{"id":49274,"date":"2016-01-19T00:29:18","date_gmt":"2016-01-18T21:29:18","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=49274"},"modified":"2016-01-19T00:29:18","modified_gmt":"2016-01-18T21:29:18","slug":"hindistan-geslerde-5-gw-siniri-gecti","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/hindistan-geslerde-5-gw-siniri-gecti\/","title":{"rendered":"(Turkish) Hindistan GES\u2019lerde 5 GW S\u0131n\u0131r\u0131 Ge\u00e7ti!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/49274\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Hindistan`\u0131n g\u00fcne\u015fe dayal\u0131 elektrik \u00fcretim kapasitesi 5130 megavat`a (MW) ula\u015ft\u0131. H\u00fck\u00fcmet, 2021\/22 y\u0131llar\u0131 i\u00e7in 100 bin MW`lik hedef koydu&#8230;<img loading=\"lazy\" class=\"alignright size-medium wp-image-49275\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/01\/hindistan-geslerde-5-gw-siniri-gecti-300x201.jpg\" alt=\"hindistan-geslerde-5-gw-siniri-gecti\" width=\"300\" height=\"201\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/01\/hindistan-geslerde-5-gw-siniri-gecti-300x201.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/01\/hindistan-geslerde-5-gw-siniri-gecti-500x336.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/01\/hindistan-geslerde-5-gw-siniri-gecti-74x50.jpg 74w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/01\/hindistan-geslerde-5-gw-siniri-gecti.jpg 660w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/strong><\/p>\n<p>D\u00fcnyan\u0131n yenilenebilir enerji alan\u0131ndaki y\u00fckselen y\u0131ld\u0131z\u0131 Hindistan`\u0131n GES kurulu g\u00fcc\u00fc 5 bin MW`lik s\u0131n\u0131r\u0131 a\u015ft\u0131. Ge\u00e7ti\u011fimiz g\u00fcnlerde H\u00fck\u00fcmet taraf\u0131ndan a\u00e7\u0131klanan 2015 y\u0131l\u0131 sonu verilerine g\u00f6re Hindistan`daki g\u00fcne\u015fe dayal\u0131 elektrik kurulu g\u00fcc\u00fc 5.130 MW seviyesine ula\u015ft\u0131. En \u00e7ok kurulum 1264 MW ile Rajasthan Eyaletinde. \u0130kinci s\u0131rada 1.024MW ile Gujara Eyaleti ve \u00fc\u00e7\u00fcnc\u00fc s\u0131rada 679 MW kurulu g\u00fc\u00e7 ile Madhya Pradesh Eyaleti var.<\/p>\n<p><strong><br \/>\nHEDEF 100 B\u0130N MW<\/strong><\/p>\n<p>2015 y\u0131l\u0131nda yenilenebilir yat\u0131r\u0131mlar\u0131 alan\u0131nda en h\u0131zl\u0131 b\u00fcy\u00fcmeyi kaydeden \u00fclkelerden biri konumundaki Hindistan, \u00f6zellikle g\u00fcne\u015fe dayal\u0131 yat\u0131r\u0131mlarda hedef b\u00fcy\u00fctt\u00fc. Hindistan h\u00fck\u00fcmeti, 2021\/22 y\u0131l\u0131na kadar \u00fclke \u00e7ap\u0131ndaki g\u00fcne\u015fe dayal\u0131 elektrik santrallerinin kurulu g\u00fcc\u00fcn\u00fc 100 GW`ye ula\u015ft\u0131rmay\u0131 hedefliyor.<\/p>\n<p><strong>18 B\u0130N MW`L\u0130K \u0130HALE<\/strong><\/p>\n<p>H\u00fck\u00fcmetin hedefledi\u011fi 100 bin MW`lik GES kurulu g\u00fcc\u00fcn\u00fcn 60 bin MW`\u0131n\u0131 saha projeleri olu\u015fturuyor. 40 bin MW`lik k\u0131s\u0131m ise \u00c7at\u0131 tipi GES`lerden olu\u015facak. H\u00fck\u00fcmet bu hedeflere ula\u015fmak i\u00e7in federal ve eyalet d\u00fczeylerinde bir dizi program ba\u015flatt\u0131. Bunlardan biri Mart sonu a\u00e7\u0131lacak olan 18 bin MW`lik GES ihaleleri.