{"id":49518,"date":"2016-01-24T17:32:31","date_gmt":"2016-01-24T14:32:31","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=49518"},"modified":"2016-01-24T17:32:31","modified_gmt":"2016-01-24T14:32:31","slug":"london-array-res-2015te-25-twh-elektrik-uretti","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/london-array-res-2015te-25-twh-elektrik-uretti\/","title":{"rendered":"(Turkish) London Array RES 2015\u2019te 2,5 TWh Elektrik \u00dcretti&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/49518\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>London Array r\u00fczgar enerjisi santralinin 2015 y\u0131l\u0131nda 2,5 Teravat-saat elektrik \u00fcretimi sa\u011flad\u0131\u011f\u0131 bildirildi. London Array Limited \u015firketi taraf\u0131ndan yap\u0131lan a\u00e7\u0131klamaya g\u00f6re santralde en fazla \u00fcretim rakam\u0131na ise Aral\u0131k ay\u0131nda 369 Gigavat-saat (GWh) ile ula\u015f\u0131ld\u0131.<\/strong><\/p>\n<p>Bu d\u00f6nemde santral y\u00fczde 79\u2019luk kapasite fakt\u00f6r\u00fc ile \u00e7al\u0131\u015f\u0131rken, ortalama r\u00fczgar h\u0131z\u0131 ise saniyede 11,9<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/01\/london-array-res-2015te-25-twh-elektrik-uretti.jpg\"><img loading=\"lazy\" class=\"alignright size-medium wp-image-49519\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/01\/london-array-res-2015te-25-twh-elektrik-uretti-300x163.jpg\" alt=\"london-array-res-2015te-25-twh-elektrik-uretti\" width=\"300\" height=\"163\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/01\/london-array-res-2015te-25-twh-elektrik-uretti-300x163.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/01\/london-array-res-2015te-25-twh-elektrik-uretti-80x43.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/01\/london-array-res-2015te-25-twh-elektrik-uretti.jpg 460w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a> metre oldu.<\/p>\n<p>Londra k\u0131y\u0131lar\u0131na 20 km uzakl\u0131kta olan ve 100 kilometre-karelik alan\u0131 kaplayan santral toplam g\u00fc\u00e7leri 630 MW g\u00fcc\u00fcnde olan 175 adet Siemens SWT 3.6-120 r\u00fczgar t\u00fcrbininden olu\u015fuyor.<\/p>\n<p>8 Nisan 2013 tarihinde tam kapasite ile elektrik \u00fcretimine ba\u015flayan santralde 2014 y\u0131l\u0131nda ise 2,2 TWh&#8217;lik elektrik \u00fcretimine ula\u015fm\u0131\u015ft\u0131.<\/p>\n<p>A\u00e7\u0131klamada de\u011ferlendirmesi yer alan projenin y\u00f6neticisi Jonathan Duffy bu y\u00fcksek \u00fcretimde k\u0131\u015f aylar\u0131nda ortalaman\u0131n \u00fczerinde ger\u00e7ekle\u015fen r\u00fczgarlar\u0131n etkili oldu\u011funu kaydederken, santralin operasyon ve bak\u0131m\u0131 i\u00e7in ger\u00e7ekle\u015ftirilen \u00e7al\u0131\u015fmalar\u0131n da \u00f6nemine vurgu yapt\u0131.<\/p>\n<p>Duffy 2015\u2019te projenin \u00fcstlenicileri olan Dong Energy ve Siemens ile birlikte operasyonel verimlili\u011fe ve teknisyenlerin k\u0131y\u0131dan uzakta \u00e7al\u0131\u015fabilecekleri zaman\u0131 art\u0131rmaya odakland\u0131klar\u0131n\u0131 kaydetti.<\/p>\n<p>Bununla birlikte ba\u015flang\u0131\u00e7ta iki faz halinde 1.000 MW olarak tasarlanan projenin 370 MW\u2019l\u0131k ikinci faz\u0131n\u0131n ise b\u00f6lgedeki g\u00f6\u00e7men k\u0131z\u0131l gerdanl\u0131 dalg\u0131\u00e7 ku\u015flar\u0131n\u0131n ya\u015fam\u0131 \u00fczerinde olumsuz etki yarataca\u011f\u0131n\u0131n tespit edilmesi gerek\u00e7esi ile firma taraf\u0131ndan iptal edilmi\u015fti.<\/p>\n<p>T\u00fcrkiye\u2019de ise 2015 y\u0131l\u0131nda r\u00fczgar enerjisinden 882,90 MW\u2019l\u0131k b\u00f6l\u00fcm\u00fc y\u0131l i\u00e7inde devreye giren toplamda 4.511 MW\u2019l\u0131k g\u00fc\u00e7 ile 11,5 TWh elektrik \u00fcretimi sa\u011fland\u0131.<\/p>\n<p>D\u00f6rt ortakl\u0131 bir konsorsiyum olan London Array \u015firketinde Alman enerji \u015firketi E.ON y\u00fczde 30, Danimarkal\u0131 r\u00fczgar enerjisi \u015firketi Dong Energy y\u00fczde 25, Abu Dabili Masdar y\u00fczde 20 ve Kanadal\u0131 yat\u0131r\u0131m fonu Caisse de d\u00e9p\u00f4t et placement du Qu\u00e9bec y\u00fczde 25\u2019lik pay sahibi.<\/p>\n<p>Kaynak: <a href=\"http:\/\/yesilekonomi.com\/yenilenebilir-enerji\/london-array-res-2015te-25-twh-elektrik-uretti\" target=\"_blank\" rel=\"nofollow\">Ye\u015fil Ekonomi<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.London Array r\u00fczgar enerjisi santralinin 2015 y\u0131l\u0131nda 2,5 Teravat-saat elektrik \u00fcretimi sa\u011flad\u0131\u011f\u0131 bildirildi. London Array Limited \u015firketi taraf\u0131ndan yap\u0131lan a\u00e7\u0131klamaya g\u00f6re santralde en [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":49519,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,50],"tags":[63,67,1009,2698,165,474,22653,69,16,22631,23318,22615,4784],"views":750,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/49518"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=49518"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/49518\/revisions"}],"predecessor-version":[{"id":49520,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/49518\/revisions\/49520"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/49519"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=49518"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=49518"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=49518"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}