{"id":48106,"date":"2015-12-20T14:25:10","date_gmt":"2015-12-20T11:25:10","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=48106"},"modified":"2015-12-20T14:25:10","modified_gmt":"2015-12-20T11:25:10","slug":"kosovada-milyarlik-enerji-projesinde-imzalar-atildi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/kosovada-milyarlik-enerji-projesinde-imzalar-atildi\/","title":{"rendered":"(Turkish) Kosova\u2019da Milyarl\u0131k Enerji Projesinde \u0130mzalar At\u0131ld\u0131&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/48106\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Kosova\u2019da enerji darbo\u011faz\u0131n\u0131 \u00e7\u00f6zecek proje hayata ge\u00e7iriliyor. Y\u0131llard\u0131r elektrik s\u0131k\u0131nt\u0131s\u0131 ile kar\u015f\u0131la\u015fan Kosova\u2019da yeni termik santral i\u00e7in \u0130yi Niyet Anla\u015fmas\u0131 imzaland\u0131.<\/strong><\/p>\n<p>Pri\u015ftine\u2019de Kosova Ekono<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/12\/kosovada-milyarlik-enerji-projesinde-imzalar-atildi.jpg\"><img loading=\"lazy\" class=\"alignleft  wp-image-48107\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/12\/kosovada-milyarlik-enerji-projesinde-imzalar-atildi.jpg\" alt=\"kosovada-milyarlik-enerji-projesinde-imzalar-atildi\" width=\"300\" height=\"247\" \/><\/a>mik Kalk\u0131nma Bakanl\u0131\u011f\u0131 ile termik santrali in\u015fa edecek ABD\u2019li \u015firket Contour Global aras\u0131nda \u0130yi Niyet Anla\u015fmas\u0131 imzaland\u0131. Kosova devlet erkan\u0131n\u0131n haz\u0131r bulundu\u011fu t\u00f6rende konu\u015fan Kosova Ba\u015fbakan\u0131 \u0130sa Mustafa, Ba\u015fbakan Yard\u0131mc\u0131s\u0131 ve D\u0131\u015fi\u015fleri Bakan\u0131 Hashim Tha\u00e7i, Ekonomik Kalk\u0131nma Bakan\u0131 Blerand Stavileci ile Contour Global G\u00fcneydo\u011fu Avrupa \u0130cra M\u00fcd\u00fcr\u00fc Garry Levesley yeni termik santralin Kosova\u2019ya sa\u011flayaca\u011f\u0131 getirilere de\u011findi. Kosova\u2019da tarihin en b\u00fcy\u00fck yat\u0131r\u0131m\u0131n\u0131n ger\u00e7ekle\u015fmesine start verildi\u011fi ve \u00fclkenin enerji ihtiyac\u0131n\u0131 kar\u015f\u0131layacak \u201cKosova e Re\u201d (Yeni Kosova) isimli termik santralin Kosova\u2019n\u0131n ekonomik kalk\u0131nmas\u0131na h\u0131z kazand\u0131raca\u011f\u0131 kaydedildi. Yap\u0131lacak yat\u0131r\u0131mla elektrik ile tedarikte s\u0131k\u0131nt\u0131lar\u0131n ortadan kalkaca\u011f\u0131, t\u00fcketici ve i\u015fletmelerin rahatlayaca\u011f\u0131 kaydedildi.<\/p>\n<p>Avrupa\u2019n\u0131n en b\u00fcy\u00fck k\u00f6m\u00fcr rezervlerine sahip olan Kosova\u2019da in\u015fa edilecek termik santral 500 MW g\u00fcc\u00fcnde olacak. 1 milyar euroya mal olacak yeni termik santral 2020\u2032de \u00fcretime ba\u015flayacak. 500 ki\u015finin istihdam edilece\u011fi elektrik santrali Kosova\u2019da br\u00fct \u00fcretimi y\u00fczde 1 art\u0131racak. \u00c7evreye zarar vermeyecek olan termik santral, en \u00fcst standartlara uyularak in\u015fa edilecek.<\/p>\n<p>Kaynak: \u0130HA<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Kosova\u2019da enerji darbo\u011faz\u0131n\u0131 \u00e7\u00f6zecek proje hayata ge\u00e7iriliyor. Y\u0131llard\u0131r elektrik s\u0131k\u0131nt\u0131s\u0131 ile kar\u015f\u0131la\u015fan Kosova\u2019da yeni termik santral i\u00e7in \u0130yi Niyet Anla\u015fmas\u0131 imzaland\u0131. Pri\u015ftine\u2019de Kosova [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":48107,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53],"tags":[68,160,12198,63,67,1009,2698,165,9577,1443,5326,3235,8265,438,1286],"views":1100,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/48106"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=48106"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/48106\/revisions"}],"predecessor-version":[{"id":48108,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/48106\/revisions\/48108"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/48107"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=48106"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=48106"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=48106"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}