{"id":47994,"date":"2015-12-17T10:03:18","date_gmt":"2015-12-17T07:03:18","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=47994"},"modified":"2015-12-17T10:03:18","modified_gmt":"2015-12-17T07:03:18","slug":"bilgin-enerji-ve-nordex-isbirligi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/bilgin-enerji-ve-nordex-isbirligi\/","title":{"rendered":"(Turkish) Bilgin Enerji ve Nordex \u0130\u015fbirli\u011fi&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/47994\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<div class=\"entry_content\" style=\"color: #666666;\">\n<p><span style=\"font-weight: bold; color: #222222;\"><a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/12\/alternatif-enerji-nordex-imza-t\u00f6reni-500x500_c.jpg\"><img loading=\"lazy\" class=\"alignleft size-medium wp-image-47995\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/12\/alternatif-enerji-nordex-imza-t\u00f6reni-500x500_c-300x300.jpg\" alt=\"alternatif-enerji-nordex-imza-t\u00f6reni-500x500_c\" width=\"300\" height=\"300\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/12\/alternatif-enerji-nordex-imza-t\u00f6reni-500x500_c-300x300.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/12\/alternatif-enerji-nordex-imza-t\u00f6reni-500x500_c-150x150.jpg 150w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/12\/alternatif-enerji-nordex-imza-t\u00f6reni-500x500_c-400x400.jpg 400w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/12\/alternatif-enerji-nordex-imza-t\u00f6reni-500x500_c-50x50.jpg 50w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/12\/alternatif-enerji-nordex-imza-t\u00f6reni-500x500_c.jpg 500w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>Bilgin Enerji Yat\u0131r\u0131m Holding ve Alman r\u00fczgar t\u00fcrbini \u00fcreticisi Nordex kapasite art\u0131r\u0131m anla\u015fmas\u0131 imzalad\u0131.<\/span><\/p>\n<p>Bilgin Enerji Yat\u0131r\u0131m Holding ve Alman\u00a0<span style=\"font-weight: bold; color: #222222;\">r\u00fczgar t\u00fcrbini \u00fcreticisi\u00a0<\/span>Nordex toplam 100 MW b\u00fcy\u00fckl\u00fc\u011f\u00fcnde d\u00f6rt adet santral i\u00e7in kapasite art\u0131r\u0131m anla\u015fmas\u0131 imzalad\u0131.<\/p>\n<p>\u0130mza t\u00f6renine, Bilgin Enerji CEO ve Y\u00f6netim Kurulu Ba\u015fkan Vekili Tolga Bilgin, Bilgin Enerji Y\u00f6netim Kurulu \u00dcyesi Altu\u011f Bilgin, Nordex SE CEO\u2019su Lars Krogsgaard, Nordex Enerji A.\u015e. Genel M\u00fcd\u00fcr\u00fc \u0130brahim \u00d6zarslan, Nordex SE EMEA G\u00fcney B\u00f6lge Direkt\u00f6r\u00fc Norbert Dwenger ile Nordex SE EMEA G\u00fcney Sat\u0131\u015f Direkt\u00f6r\u00fc Dorotea Delbr\u00fcck kat\u0131ld\u0131.<\/p>\n<p>\u0130ki firma aras\u0131nda 2008 y\u0131l\u0131n\u0131n Nisan ay\u0131nda ba\u015flayan i\u015fbirli\u011fi, 100MW\u2019l\u0131k bu sipari\u015f ile daha da g\u00fc\u00e7lenmi\u015f oldu. Bilgin Enerji, ilk olarak 2008\u2019in Nisan ay\u0131nda 22,5MW\u2019l\u0131k \u00c7e\u015fme\u2019de bulunan Maz\u0131-III RES projesi i\u00e7in Nordex\u2019e 9 adet N90\/2500 Beta t\u00fcrbin sipari\u015fi vermi\u015fti. Temelleri bu proje ile at\u0131lan i\u015fbirli\u011fi, 2009 y\u0131l\u0131nda imzalanan toplam kapasitesi 180MW olan Bergama RES ve Soma RES projeleri ile devam etti. Y\u0131l\u0131n\u0131n en b\u00fcy\u00fck iki sipari\u015fini olu\u015fturan bu projeler ile Bilgin Enerji\u00a0<span style=\"font-weight: bold; color: #222222;\">r\u00fczgar enerjisi sekt\u00f6r\u00fcnde<\/span>\u00a0\u00f6nc\u00fc olan rol\u00fcn\u00fc bir kez daha ortaya koymu\u015f oldu.