{"id":49485,"date":"2016-01-24T16:41:53","date_gmt":"2016-01-24T13:41:53","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=49485"},"modified":"2016-01-24T16:41:53","modified_gmt":"2016-01-24T13:41:53","slug":"gtm-2016da-64-bin-mwlik-ges-kurulacak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/gtm-2016da-64-bin-mwlik-ges-kurulacak\/","title":{"rendered":"(Turkish) GTM: 2016&#8217;da 64 Bin MW&#8217;lik GES Kurulacak!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/49485\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>2015 y\u0131l\u0131nda d\u00fcnya \u00e7ap\u0131nda 59 bin MW`lik yeni g\u00fcne\u015f enerji santrali (GES) kurulumu yap\u0131ld\u0131, b\u00f6ylece toplam g\u00fc\u00e7 256 bin MW`yi a\u015ft\u0131. 2016`da 64 bin MW`lik yeni kurulum bekleniyor.<\/strong><\/p>\n<p>GTM Ara\u015ft\u0131rma \u015eirketi,<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/01\/gtm-2016da-64-bin-mwlik-ges-kurulacak.jpg\"><img loading=\"lazy\" class=\"alignleft size-medium wp-image-49486\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/01\/gtm-2016da-64-bin-mwlik-ges-kurulacak-300x189.jpg\" alt=\"gtm-2016da-64-bin-mwlik-ges-kurulacak\" width=\"300\" height=\"189\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/01\/gtm-2016da-64-bin-mwlik-ges-kurulacak-300x189.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/01\/gtm-2016da-64-bin-mwlik-ges-kurulacak-500x315.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/01\/gtm-2016da-64-bin-mwlik-ges-kurulacak-80x50.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/01\/gtm-2016da-64-bin-mwlik-ges-kurulacak.jpg 616w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a> 2015 y\u0131l\u0131nda ger\u00e7ekle\u015ftirilen ve 2016 y\u0131l\u0131nda beklenen toplam g\u00fcne\u015f enerjisi kurulumlar\u0131na ili\u015fkin bir rapor yay\u0131nlad\u0131. Rapordaki ge\u00e7ici verilere g\u00f6re ge\u00e7ti\u011fimiz y\u0131l toplam yeni GES kurulum rakam\u0131 bir \u00f6nceki y\u0131la g\u00f6re y\u00fczde 34`l\u00fck art\u0131\u015fla, 59 bin MW`ye ula\u015ft\u0131. B\u00f6ylece 2015 sonu itibariyle t\u00fcm d\u00fcnyadaki toplam fotovoltaik kurulu g\u00fc\u00e7 rakam\u0131n\u0131n 256 bin MW`ye ula\u015ft\u0131\u011f\u0131 hesapland\u0131.<\/p>\n<p><strong>BU YIL 64 B\u0130N MW KURULACAK<\/strong><\/p>\n<p>\u00d6te yandan, 2016 y\u0131l\u0131nda d\u00fcnya \u00e7ap\u0131nda solarda 64 bin MW`lik ilave g\u00fcne\u015f santrali kurulumu bekleniyor. B\u00f6ylece k\u00fcresel GES kurulu g\u00fcc\u00fc 321 bin MW`ye ula\u015facak. 2020 y\u0131l\u0131 i\u00e7in tahminler 800 bin MW`lik toplam kurulu g\u00fcce ula\u015f\u0131laca\u011f\u0131n\u0131 ortaya koyuyor.