{"id":48643,"date":"2016-01-02T22:20:08","date_gmt":"2016-01-02T19:20:08","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=48643"},"modified":"2016-01-02T22:22:33","modified_gmt":"2016-01-02T19:22:33","slug":"kacak-elektrikle-mucadelede-yeni-donem","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/kacak-elektrikle-mucadelede-yeni-donem\/","title":{"rendered":"(Turkish) Ka\u00e7ak Elektrikle M\u00fccadelede Yeni D\u00f6nem!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/48643\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>ELDER Genel Sekreteri U\u011fur Y\u00fcksel, ka\u00e7ak elektrikle m\u00fccadelede yeni bir d\u00f6neme girildi\u011fini belirterek, &#8220;Kay\u0131p oranlar\u0131n\u0131n y\u00fcksek oldu\u011fu b\u00f6lgelerde, otomatik saya\u00e7 okuma sistemleriyle t\u00fcketimler s\u00fcrekli izlenecek ve ka\u00e7ak kullan\u0131mlar an\u0131nda belirlenip, gerekli \u00f6nlem al\u0131nacak&#8221; dedi.<\/strong><\/p>\n<p>Elektrik Da\u011f\u0131t\u0131m Hizmetleri Derne\u011fi (ELDER) Genel Sekreteri U\u011fur Y\u00fcksel,\u00a0Ka\u00e7ak\u00a0elektrikle m\u00fccadelede yeni bir d\u00f6neme girildi\u011fini belirterek,<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/09\/elektrik-kayip-kacak-bedeli-iade-696x385.jpg\"><img loading=\"lazy\" class=\"alignleft size-medium wp-image-44115\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/09\/elektrik-kayip-kacak-bedeli-iade-696x385-300x165.jpg\" alt=\"elektrik-kayip-kacak\" width=\"300\" height=\"165\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/09\/elektrik-kayip-kacak-bedeli-iade-696x385-300x165.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/09\/elektrik-kayip-kacak-bedeli-iade-696x385-500x276.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/09\/elektrik-kayip-kacak-bedeli-iade-696x385-80x44.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/09\/elektrik-kayip-kacak-bedeli-iade-696x385.jpg 696w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a> &#8220;Kay\u0131p oranlar\u0131n\u0131n y\u00fcksek oldu\u011fu b\u00f6lgelerde, otomatik saya\u00e7 okuma sistemleriyle t\u00fcketimler s\u00fcrekli izlenecek ve ka\u00e7ak kullan\u0131mlar an\u0131nda belirlenip, gerekli \u00f6nlem al\u0131nacak&#8221; dedi.<\/p>\n<p>Y\u00fcksel, AA&#8217; muhabirine yapt\u0131\u011f\u0131 a\u00e7\u0131klamada, Da\u011f\u0131t\u0131m Sistemindeki Kay\u0131plar\u0131n Azalt\u0131lmas\u0131na Dair Tedbirler Y\u00f6netmeli\u011fi&#8217;nin ka\u00e7ak elektrikle m\u00fccadeleye h\u0131z kazand\u0131raca\u011f\u0131n\u0131 vurgulad\u0131.<br \/>\n\u00d6zellikle\u00a0G\u00fcneydo\u011fu\u00a0Anadolu\u00a0ve\u00a0Do\u011fu Anadolu\u00a0b\u00f6lgelerinde y\u00fcksek oranlarda olan ka\u00e7ak elektrik kullan\u0131m\u0131n\u0131n \u00f6n\u00fcne ge\u00e7ilmesi i\u00e7in yo\u011fun bir \u00e7al\u0131\u015fma s\u00fcrd\u00fcr\u00fcld\u00fc\u011f\u00fcn\u00fc kaydeden Y\u00fcksel, \u015f\u00f6yle devam etti:<\/p>\n<p>&#8220;Resmi\u00a0gazete&#8217;nin d\u00fcnk\u00fc say\u0131s\u0131nda yay\u0131mlanarak y\u00fcr\u00fcrl\u00fc\u011fe giren y\u00f6netmelikle, ka\u00e7ak elektrikle m\u00fccadelede yeni bir d\u00f6neme girildi. Kay\u0131p oranlar\u0131n\u0131n y\u00fcksek oldu\u011fu bu b\u00f6lgelerde otomatik saya\u00e7 okuma sistemleri ile t\u00fcketimler s\u00fcrekli izlenecek ve ka\u00e7ak kullan\u0131mlar an\u0131nda belirlenip gerekli i\u015flem yap\u0131lacak. M\u00fcdahale olmamas\u0131 i\u00e7in saya\u00e7lar muhafaza alt\u0131na al\u0131nacak. \u015eirketlerin ka\u00e7akla m\u00fccadale anlam\u0131nda yapt\u0131klar\u0131 uygulamalar kalite y\u00f6netmeli\u011finin k\u0131s\u0131tlamalar\u0131na dahil edilmeyecek. Ayr\u0131ca ka\u00e7ak kullan\u0131m\u0131n en y\u00fcksek oldu\u011fu tar\u0131msal sulamayla ilgili olarak, abonelik veya saya\u00e7 olmayan arazilerdeki elektrik kullan\u0131m\u0131n\u0131n belirlenmesi halinde ise da\u011f\u0131t\u0131m \u015firketleri ka\u00e7ak elektrik tespit tutana\u011f\u0131 d\u00fczenleyebilecek.