{"id":49570,"date":"2016-01-25T22:21:39","date_gmt":"2016-01-25T19:21:39","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=49570"},"modified":"2016-01-25T22:22:06","modified_gmt":"2016-01-25T19:22:06","slug":"rumlar-israil-ve-yunanistana-denizden-elektrik-hattiyla-baglanacak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/rumlar-israil-ve-yunanistana-denizden-elektrik-hattiyla-baglanacak\/","title":{"rendered":"(Turkish) Rumlar \u0130srail ve Yunanistan\u2019a Deniz Elektrik Hatt\u0131yla Ba\u011flanacak!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/49570\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<p style=\"color: #363636;\"><strong>T\u00fcrkiye\u2019den denizalt\u0131ndan su borular\u0131 ile ba\u011flanan KKTC\u2019nin ard\u0131ndan \u015fimdi de Rumlar, \u0130srail, Girit ve Yunanistan\u2019a deniz alt\u0131ndan elektrik kablosu ile d\u00f6\u015fenecek borularla ba\u011flanmaya haz\u0131rlan\u0131yor.<\/strong><\/p>\n<p style=\"color: #363636;\">\u0130srail, G\u00fcney K\u0131br\u0131s, Girit ve Yun<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/01\/rumlar-israil-ve-yunanistana-denizden-elektrik-hattiyla-baglanacak.jpg\"><img loading=\"lazy\" class=\"alignleft  wp-image-49571\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/01\/rumlar-israil-ve-yunanistana-denizden-elektrik-hattiyla-baglanacak.jpg\" alt=\"rumlar-israil-ve-yunanistana-denizden-elektrik-hattiyla-baglanacak\" width=\"300\" height=\"209\" \/><\/a>anistan aras\u0131nda deniz alt\u0131ndan elektrik kablosu d\u00f6\u015fenecek \u201cEuroasian Interconnector Projesi\u201dne y\u00f6nelik \u00e7al\u0131\u015fmalar\u0131n ba\u015flayaca\u011f\u0131 bildirildi.<\/p>\n<p style=\"color: #363636;\">Odin Finder isimli \u0130talyan ara\u015ft\u0131rma gemisinin \u00f6n\u00fcm\u00fczdeki iki ay i\u00e7erisinde, g\u00fczerg\u00e2h boyunca deniz taban\u0131yla ilgili verileri kayda ge\u00e7irmek ve derinlik \u00f6l\u00e7\u00fcmleri yapmak i\u00e7in Limasol Liman\u0131\u2019ndan yola \u00e7\u0131kaca\u011f\u0131 kaydedildi.<\/p>\n<p style=\"color: #363636;\">Rum bas\u0131n\u0131, hedefin, deniz alt\u0131 kablosunun nihai rotas\u0131n\u0131n, deniz taban\u0131n\u0131n olu\u015fumuna g\u00f6re \u00e7izilmesi oldu\u011funu yazd\u0131. Rum Fileleftheros gazetesi, bahse konu elektrik kablosunun ge\u00e7mesi planlanan b\u00f6lgede, hali haz\u0131rda deniz alt\u0131na d\u00f6\u015fenip, \u00e7al\u0131\u015fmakta olan yakla\u015f\u0131k 35 telekom\u00fcnikasyon kablosu bulundu\u011funu kaydetti.<\/p>\n<p style=\"color: #363636;\"><strong>B\u0130R METRE KABLO 60 K\u0130LOGRAM A\u011eIRLI\u011eINDA<\/strong><\/p>\n<p style=\"color: #363636;\">Buna e\u015f zamanl\u0131 olarak, gerekli \u00e7evre \u00e7al\u0131\u015fmas\u0131 ile teferruatl\u0131 teknik incelemenin de ba\u015flayaca\u011f\u0131n\u0131 yazan gazete, kablonun baz\u0131 noktalarda \u00e7ok derin yerlerden ge\u00e7ece\u011fini aktard\u0131. Kablonun, bu ko\u015fullara cevap vermek \u00fczere tasarland\u0131\u011f\u0131n\u0131 kaydeden gazete, kablonun her metresinin yakla\u015f\u0131k 60 kilo olaca\u011f\u0131n\u0131 ve bunun da toplam a\u011f\u0131rl\u0131\u011f\u0131 90 bin tonu bulacak bir kablo anlam\u0131na geldi\u011fini aktard\u0131.<\/p>\n<p style=\"color: #363636;\">Kablonun uzunlu\u011funun yakla\u015f\u0131k bin 518 kilometre olaca\u011f\u0131n\u0131n hesapland\u0131\u011f\u0131n\u0131 yazan gazete, \u0130srail ile G\u00fcney K\u0131br\u0131s\u2019\u0131 ba\u011flayacak kablonun uzunlu\u011funun 329 kilometre olaca\u011f\u0131n\u0131 belirtti.