakl\u0131\u011f\u0131 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":49590,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[46,53],"tags":[7074,92,226,19761,2092,2677,63,67,1009,2698,165,28152,2297,20452,7850],"views":1255,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/49589"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=49589"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/49589\/revisions"}],"predecessor-version":[{"id":49591,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/49589\/revisions\/49591"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/49590"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=49589"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=49589"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=49589"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}