{"id":48981,"date":"2016-01-11T14:24:21","date_gmt":"2016-01-11T11:24:21","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=48981"},"modified":"2016-01-11T14:25:16","modified_gmt":"2016-01-11T11:25:16","slug":"aksa-enerjiden-270mwlik-bolu-goynuk-santralinin-ikinci-faz-basvurusu","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/aksa-enerjiden-270mwlik-bolu-goynuk-santralinin-ikinci-faz-basvurusu\/","title":{"rendered":"(Turkish) Aksa Enerji&#8217;den 270MW\u2019l\u0131k Bolu G\u00f6yn\u00fck Santrali\u2019nin \u0130kinci Faz Ba\u015fvurusu&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/48981\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<p style=\"color: #0a0a0a;\"><strong>Aksa Enerji, 270MW kurulu g\u00fcc\u00fcnde olacak Bolu G\u00f6yn\u00fck Santrali\u2019nin ikinci faz\u0131n\u0131n ge\u00e7ici kabul\u00fc i\u00e7in Bakanl\u0131\u011fa ba\u015fvuru yapt\u0131.<\/strong><span id=\"more-75349\"><\/span><\/p>\n<p style=\"color: #0a0a0a;\">Aksa Enerji\u2019dan konu ile ilgili <img loading=\"lazy\" class=\"alignleft size-full wp-image-48944\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/01\/acil-enerji-ihtiyacina-cozum-kiralik-jenerator.jpg\" alt=\"aksa-enerji\" width=\"300\" height=\"300\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/01\/acil-enerji-ihtiyacina-cozum-kiralik-jenerator.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/01\/acil-enerji-ihtiyacina-cozum-kiralik-jenerator-150x150.jpg 150w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/01\/acil-enerji-ihtiyacina-cozum-kiralik-jenerator-50x50.jpg 50w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>KAP\u2019a yap\u0131lan a\u00e7\u0131klamada \u015fu bilgiler verildi:<\/p>\n<p style=\"color: #0a0a0a;\">Toplam 270MW kurulu g\u00fcc\u00fcnde olacak Bolu G\u00f6yn\u00fck Termik Santralimizin ikinci faz\u0131 olan 135MW\u2019l\u0131k b\u00f6l\u00fcm\u00fcn\u00fcn yat\u0131r\u0131m\u0131 tamamlanm\u0131\u015f olup, test \u00fcretimleri ba\u015flam\u0131\u015ft\u0131r. \u0130kinci b\u00f6l\u00fcm\u00fcn ge\u00e7ici kabul\u00fc i\u00e7in Enerji ve Tabii Kaynaklar Bakanl\u0131\u011f\u0131\u2019na ba\u015fvurumuz Ocak ay\u0131 i\u00e7erisinde yap\u0131lacakt\u0131r.<\/p>\n<p style=\"color: #0a0a0a;\">Kamuoyuna sayg\u0131yla duyurulur.<\/p>\n<p style=\"color: #0a0a0a;\">A\u00e7\u0131klaman\u0131n \u0130ngilizce versiyonuna a\u015fa\u011f\u0131da yer verilmektedir.<br \/>\nEnglish version of the disclosure is stated below.<\/p>\n<p style=\"color: #0a0a0a;\">Announcement<\/p>\n<p style=\"color: #0a0a0a;\">The second phase (135 MW) of our Bolu Goynuk Lignite Power Plant, which will have a total installed capacity of 270MW, has been completed and test production has started. An application to the Ministry of Energy and Natural Resources for the acceptance of the seccond phase will take place within January.<\/p>\n<p style=\"color: #0a0a0a;\">Kaynak: B\u00fcltenler<\/p>\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Aksa Enerji, 270MW kurulu g\u00fcc\u00fcnde olacak Bolu G\u00f6yn\u00fck Santrali\u2019nin ikinci faz\u0131n\u0131n ge\u00e7ici kabul\u00fc i\u00e7in Bakanl\u0131\u011fa ba\u015fvuru yapt\u0131. Aksa Enerji\u2019dan konu ile ilgili [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":48944,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53],"tags":[1571,27907,24148,68,19,63,67,1009,2698,165,27908,5436,2442],"views":938,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/48981"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=48981"}],"version-history":[{"count":2,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/48981\/revisions"}],"predecessor-version":[{"id":48983,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/48981\/revisions\/48983"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/48944"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=48981"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=48981"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=48981"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}