{"id":48798,"date":"2016-01-07T01:10:37","date_gmt":"2016-01-06T22:10:37","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=48798"},"modified":"2016-01-07T01:31:59","modified_gmt":"2016-01-06T22:31:59","slug":"bu-yil-elektrige-6-milyar-euroluk-yatirim-yapilacak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/bu-yil-elektrige-6-milyar-euroluk-yatirim-yapilacak\/","title":{"rendered":"(Turkish) Bu Y\u0131l Elektri\u011fe 6 Milyar Euroluk Yat\u0131r\u0131m Yap\u0131lacak&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/48798\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<p style=\"color: #0a0a0a;\"><strong>T\u00fcrkiye\u2019de bu y\u0131l elektrikte kurulu g\u00fcce 6 bin 254 megavat kapasite eklenecek, bunun y\u00fczde 61\u2019i yerli ve yenilenebilir kaynaklara dayal\u0131 olacak. Bu y\u0131lki yat\u0131r\u0131mlar\u0131n toplam tutar\u0131 ise 6 milyar euroyu a\u015facak.\u00a0<\/strong><span id=\"more-75266\"><\/span><\/p>\n<p style=\"color: #0a0a0a;\">Enerji ve Tabii Kaynaklar Bakanl\u0131\u011f\u0131 verilerinden yap\u0131lan derlemeye g\u00f6re, T\u00fcrkiye\u2019nin elektrikteki kurulu g\u00fcc\u00fc 2015 sonu itibar\u0131yla 73 bin megavat\u0131 a\u015ft\u0131. Ge\u00e7en y\u0131l kurulu g\u00fcce 4 bin 287 megavatl\u0131k yeni kapasite eklendi, bunun y\u00fc<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/01\/bu-yil-elektrige-6-milyar-euroluk-yatirim-yapilacak.jpg\"><img loading=\"lazy\" class=\"alignright size-medium wp-image-48800\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/01\/bu-yil-elektrige-6-milyar-euroluk-yatirim-yapilacak-300x165.jpg\" alt=\"bu-yil-elektrige-6-milyar-euroluk-yatirim-yapilacak\" width=\"300\" height=\"165\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/01\/bu-yil-elektrige-6-milyar-euroluk-yatirim-yapilacak-300x165.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/01\/bu-yil-elektrige-6-milyar-euroluk-yatirim-yapilacak-500x276.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/01\/bu-yil-elektrige-6-milyar-euroluk-yatirim-yapilacak-80x44.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/01\/bu-yil-elektrige-6-milyar-euroluk-yatirim-yapilacak.jpg 696w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>zde 95\u2019ini yerli ve yenilenebilir enerji kaynaklar\u0131 olu\u015fturdu.<\/p>\n<p style=\"color: #0a0a0a;\">Cumhuriyet tarihinde ilk kez bir y\u0131l i\u00e7erisinde devreye al\u0131nan elektrik kapasitesinde yerli ve yenilenebilir enerji kaynaklar\u0131n\u0131n pay\u0131 y\u00fczde 95 seviyesine ula\u015ft\u0131. Ge\u00e7en y\u0131l, bu anlamda, \u00a0\u201cenerjide yerli y\u0131l\u201d olarak nitelendirildi.<\/p>\n<p style=\"color: #0a0a0a;\">Ge\u00e7en y\u0131l, 2 bin 229,4 megavatl\u0131k hidroelektrik, 830 megavatl\u0131k r\u00fczgar, 958 megavatl\u0131k termik kapasite art\u0131\u015f\u0131 meydana geldi. Ayr\u0131ca, 2015\u2019te \u00e7\u00f6p, biyok\u00fctle, at\u0131k \u0131s\u0131 ve jeotermal kaynaklar\u0131n olu\u015fturdu\u011fu 269 megavat g\u00fcc\u00fcndeki santraller de devreye al\u0131nd\u0131.<\/p>\n<p style=\"color: #0a0a0a;\">Megavat ba\u015f\u0131na maliyetlerin 1 ile 1,3 milyon euro aras\u0131nda de\u011fi\u015fti\u011fi enerji sekt\u00f6r\u00fcnde, 2015\u2019te 4,5 milyar euroyu bulan yat\u0131r\u0131m ger\u00e7ekle\u015fmi\u015f oldu.<\/p>\n<p style=\"color: #0a0a0a;\">T\u00fcrkiye\u2019nin kurulu g\u00fcc\u00fcne 2016 i\u00e7erisinde toplamda 6 bin 254 megavat daha kapasite eklenecek. Bu kapasitenin bin 716 megavat\u0131n\u0131 do\u011falgaz, bin 300 megavat\u0131n\u0131 hidroelektrik, bin megavat\u0131n\u0131 r\u00fczgar, \u00a0700 megavat\u0131n\u0131 ithal k\u00f6m\u00fcr ve 575 megavat\u0131n\u0131 da yerli k\u00f6m\u00fcr kaynaklar\u0131na dayal\u0131 olacak.<\/p>\n<p style=\"color: #0a0a0a;\">Bu y\u0131l ayr\u0131ca ek olarak, 200 megavatl\u0131k jeotermal, 50 megavatl\u0131k biyok\u00fctle, 13 megavatl\u0131k lisansl\u0131 g\u00fcne\u015f, 500 megavatl\u0131k lisanss\u0131z yenilenebilir enerji kaynaklar\u0131 ile 200 megavat kapasitesinde lisanss\u0131z kojenerasyon tesisi devreye al\u0131nacak.<\/p>\n<p style=\"color: #0a0a0a;\">Planlanan enerji yat\u0131r\u0131mlar\u0131n\u0131n maliyetinin, kurulu g\u00fc\u00e7 toplam\u0131 dikkate al\u0131nd\u0131\u011f\u0131nda y\u0131l sonunda 6 milyar euroyu a\u015faca\u011f\u0131 hesaplan\u0131yor.<\/p>\n<p style=\"color: #0a0a0a;\">Kaynak: Enerji Enstit\u00fcs\u00fc<\/p>\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. T\u00fcrkiye\u2019de bu y\u0131l elektrikte kurulu g\u00fcce 6 bin 254 megavat kapasite eklenecek, bunun y\u00fczde 61\u2019i yerli ve yenilenebilir kaynaklara dayal\u0131 olacak. Bu [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":48800,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53],"tags":[27824,68,61,19638,2873,63,67,1009,2698,165,17073,532,1663,27825,6339],"views":855,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/48798"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=48798"}],"version-history":[{"count":2,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/48798\/revisions"}],"predecessor-version":[{"id":48811,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/48798\/revisions\/48811"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/48800"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=48798"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=48798"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=48798"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}