<\/p>\n<p><strong>750 MW`L\u0130K ULTRAMEGA GES<\/strong><\/p>\n<p>Hindistan ayr\u0131ca Ultramega GES projelerine te\u015fvik programlar\u0131 da ba\u015flatacak. Planlanan Ultramega GES projelerinin ilki \u015fimdi Madya Prade\u015f eyaletinde hayata ge\u00e7iriliyor. Ge\u00e7ti\u011fimiz hafta sonu D\u00fcnya Bankas\u0131\u2019n\u0131n yan kurulu\u015fu IFC yetkilileri d\u00fcnyada bug\u00fcne kadarki en b\u00fcy\u00fck tek GES projesi unvan\u0131na sahip olan 750 MW\u2019l\u0131k GES projesininin finansman\u0131 konusunda eyalet h\u00fck\u00fcmetine finansal destek sunacaklar\u0131n\u0131 a\u00e7\u0131klad\u0131lar.<\/p>\n<p><strong>AVUSTRALYA ORTAK OLACAK<\/strong><\/p>\n<p>Bu arada IFC, ultramega GES projelerini hayata ge\u00e7irecek \u00f6zel sekt\u00f6r yat\u0131r\u0131mc\u0131 ya da yat\u0131r\u0131mc\u0131lar\u0131n\u0131n bulunmas\u0131 konusunda da Hindistanl\u0131 yetkililere yard\u0131mc\u0131 olaca\u011f\u0131n\u0131n s\u00f6z\u00fcn\u00fc veriyor. Hatta, Hindistan`\u0131n ilk ultramega projesine ortak olmak isteyenler ortaya \u00e7\u0131kmaya ba\u015flad\u0131 bile. Bunlardan biri de Avustralya D\u0131\u015f Ticaret Bakanl\u0131\u011f\u0131. Hindistan`\u0131n ilk ultramega GES projesignign ger\u00e7ekle\u015fmesi i\u00e7in ihtiya\u00e7 duyulan 1.500 Hektar arazinin 1.300 Hektar\u0131n\u0131 Eyalet H\u00fck\u00fcmeti tahsis edecek.<\/p>\n<p>D\u00fcnyan\u0131n en b\u00fcy\u00fck GES projesi i\u00e7in D\u00fcnya Bankas\u0131`n\u0131n verdi\u011fi deste\u011fin, Hindistan h\u00fck\u00fcmetinin koydu\u011fu yeni hedeflere ula\u015fmas\u0131n\u0131 kolayla\u015ft\u0131raca\u011f\u0131 belirtiliyor.<\/p>\n<p>Kaynak: <a href=\"http:\/\/enerjigunlugu.net\/hindistan-geslerde-5-gw-siniri-gecti_16901.html\" target=\"_blank\" rel=\"nofollow\">Enerji G\u00fcnl\u00fc\u011f\u00fc<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Hindistan`\u0131n g\u00fcne\u015fe dayal\u0131 elektrik \u00fcretim kapasitesi 5130 megavat`a (MW) ula\u015ft\u0131. H\u00fck\u00fcmet, 2021\/22 y\u0131llar\u0131 i\u00e7in 100 bin MW`lik hedef koydu&#8230; D\u00fcnyan\u0131n yenilenebilir enerji alan\u0131ndaki [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":49275,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49],"tags":[4599,6966,68,63,67,1009,2698,165,2326,227,13,23133,22975,2401,4269,4034,5728,803,4198],"views":881,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/49274"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=49274"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/49274\/revisions"}],"predecessor-version":[{"id":49276,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/49274\/revisions\/49276"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/49275"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=49274"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=49274"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=49274"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}