{"id":49377,"date":"2016-01-21T14:24:58","date_gmt":"2016-01-21T11:24:58","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=49377"},"modified":"2016-01-21T14:25:50","modified_gmt":"2016-01-21T11:25:50","slug":"enerjisadan-musa-gunes-enerjisi-santrali","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/enerjisadan-musa-gunes-enerjisi-santrali\/","title":{"rendered":"(Turkish) Enerjisa\u2019dan Mu\u015f\u2019a G\u00fcne\u015f Enerjisi Santrali!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/49377\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<p style=\"color: #666666;\"><span style=\"font-weight: bold; color: #222222;\">Enerjisa, Mu\u015f ilinde kurulu g\u00fcc\u00fc 9 MW olan Alparslan G\u00fcne\u015f Enerjisi Santrali kuracak.<\/span><\/p>\n<p style=\"color: #666666;\">T\u00fcrkiye\u2019nin Karadeniz ha<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/01\/enerjisadan-musa-gunes-enerjisi-santrali.jpg\"><img loading=\"lazy\" class=\"alignleft  wp-image-49378\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/01\/enerjisadan-musa-gunes-enerjisi-santrali-300x110.jpg\" alt=\"enerjisadan-musa-gunes-enerjisi-santrali\" width=\"300\" height=\"170\" \/><\/a>ricinde hemen her b\u00f6lgesinde\u00a0<span style=\"font-weight: bold; color: #222222;\">g\u00fcne\u015f enerjisi santrali\u00a0<\/span>kurulum \u00e7al\u0131\u015fmalar\u0131 ger\u00e7ekle\u015ftiriliyor. Uzmanlar art\u0131k b\u00fcy\u00fck \u00e7apl\u0131 projelerin T\u00fcrkiye\u2019de ger\u00e7ekle\u015ftirilmesi gerekti\u011fini ifade ediyor.<\/p>\n<p style=\"color: #666666;\">Sabanc\u0131 Holding ve Alman E.ON\u2019un y\u00fczde 50-50 ortakl\u0131\u011f\u0131 olan Enerjisa Enerji \u00dcretim A.\u015e. Mu\u015f ilindeki 280 MW`l\u0131k Alparslan II HES yat\u0131r\u0131m\u0131n\u0131n\u0131n ard\u0131ndan \u015fimdi de ayn\u0131 adla\u00a0<span style=\"font-weight: bold; color: #222222;\">g\u00fcne\u015f enerjisi yat\u0131r\u0131m\u0131<\/span>\u00a0yapmaya haz\u0131rlan\u0131yor. Enerjisa, Mu\u015f Merkez il\u00e7eye ba\u011fl\u0131 Alican k\u00f6y\u00fc s\u0131n\u0131rlar\u0131 i\u00e7erisinde, Muratg\u00f6ren k\u00f6y\u00fc yak\u0131nlar\u0131nda 9 MW kurulu g\u00fcce sahip\u00a0<span style=\"font-weight: bold; color: #222222;\">Alparslan\u00a0<\/span><span style=\"font-weight: bold; color: #222222;\">G\u00fcne\u015f Enerjisi Santrali (GES) Projesi`ni<\/span>\u00a0hayata ge\u00e7irmeyi planl\u0131yor.<\/p>\n<p style=\"color: #666666;\">Haberin devam\u0131 i\u00e7in\u00a0<a style=\"color: #fc8d8d;\" href=\"http:\/\/enerjigunlugu.net\/enerjisadan-musta-9-mwlik-ges_16927.html#.Vp94WU_-m1s\" target=\"_blank\">t\u0131klay\u0131n&gt;&gt;&gt;<\/a><\/p>\n<p style=\"color: #666666;\">Kaynak: Enerji G\u00fcnl\u00fc\u011f\u00fc<\/p>\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Enerjisa, Mu\u015f ilinde kurulu g\u00fcc\u00fc 9 MW olan Alparslan G\u00fcne\u015f Enerjisi Santrali kuracak. T\u00fcrkiye\u2019nin Karadeniz haricinde hemen her b\u00f6lgesinde\u00a0g\u00fcne\u015f enerjisi santrali\u00a0kurulum \u00e7al\u0131\u015fmalar\u0131 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":49378,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49],"tags":[28079,1129,63,67,1009,2698,165,422,2326,21886,227,13,2569,21768,23133,22975,4269],"views":1130,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/49377"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=49377"}],"version-history":[{"count":2,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/49377\/revisions"}],"predecessor-version":[{"id":49380,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/49377\/revisions\/49380"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/49378"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=49377"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=49377"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=49377"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}