{"id":49164,"date":"2016-01-16T08:41:02","date_gmt":"2016-01-16T05:41:02","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=49164"},"modified":"2016-01-16T08:41:02","modified_gmt":"2016-01-16T05:41:02","slug":"resmi-kurum-tarafindan-yapilan-en-buyuk-cati-ustu-gunes-sistemi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/resmi-kurum-tarafindan-yapilan-en-buyuk-cati-ustu-gunes-sistemi\/","title":{"rendered":"(Turkish) Resmi Kurum Taraf\u0131ndan Yap\u0131lan En B\u00fcy\u00fck \u00c7at\u0131 \u00dcst\u00fc G\u00fcne\u015f Sistemi!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/49164\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>T\u00fcrkiye\u2019nin resmi kurum taraf\u0131ndan yap\u0131lan en b\u00fcy\u00fck \u00e7at\u0131 \u00fcst\u00fc g\u00fcne\u015f\u00a0sisteminin Kayseri Melikgazi Belediyesince ger\u00e7ekle\u015ftirildi\u011fini hat\u0131rlatan Melikgazi Belediye Ba\u015fkan\u0131 Memduh B\u00fcy\u00fckk\u0131l\u0131\u00e7, Y\u0131ld\u0131r\u0131m Beyaz\u0131t Mahallesi\u2019nde bulunan Kapal\u0131 Semt Pazar Yerinin \u00e7at\u0131 kat\u0131nda g\u00fcne\u015f enerjisi santralinin hay\u0131rl\u0131 olmas\u0131 dile\u011finde bulundu.<\/strong><\/p>\n<p><strong>Belediyenin t\u00fcm tesislerinin 1\/3 enerjisi buradan\u2026<\/strong><a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/01\/resmi-kurum-tarafindan-yapilan-en-buyuk-cati-ustu-gunes-sistemi.jpg\"><img loading=\"lazy\" class=\"alignleft wp-image-49165\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/01\/resmi-kurum-tarafindan-yapilan-en-buyuk-cati-ustu-gunes-sistemi.jpg\" alt=\"resmi-kurum-tarafindan-yapilan-en-buyuk-cati-ustu-gunes-sistemi\" width=\"300\" height=\"212\" \/><\/a><\/p>\n<p>\u00c7at\u0131 \u00fcst\u00fc g\u00fcne\u015f santralinin toplam 3000 panelden olu\u015ftu\u011funu belirten Ba\u015fkan Memduh B\u00fcy\u00fckk\u0131l\u0131\u00e7, bu g\u00fcne\u015f santralinden elde edilen enerjinin direkt olarak Kayseri Elektrik \u015eirketi\u2019ne sat\u0131ld\u0131\u011f\u0131 bunun ile ilgili protokol\u00fcn imzaland\u0131\u011f\u0131n\u0131 kaydetti.<\/p>\n<p><strong>3 y\u0131lda tesis amorti edecek\u2026<\/strong><\/p>\n<p>G\u00fcne\u015f enerji santralinin 3 y\u0131lda kendini amorti edece\u011fini yani in\u015faat maliyetini kar\u015f\u0131layaca\u011f\u0131n\u0131 ifade eden Ba\u015fkan Dr.Memduh B\u00fcy\u00fckk\u0131l\u0131\u00e7 \u201cEnerji t\u00fcketimi kar\u015f\u0131lamak i\u00e7in T\u00fcrkiye\u2019nin resmi kurum taraf\u0131ndan yap\u0131lan en b\u00fcy\u00fck \u00e7at\u0131 \u00fcst\u00fc g\u00fcne\u015f paneli Melikgazi Belediyesince ger\u00e7ekle\u015ftirilmi\u015ftir. Toplum 3000 panelden olu\u015fmaktad\u0131r. Y\u0131lda 900.000 KW elektrik \u00fcretecek olup tamam\u0131 Kayseri Elektrik \u015firketine verilecek ve belediyenin elektrik harcamas\u0131ndan mahsup edilecektir. Dolay\u0131s\u0131 ile Melikgazi Tesislerinin tamam\u0131 bu \u00fcretimden kar\u015f\u0131lanacakt\u0131r. G\u00fcne\u015f enerjisi santrali 3 y\u0131lda kendini amorti edecek olup, santral 10 Ocak 2016 tarihi itibari ile elektrik \u00fcretmeye ba\u015flam\u0131\u015ft\u0131r. \u00c7evreci bir belediye anlay\u0131\u015f\u0131yla yenilenebilir enerji konusunda hem destek vermek hem de \u00f6rnek te\u015fkil etmek i\u00e7in \u00f6nemli bir yat\u0131r\u0131m. Kamunun yapm\u0131\u015f oldu\u011fu en b\u00fcy\u00fck \u00e7at\u0131 \u00fcst\u00fc g\u00fcne\u015f enerjisi santralini kurduk. Eme\u011fi ge\u00e7enlere te\u015fekk\u00fcr ediyorum. Melikgazi Belediyemize hay\u0131rl\u0131 olsun diyor, y\u00fcklenici firmalar\u0131m\u0131za te\u015fekk\u00fcr ediyorum. Yerli yat\u0131r\u0131mlar\u0131 \u00f6nemsiyor, destekliyoruz .\u201ddedi.<\/p>\n<p>Ba\u015fkan Memduh B\u00fcy\u00fckk\u0131l\u0131\u00e7, \u00e7at\u0131 \u00fcst\u00fc g\u00fcne\u015f santrali ile Melikgazi Belediyesi\u2019nin sadece hizmet ve yat\u0131r\u0131m \u00fcretmedi\u011fini, bundan sonra da enerji \u00fcretece\u011fini s\u00f6zlerine ekledi.<\/p>\n<p>Kaynak: \u0130HA<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.T\u00fcrkiye\u2019nin resmi kurum taraf\u0131ndan yap\u0131lan en b\u00fcy\u00fck \u00e7at\u0131 \u00fcst\u00fc g\u00fcne\u015f\u00a0sisteminin Kayseri Melikgazi Belediyesince ger\u00e7ekle\u015ftirildi\u011fini hat\u0131rlatan Melikgazi Belediye Ba\u015fkan\u0131 Memduh B\u00fcy\u00fckk\u0131l\u0131\u00e7, Y\u0131ld\u0131r\u0131m Beyaz\u0131t Mahallesi\u2019nde [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":49165,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49],"tags":[27984,68,63,67,1009,2698,165,148,227,13,2569,23133,142,22975,4269,1039,27985,27986,16845,3235],"views":938,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/49164"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=49164"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/49164\/revisions"}],"predecessor-version":[{"id":49166,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/49164\/revisions\/49166"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/49165"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=49164"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=49164"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=49164"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}