{"id":48965,"date":"2016-01-10T18:12:28","date_gmt":"2016-01-10T15:12:28","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=48965"},"modified":"2016-01-10T18:12:28","modified_gmt":"2016-01-10T15:12:28","slug":"nukleere-tam-gaz-devam","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/nukleere-tam-gaz-devam\/","title":{"rendered":"(Turkish) N\u00fckleer&#8217;e Tam Gaz Devam!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/48965\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>T\u00fcrk &#8211; Rus krizi s\u00fcrerken Akkuyu n\u00fckleer santralinde ise ilerleme var. Santralin lisanslama s\u00fcrecinde \u00f6nemli bir e\u015fik a\u015f\u0131ld\u0131. Rusya\u2019da T\u00fcrklere n\u00fckleer e\u011fitim de 3 fireyle devam ediyor.<\/strong><\/p>\n<div style=\"color: #000000;\">Rusya ile ya\u015fanan u\u00e7ak krizi,\u00a0Rusya\u2019da T\u00fcrk \u00f6\u011frencilere verilen n\u00fckleer\u00a0e\u011fitimini engellemedi.Akkuyu\u00a0n\u00fckleer santralinde \u00e7al\u0131\u015fmak i\u00e7in Rusya\u2019da e\u011fitim g\u00f6ren 310 \u00f6\u011frenciden 307\u2019sinin e\u011fitimine devam etti\u011fi, \u00fc\u00e7 \u00f6\u011frencinin ise<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/01\/nukleere-tam-gaz-devam.jpeg\"><img loading=\"lazy\" class=\"alignright size-medium wp-image-48966\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/01\/nukleere-tam-gaz-devam-300x168.jpeg\" alt=\"nukleere-tam-gaz-devam\" width=\"300\" height=\"168\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/01\/nukleere-tam-gaz-devam-300x168.jpeg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/01\/nukleere-tam-gaz-devam-500x280.jpeg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/01\/nukleere-tam-gaz-devam-80x44.jpeg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/01\/nukleere-tam-gaz-devam.jpeg 606w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a> vizelerinde p\u00fcr\u00fcz tespit edildi\u011fi i\u00e7in e\u011fitimlerine son verildi\u011fi \u00f6\u011frenildi.<\/div>\n<div style=\"color: #000000;\">\u00d6\u011frencilerin e\u011fitimi s\u00fcrerken, n\u00fckleer santralin lisanslama s\u00fcreci kapsam\u0131nda \u00f6nemli bir a\u015fama olarak de\u011ferlendirilen \u2018Saha Parametreleri Raporu\u2019 da T\u00fcrkiye Atom Enerjisi Kurumu\u2019na (TAEK) sunuldu. Rapor, Akkuyu NGS \u0130n\u015faat Lisans\u0131 ba\u015fvurusu kapsam\u0131ndaki belgelerin TAEK taraf\u0131ndan de\u011ferlendirmeye al\u0131nmas\u0131n\u0131n \u00f6n ko\u015fulu niteli\u011finde.<\/div>\n<div style=\"color: #000000;\">Edinilen bilgiye g\u00f6re, Rusya taraf\u0131ndan incelemeye tabi tutulan ve vizelerinde p\u00fcr\u00fcz bulunan \u00fc\u00e7 \u00f6\u011frencinin d\u0131\u015f\u0131nda kalan 307 \u00f6\u011frencinin Rusya\u2019daki n\u00fckleer enerji e\u011fitimi devam ediyor. Enerji Bakanl\u0131\u011f\u0131 N\u00fckleer Enerji Daire Ba\u015fkanl\u0131\u011f\u0131\u2019n\u0131n ve\u00a0D\u0131\u015fi\u015fleri Bakanl\u0131\u011f\u0131\u2019n\u0131n \u00f6\u011frenciler ve T\u00fcrkiye\u2019deki aileleriyle s\u00fcrekli temas halinde oldu\u011fu, T\u00fcrkiye\u2019nin\u00a0Moskova\u00a0B\u00fcy\u00fckel\u00e7ili\u011fi\u2019nin de \u00f6\u011frencilerle temasta oldu\u011fu, e\u011fitimlerini takip alt\u0131nda tuttu\u011fu belirtildi. \u00d6\u011frencilerin e\u011fitiminin, \u00f6ng\u00f6r\u00fclen s\u00fcre boyunca devam edece\u011fi, Rus h\u00fck\u00fcmetinin de bu konuda olumsuz bir mesaj vermedi\u011fi kaydedildi.