&#8221;<\/p>\n<p><strong>Y\u00d6NETMEL\u0130K NE GET\u0130R\u0130YOR?<\/strong><\/p>\n<p>Enerji Piyasas\u0131 D\u00fczenleme Kurumu (EPDK) taraf\u0131ndan 31 Aral\u0131k 2015 tarihli\u00a0Resmi Gazete&#8217;de yay\u0131mlanarak y\u00fcr\u00fcrl\u00fc\u011fe giren y\u00f6netmelikle, teknik ve teknik olmayan kay\u0131p oranlar\u0131 \u00fclke ortalamas\u0131n\u0131n \u00fczerinde olan elektrik da\u011f\u0131t\u0131m b\u00f6lgelerinde, faaliyette bulunan da\u011f\u0131t\u0131m \u015firketleri i\u00e7in di\u011fer da\u011f\u0131t\u0131m b\u00f6lgelerinden farkl\u0131 olarak al\u0131nacak tedbirler belirlendi.<\/p>\n<p>Elektrik kay\u0131p oran\u0131 y\u00fcksek \u015firketlerin yat\u0131r\u0131mlar\u0131yla ilgili de d\u00fczenlemeler getiren y\u00f6netmelikle, kay\u0131p oranlar\u0131n\u0131n d\u00fc\u015f\u00fcr\u00fclmesi amac\u0131yla ilgili mevzuat \u00e7er\u00e7evesinde Otomatik Saya\u00e7 Okuma Sistemi&#8217;nde yer almayan saya\u00e7lar, ilgili \u015firketin yat\u0131r\u0131m plan\u0131na konularak bu sisteme dahil edilecek.<\/p>\n<p>Bu \u015firketlerin da\u011f\u0131t\u0131m b\u00f6lgeleri i\u00e7inde yer alan ve \u00f6nceki y\u0131l ger\u00e7ekle\u015fmelerine g\u00f6re kay\u0131p oran\u0131 y\u00fczde 30&#8217;un \u00fczerinde olan il ve il\u00e7elerde, ilgili da\u011f\u0131t\u0131m \u015firketi taraf\u0131ndan kay\u0131p-ka\u00e7ak ile m\u00fccadele kapsam\u0131nda, elektrik saya\u00e7lar\u0131n\u0131n tesisi i\u00e7in mevzuatta tan\u0131mlanan yerden farkl\u0131 bir yer belirlenebilecek. Sayac\u0131n konuldu\u011fu nokta ile kullan\u0131c\u0131n\u0131n ba\u011flant\u0131 noktas\u0131 aras\u0131nda, ilgili kullan\u0131c\u0131 d\u0131\u015f\u0131nda yap\u0131lacak m\u00fcdahaleler ise da\u011f\u0131t\u0131m \u015firketinin sorumlulu\u011funda olacak.<\/p>\n<p>Yeni d\u00fczenleme kapsam\u0131ndaki ortaya \u00e7\u0131kacak maliyetlerden baz\u0131lar\u0131 ise \u015firketlerin tarife hesaplamalar\u0131nda yat\u0131r\u0131m harcamas\u0131 olarak dikkate al\u0131nacak.<\/p>\n<p>Kaynak: <a href=\"http:\/\/www.milliyet.com.tr\/kacak-elektrikle-mucadelede-yeni\/ekonomi\/detay\/2172525\/default.htm\" target=\"_blank\" rel=\"nofollow\">Milliyet<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.ELDER Genel Sekreteri U\u011fur Y\u00fcksel, ka\u00e7ak elektrikle m\u00fccadelede yeni bir d\u00f6neme girildi\u011fini belirterek, &#8220;Kay\u0131p oranlar\u0131n\u0131n y\u00fcksek oldu\u011fu b\u00f6lgelerde, otomatik saya\u00e7 okuma sistemleriyle t\u00fcketimler [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":44115,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53],"tags":[19176,9735,68,61,19638,2873,63,67,1009,2698,165,12471,7065,4255,8138,1388],"views":1025,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/48643"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=48643"}],"version-history":[{"count":3,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/48643\/revisions"}],"predecessor-version":[{"id":48646,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/48643\/revisions\/48646"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/44115"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=48643"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=48643"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=48643"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}