<\/p>\n<p><strong>PAR\u0130S Z\u0130RVES\u0130`N\u0130N ETK\u0130LER\u0130<\/strong><\/p>\n<p>K\u00fcresel GES kurulu g\u00fcc\u00fcndeki art\u0131\u015fta Latin Amerika ve Asya \u00fclkelerinin b\u00fcy\u00fck rol oynayaca\u011f\u0131 ifade ediliyor. Ayr\u0131ca Hindistan Multi-Gigawatt projeleri ile k\u00fcrsel pazardaki konumunu iyice sa\u011flamla\u015ft\u0131racak. GTM Analisti Mohit Anand\u2019a g\u00f6re Paris`teki iklim zirvesinden \u00e7\u0131kan anla\u015fma\u0131n da etkisiyle GES kurulumlar\u0131 h\u0131zlan\u0131yor. Bir\u00e7ok \u00fclke, Paris \u0130klim Anla\u015fmas\u0131`nda alt\u0131na imza koydu\u011fu y\u00fck\u00fcml\u00fcklerini yerine getirmek i\u00e7in yenilenebilir enerjiye odaklanacak. Burada g\u00fcne\u015fe dayal\u0131 yat\u0131r\u0131mlar uygun fiyatl\u0131 ve h\u0131zl\u0131 geli\u015febilecek bir alan olarak \u00f6ne \u00e7\u0131k\u0131yor.<\/p>\n<p><strong>TE\u015eV\u0130KLERE HALA BA\u011eIMLI<\/strong><\/p>\n<p>GTM Ara\u015ft\u0131rma G\u00fcne\u015f Enerjisi Analisti Mohit Anand`a g\u00f6re 2015 y\u0131l\u0131n\u0131n d\u00f6rd\u00fcnc\u00fc \u00e7eyre\u011findeki veriler, GES yat\u0131r\u0131mlar\u0131n\u0131n devlet te\u015fviklerine ne kadar ba\u011f\u0131ml\u0131 oldu\u011funu g\u00f6sterdi. Anand &#8220;\u00d6rne\u011fin ABD nin Aral\u0131k ay\u0131nda a\u00e7\u0131klad\u0131\u011f\u0131 GES lerdeki vergi indirimlerinin uzat\u0131lmas\u0131&#8230; Bu olay H\u00fck\u00fcmetlerin destekleri GES piyasalar\u0131na nas\u0131l bir doping etkisi yapt\u0131\u011f\u0131n\u0131 g\u00f6sterdi&#8221; dedi.<\/p>\n<p>Vergi indirimlerinin uzat\u0131lmas\u0131yla ABD`nin k\u00fcresel GES pazar\u0131ndaki mevcut y\u00fczde 10\u2019luk pay\u0131n\u0131 2020 y\u0131l\u0131na kadar y\u00fczde 20\u2019e \u00e7\u0131karmas\u0131 bekleniyor. \u00d6n\u00fcm\u00fczdeki y\u0131llarda Japonya, \u0130ngiltere ve \u00c7in`de solar yat\u0131r\u0131mlar\u0131na y\u00f6nelik te\u015fviklerin d\u00fc\u015fece\u011fi tahmin ediliyor. Analistlere g\u00f6re bu y\u0131l \u00c7in ve ABD solar yat\u0131r\u0131mlar\u0131nda lider \u00fclkeler olmay\u0131 s\u00fcrd\u00fcrecek.<\/p>\n<p>Kaynak: <a href=\"http:\/\/enerjigunlugu.net\/gtm-2016da-64-bin-mwlik-ges-kurulacak_16976.html#.VqTUN9SLRdh\" target=\"_blank\" rel=\"nofollow\">Enerji G\u00fcnl\u00fc\u011f\u00fc<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.2015 y\u0131l\u0131nda d\u00fcnya \u00e7ap\u0131nda 59 bin MW`lik yeni g\u00fcne\u015f enerji santrali (GES) kurulumu yap\u0131ld\u0131, b\u00f6ylece toplam g\u00fc\u00e7 256 bin MW`yi a\u015ft\u0131. 2016`da 64 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":49486,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49],"tags":[1198,63,67,1009,2698,165,2326,21886,13346,227,13,23133,22975,2401,26059,4269,4034,28121,803],"views":910,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/49485"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=49485"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/49485\/revisions"}],"predecessor-version":[{"id":49487,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/49485\/revisions\/49487"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/49486"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=49485"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=49485"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=49485"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}