<\/div>\n<div style=\"color: #000000;\">\n<div id=\"inread\"><strong>Rus\u00e7a \u00f6\u011freniyorlar<\/strong><\/div>\n<\/div>\n<div style=\"color: #000000;\">Rusya ile yap\u0131lan n\u00fckleer santral anla\u015fmas\u0131 kapsam\u0131nda yaz\u0131l\u0131 ve s\u00f6zl\u00fc s\u0131navlar sonucu se\u00e7ilen \u00f6\u011frenciler, dil e\u011fitimi ve teknik e\u011fitimin ard\u0131ndan, T\u00fcrkiye\u2019deki santrali de in\u015fa eden Rosatom\u2019un n\u00fckleer santrallerinde staj g\u00f6recek. \u00d6\u011frencilerin masraflar\u0131, santral i\u00e7in T\u00fcrkiye\u2019de kurulan \u015firket taraf\u0131ndan kar\u015f\u0131lan\u0131yor. Rusya\u2019n\u0131n g\u00f6sterdi\u011fi yerde kalan \u00f6\u011frencilerin zaman zaman T\u00fcrkiye\u2019ye gelip ailelerini g\u00f6rmelerine de olanak sa\u011flan\u0131yor. E\u011fitimini bitiren \u00f6\u011frenciler, Akkuyu n\u00fckleer santralinde \u00e7al\u0131\u015fmaya ba\u015flayacak. Yakla\u015f\u0131k 7 y\u0131ll\u0131k program\u0131n 1.5 y\u0131l\u0131 Rus\u00e7a e\u011fitimi, 5.5 y\u0131l\u0131 ise n\u00fckleer enerji e\u011fitiminden olu\u015fuyor. 2010\u2019da T\u00fcrkiye ile Rusya aras\u0131nda imzalanan anla\u015fma \u00e7er\u00e7evesinde ger\u00e7ekle\u015ftirilen e\u011fitim, Rusya Federasyonu Ulusal N\u00fckleer Ara\u015ft\u0131rmalar \u00dcniversitesi Moskova Fizik M\u00fchendisli\u011fi Enstit\u00fcs\u00fc, Obninsk N\u00fckleer Enerji Enstit\u00fcs\u00fc ve St. Petersburg Devlet Politeknik \u00dcniversitesi\u2019nde icra ediliyor.<\/div>\n<div style=\"color: #000000;\"><strong>Kritik rapor sunuldu<\/strong><\/div>\n<div style=\"color: #000000;\">\n<div>\u201cSaha Parametreleri Raporu\u201d, Akkuyu N\u00fckleer A\u015e taraf\u0131ndan ge\u00e7ti\u011fimiz 30 Aral\u0131k\u2019ta TAEK\u2019e sunuldu. Rapor, santralin g\u00fcvenli\u011fini sa\u011flamak ad\u0131na santral tasar\u0131m\u0131nda esas al\u0131nacak parametrelerin do\u011frulanmas\u0131 ve TAEK taraf\u0131ndan onaylanmas\u0131 amac\u0131yla haz\u0131rland\u0131.<\/div>\n<div>Enerji ve Tabii Kaynaklar Bakan\u0131 Berat Albayrak ge\u00e7en ay yapt\u0131\u011f\u0131 de\u011ferlendirmede, Akkuyu N\u00fckleer Santrali\u2019nin ak\u0131beti ile ilgili, \u201cProje ile ilgili T\u00fcrkiye Cumhuriyeti Devleti\u2019ne iletilmi\u015f herhangi olumsuz bir mevzu yok. Hem Rusya hem \u015firket projeye devam ediyor\u201d de\u011ferlendirmesi yapm\u0131\u015ft\u0131.<\/div>\n<div><\/div>\n<div>Kaynak: <a href=\"http:\/\/www.milliyet.com.tr\/nukleer-tam-gaz\/ekonomi\/detay\/2176075\/default.htm\" target=\"_blank\" rel=\"nofollow\">Milliyet<\/a><\/div>\n<\/div>\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.T\u00fcrk &#8211; Rus krizi s\u00fcrerken Akkuyu n\u00fckleer santralinde ise ilerleme var. Santralin lisanslama s\u00fcrecinde \u00f6nemli bir e\u015fik a\u015f\u0131ld\u0131. Rusya\u2019da T\u00fcrklere n\u00fckleer e\u011fitim de [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":48966,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,43],"tags":[3019,1026,63,67,1009,2698,165,71,21,25480,23614,2973],"views":883,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/48965"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=48965"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/48965\/revisions"}],"predecessor-version":[{"id":48967,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/48965\/revisions\/48967"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/48966"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=48965"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=48965"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=48965"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}