<\/p>\n<p style=\"color: #363636;\"><strong>2019\u2032DA TAMAMLANMASI BEKLEN\u0130YOR<\/strong><\/p>\n<p style=\"color: #363636;\">Kablonun d\u00f6\u015fenmesine 2017\u2019de ba\u015flan\u0131p, 2019\u2019da tamamlanmas\u0131n\u0131n beklendi\u011fini ifade eden gazete, ikinci a\u015faman\u0131n ise 2020\u2019de Girit ile Yunanistan\u2019daki Attika b\u00f6lgesi ve Yunanistan anakaras\u0131n\u0131n ba\u011flanmas\u0131 olaca\u011f\u0131n\u0131 yazd\u0131. Gazete, \u00fc\u00e7\u00fcnc\u00fc ve son a\u015faman\u0131n ise, Girit ile G\u00fcney K\u0131br\u0131s aras\u0131ndaki ba\u011flant\u0131n\u0131n 2022\u2019ye kadar yap\u0131lmas\u0131 oldu\u011funu ifade etti.<\/p>\n<p style=\"color: #363636;\"><strong>50 YIL FAAL\u0130YET G\u00d6STERECEK<\/strong><\/p>\n<p style=\"color: #363636;\">Kablonun d\u00f6\u015fenmesinden itibaren, 50 y\u0131l faaliyet g\u00f6sterebilece\u011fini kaydeden gazete, projenin birinci ve ikinci a\u015famas\u0131n\u0131n yakla\u015f\u0131k 1,5 milyar Euro\u2019ya mal olmas\u0131n\u0131n beklendi\u011fini ve bunun tamamen \u201cEuroasian Interconnector\u201d organizasyonu taraf\u0131ndan kar\u015f\u0131lanaca\u011f\u0131n\u0131 kaydetti. Projeyle ilgili ara\u015ft\u0131rmalar\u0131n AB taraf\u0131ndan finanse edilmesinin onayland\u0131\u011f\u0131n\u0131 da an\u0131msatan gazete, bu projenin, Avrupa Komisyonu\u2019nun b\u00fcy\u00fck \u00f6nceli\u011fe sahip s\u0131n\u0131r \u00f6tesi projesi olarak, Br\u00fcksel\u2019in enerji politikas\u0131na dahil oldu\u011funa i\u015faret etti. Gazete, deniz alt\u0131na d\u00f6\u015fenecek kablonun, 2 bin megavat elektrik enerjisi ta\u015f\u0131ma kapasitesine sahip olaca\u011f\u0131n\u0131 da ekledi.<\/p>\n<p style=\"color: #363636;\"><strong>\u201cENERJ\u0130 HAR\u0130TASI DE\u011e\u0130\u015e\u0130YOR\u201d<\/strong><\/p>\n<p style=\"color: #363636;\">\u201cEuroasian Interconnector Projesi\u201dnin, teferruatl\u0131 teknik ara\u015ft\u0131rmalardan ibaret olan, sondan bir \u00f6nceki ve esasl\u0131 a\u015famaya girmekte oldu\u011funu da kaydeden gazete, projenin hayata ge\u00e7mesinin, G\u00fcney K\u0131br\u0131s, \u0130srail, Yunanistan ve ikinci a\u015famada da b\u00fct\u00fcn Avrupa i\u00e7in bir\u00e7ok ve \u00f6nemli avantaja sahip oldu\u011funu kaydetti. Projenin, G\u00fcney K\u0131br\u0131s i\u00e7in jeopolitik, ayn\u0131 zamanda \u00e7evresel ve ekonomik avantajlara sahip oldu\u011funu yazan gazete, projenin, daha ucuz elektri\u011fe ve elektrikte daha b\u00fcy\u00fck rekabete yol a\u00e7aca\u011f\u0131ndan ekonomik avantajlara sahip olaca\u011f\u0131n\u0131 dile getirdi.<\/p>\n<p style=\"color: #363636;\">Gazete, projenin G\u00fcney K\u0131br\u0131s\u2019ta faaliyete ge\u00e7mesiyle birlikte, yenilenebilir enerji kaynaklar\u0131ndan kesintisiz \u00fcretim yap\u0131lmas\u0131n\u0131n geli\u015ftirilebilece\u011fini, \u00e7\u00fcnk\u00fc bunun elektrik sistemi i\u00e7in bir istikrars\u0131zl\u0131k unsuru te\u015fkil etmeyece\u011fini s\u00f6zlerine ekledi.<\/p>\n<p style=\"color: #363636;\">Kaynak: Cihan<\/p>\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. T\u00fcrkiye\u2019den denizalt\u0131ndan su borular\u0131 ile ba\u011flanan KKTC\u2019nin ard\u0131ndan \u015fimdi de Rumlar, \u0130srail, Girit ve Yunanistan\u2019a deniz alt\u0131ndan elektrik kablosu ile d\u00f6\u015fenecek borularla [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":49571,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53],"tags":[68,61,19638,12631,28141,2873,63,67,1009,165,7811,254,7037,28142,846,255],"views":1156,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/49570"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=49570"}],"version-history":[{"count":2,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/49570\/revisions"}],"predecessor-version":[{"id":49573,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/49570\/revisions\/49573"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/49571"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=49570"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=49570"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=49570"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}