{"id":48127,"date":"2015-12-20T17:27:36","date_gmt":"2015-12-20T14:27:36","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=48127"},"modified":"2015-12-20T17:27:36","modified_gmt":"2015-12-20T14:27:36","slug":"batmana-13-6-mwlik-guneslik-hes-kurulacak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/batmana-13-6-mwlik-guneslik-hes-kurulacak\/","title":{"rendered":"(Turkish) Batman&#8217;a 13.6 MW&#8217;l\u0131k G\u00fcne\u015flik HES Kurulacak!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/48127\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Sason Elektrik, Batman`da Sason \u00e7ay\u0131 \u00fczerinde 13.6 MW`l\u0131k G\u00fcne\u015flik Hidroelektrik santrali kurmay\u0131 planl\u0131yor.<\/strong><\/p>\n<p>Sason Elektrik \u00dcretim Tic. ve San. Ltd. \u015eti. taraf\u0131ndan Batman \u0130li, Sason \u0130l\u00e7esi, Sason \u00c7ay\u0131 \u00fczerinde, Erdem<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/12\/batmana-13-6-mwlik-guneslik-hes-kurulacak.jpg\"><img loading=\"lazy\" class=\"alignright size-medium wp-image-48128\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/12\/batmana-13-6-mwlik-guneslik-hes-kurulacak-300x144.jpg\" alt=\"batmana-13-6-mwlik-guneslik-hes-kurulacak\" width=\"300\" height=\"144\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/12\/batmana-13-6-mwlik-guneslik-hes-kurulacak-300x144.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/12\/batmana-13-6-mwlik-guneslik-hes-kurulacak-500x241.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/12\/batmana-13-6-mwlik-guneslik-hes-kurulacak-80x38.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/12\/batmana-13-6-mwlik-guneslik-hes-kurulacak.jpg 615w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>liYocad\u00fcz\u00fc Mahalleleri &#8211; Cevizli K\u00f6y\u00fc Mevkii\u2019nde 13.68 MW`l\u0131k G\u00fcne\u015flik Hidroelektrik santrali ve hidro elektrik santral \u00fcnitelerinin in\u015faas\u0131 i\u00e7in gerekli k\u0131rma-eleme ve haz\u0131r beton tesisi kurulmas\u0131 planlan\u0131yor.<\/p>\n<p>68 340 453 TL bedelli proje ile y\u0131lda 40.12 GWh elektrik \u00fcretilmesi ve \u00fcretilen elektri\u011fin33.00 kV gerilime y\u00fckseltilerek yaklas\u0131k 15 km uzunlu\u011fundaki 4 x 477 MCM enerji nakil hatt\u0131yla Batman HES trafo merkezine ba\u011flanmak suretiyle enterkonnekte sisteme aktar\u0131lmas\u0131 planlan\u0131yor.<\/p>\n<p><strong>PROJE \u0130LE \u0130LG\u0130L\u0130 \u00c7ED S\u00dcREC\u0130 BA\u015eLADI<\/strong><\/p>\n<p>\u00c7evresel Etki De\u011ferlendirmesi \u0130zin ve Denetim Genel M\u00fcd\u00fcrl\u00fc\u011f\u00fc`n\u00fcn yapt\u0131\u011f\u0131 a\u00e7\u0131klamada, proje ile ilgili \u00c7evresel Etki De\u011ferlendirmesi s\u00fcrecinin ba\u015flad\u0131\u011f\u0131 duyuruldu. \u00c7ED S\u00fcreci tamamlanana kadar s\u00fcre\u00e7 ile ilgili her t\u00fcrl\u00fc bilgiler ve projeye ili\u015fkin g\u00f6r\u00fc\u015f, soru ve \u00f6neriler Batman Valili\u011fi`ne (\u00c7evre ve \u015eehircilik \u0130l M\u00fcd\u00fcrl\u00fc\u011f\u00fc) veya \u00c7evre ve \u015eehircilik Bakanl\u0131\u011f\u0131\u2019na g\u00f6nderilebilecek.<\/p>\n<p>Kaynak: <a href=\"http:\/\/enerjigunlugu.net\/batmana-136-mwlik-guneslik-hes-kurulacak_16480.html#.Vna6c1SLRdh\" target=\"_blank\" rel=\"nofollow\">Enerji G\u00fcnl\u00fc\u011f\u00fc<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Sason Elektrik, Batman`da Sason \u00e7ay\u0131 \u00fczerinde 13.6 MW`l\u0131k G\u00fcne\u015flik Hidroelektrik santrali kurmay\u0131 planl\u0131yor. Sason Elektrik \u00dcretim Tic. ve San. Ltd. \u015eti. taraf\u0131ndan Batman [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":48128,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,47],"tags":[2793,5927,63,67,1009,2698,165,27567,35370,23125,1090,23124,27569,27568],"views":1281,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/48127"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=48127"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/48127\/revisions"}],"predecessor-version":[{"id":48129,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/48127\/revisions\/48129"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/48128"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=48127"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=48127"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=48127"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}