{"id":49429,"date":"2016-01-22T19:54:51","date_gmt":"2016-01-22T16:54:51","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=49429"},"modified":"2016-01-22T19:54:51","modified_gmt":"2016-01-22T16:54:51","slug":"hindistanda-gunes-komurden-ucuz","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/hindistanda-gunes-komurden-ucuz\/","title":{"rendered":"(Turkish) Hindistan&#8217;da G\u00fcne\u015f K\u00f6m\u00fcrden Ucuz!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/49429\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Fortum Energy`nin Hindistan`da kurulacak 700 MW`l\u0131k g\u00fcne\u015f enerjisi santrali i\u00e7in verdi\u011fi \u015fimdiye kadarki en d\u00fc\u015f\u00fck teklif (4.34 Rupi) ile g\u00fcne\u015f enerjisi k\u00f6m\u00fcrden daha ucuz hale geldi.<\/strong><\/p>\n<p>Hindistan Enerji Bakan\u0131 Piyush Goyal twitterdan payla\u015ft\u0131\u011f\u0131 twitte g\u00fcne\u015f enerjisinin k\u00f6m\u00fcrden daha ucuz oldu\u011funu s\u00f6yledi. Hindistan Racastan Eyaleti`nde ya<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/01\/hindistanda-gunes-komurden-ucuz.jpg\"><img loading=\"lazy\" class=\"alignleft size-medium wp-image-49430\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/01\/hindistanda-gunes-komurden-ucuz-300x168.jpg\" alt=\"hindistanda-gunes-komurden-ucuz\" width=\"300\" height=\"168\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/01\/hindistanda-gunes-komurden-ucuz-300x168.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/01\/hindistanda-gunes-komurden-ucuz-80x44.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/01\/hindistanda-gunes-komurden-ucuz.jpg 448w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>p\u0131lmas\u0131 planlanan 420 MW kapasiteli g\u00fcne\u015f enerjisi santrali kurulmas\u0131 amac\u0131yla d\u00fczenlenen ihaleye at\u0131fta bulunan Goyal, s\u00f6zkonusu santralin saha, iletim vb masraflar\u0131 da dahil olmak \u00fczere k\u00f6m\u00fcrden daha ucuza malolaca\u011f\u0131n\u0131 ifade etti.<\/p>\n<p>\u0130hale i\u00e7in Finlandiyal\u0131 Fortum Energy, 700 MW`l\u0131k GES i\u00e7in en d\u00fc\u015f\u00fck fiyat\u0131 vererek her kilovat saat i\u00e7in 4.34 Rupi (0.06 USD\/kWh) fiyat verdi. Bu fiyat \u015fimdiye kadar Hindistan`\u0131n ald\u0131\u011f\u0131 en d\u00fc\u015f\u00fck teklif.<\/p>\n<p>Halihaz\u0131rda 5 GW`a yak\u0131n g\u00fcne\u015f kurulum kapasitesine sahip Hindistan 2022 y\u0131l\u0131na kadar 100 GW g\u00fcne\u015f kurulumunu hedefliyor.<\/p>\n<p>Kaynak: <a href=\"http:\/\/enerjigunlugu.net\/hindistanda-gunes-komurden-ucuz_16968.html\" target=\"_blank\" rel=\"nofollow\">Enerji G\u00fcnl\u00fc\u011f\u00fc<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Fortum Energy`nin Hindistan`da kurulacak 700 MW`l\u0131k g\u00fcne\u015f enerjisi santrali i\u00e7in verdi\u011fi \u015fimdiye kadarki en d\u00fc\u015f\u00fck teklif (4.34 Rupi) ile g\u00fcne\u015f enerjisi k\u00f6m\u00fcrden daha [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":49430,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49,24649],"tags":[63,67,1009,2698,165,28104,227,13,23133,22975,4269,4034,2054,1675,27561,3154],"views":1173,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/49429"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=49429"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/49429\/revisions"}],"predecessor-version":[{"id":49431,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/49429\/revisions\/49431"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/49430"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=49429"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=49429"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=49429"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}