<\/p>\n<p>2010 y\u0131l\u0131nda, i\u015fbirli\u011finin ilk projesi olan Maz\u0131-III projesine 7,5MW\u2019l\u0131k bir kapasite artt\u0131r\u0131m\u0131 yap\u0131ld\u0131 ve Bilgin Enerji\u2019nin ilk projesi olan Band\u0131rma projesine 5 MW\u2019l\u0131k kapasite artt\u0131r\u0131m\u0131 ile T\u00fcrkiye\u2019de bir ilk te\u015fkil ederek, farkl\u0131 t\u00fcrbin \u00fcreticisine ait iki farkl\u0131 t\u00fcrbin ayn\u0131 sahada elektrik \u00fcretmeye ba\u015flad\u0131. Bilgin Enerji\u2019nin 30MW\u2019l\u0131k bu santralini Nordex t\u00fcrbinleri ile geni\u015fletmesi, iki firma aras\u0131ndaki i\u015f birli\u011fini peki\u015ftirmi\u015f oldu. Bu projede Nordex\u2019in Gamma Generation platformuna ait N90\/2500 t\u00fcrbinler kullan\u0131ld\u0131.<\/p>\n<p>2012 y\u0131l\u0131nda \u00c7e\u015fme\u2019de kurulacak olan 50MW\u2019l\u0131k Zeytineli projesi i\u00e7in imzalar at\u0131larak, Bilgin Nordex ortakl\u0131\u011f\u0131nda 265MW\u2019l\u0131k toplam kurulu g\u00fcce ula\u015f\u0131ld\u0131. Bug\u00fcn Bilgin Enerji\u2019ye ait r\u00fczgar santrallerine tahsis edilmi\u015f 7 Nordex teknisyeni g\u00f6rev yap\u0131yor. Bilgin Enerji\u2019nin kendi b\u00fcnyesinde yeti\u015ftirdi\u011fi teknisyenleri ile tek bir tak\u0131m halinde \u00e7al\u0131\u015fan servis ekipleri, ba\u015far\u0131l\u0131 i\u015f birli\u011finin en \u00f6nemli g\u00f6stergesi olarak g\u00f6ze \u00e7arp\u0131yor.<br \/>\nBilgin Enerji\u2019ye ait santrallerde bulunan Nordex t\u00fcrbinleri ortalama 872,000MWh elektrik \u00fcreterek, yakla\u015f\u0131k 250,000 haneye temiz enerji ula\u015ft\u0131r\u0131yor.<\/p>\n<p><span style=\"font-weight: bold; color: #222222;\">100MW\u2019l\u0131k 4 adet kapasite art\u0131r\u0131m projesi<\/span><\/p>\n<p>100MW toplam kurulu g\u00fc\u00e7 i\u00e7in imzalanan yeni projelerde ise, Nordex\u2019in Delta Generation ailesine ait, N100\/3300 ve N117\/3000 t\u00fcrbinleri kullan\u0131lacak. Serinin ilk projesi olan Band\u0131rma Geni\u015fletme II projesi (16,5MW) i\u00e7in Mart ay\u0131nda al\u0131nan sipari\u015fin ard\u0131ndan, bu y\u0131l sonuna kadar projenin tamamlanmas\u0131 bekleniyor.<br \/>\n\u0130zmir\u2019in Bergama il\u00e7esinde bulunan Bergama projesine yap\u0131lacak olan 30MW\u2019l\u0131k kapasite art\u0131r\u0131m\u0131 kapsam\u0131nda projenin Temmuz 2016\u2019da elektrik \u00fcretmeye ba\u015flamas\u0131 planlan\u0131yor. Yine 30MW kapasite art\u0131r\u0131m\u0131 yap\u0131lacak bir di\u011fer proje de Manisa\u2019da bulunan Soma RES projesi olacak. Bu projenin de Eyl\u00fcl 2016\u2019da tamamlanmas\u0131 bekleniyor. Sipari\u015fin son aya\u011f\u0131n\u0131, ikinci kez kapasite art\u0131r\u0131m\u0131 yap\u0131lacak olan Maz\u0131-III projesi olu\u015fturuyor. 27 MW\u2019l\u0131k bu geni\u015fletme projesinin de Kas\u0131m 2016\u2019da tamamlanmas\u0131 bekleniyor.<\/p>\n<p><span style=\"font-weight: bold; color: #222222;\"><br \/>\nT\u00fcrkiye enerjisinin y\u00fczde 1\u2019inden fazlas\u0131n\u0131 tek ba\u015f\u0131na yerli ve yenilenebilir kaynaklardan kar\u015f\u0131l\u0131yor<\/span><\/p>\n<p>25 senedir hidroelektrik ve r\u00fczgar enerjisi gibi yerli ve yenilenebilir kaynaklardan elektrik \u00fcretim tesisleri geli\u015ftirip, kurulumunu yap\u0131p i\u015fletmeye alan Bilgin Enerji, bug\u00fcn toplam 775 MW kurulu g\u00fcc\u00fcyle, T\u00fcrkiye enerjisinin y\u00fczde 1\u2019inden fazlas\u0131n\u0131 tek ba\u015f\u0131na yerli ve yenilenebilir kaynaklardan kar\u015f\u0131l\u0131yor. Bilgin Enerji, T\u00fcrkiye\u2019nin Lisansl\u0131 ilk Hidroelektrik Santralini (Hac\u0131lar HES \u2013 14 MW) ve R\u00fczgar Santralini (Band\u0131rma RES \u2013 30 MW) i\u015fletmeye ald\u0131. Halen i\u015fletmede 480MW Hidroelektrik santralinin yan\u0131 s\u0131ra, 295 MW da r\u00fczgar enerjisi santrali bulunan Bilgin Enerji, Nordex ile ger\u00e7ekle\u015ftirdi\u011fi bu anla\u015fma ile kurulu g\u00fcc\u00fcne 100MW daha ekleyerek 875MW\u2019a \u00e7\u0131karacak.<\/p>\n<p>Nordex ise T\u00fcrkiye\u2019de 2007 y\u0131l\u0131ndan beri y\u00fcr\u00fctt\u00fc\u011f\u00fc faaliyetlerini 2009 y\u0131l\u0131nda Istanbul\u2019da a\u00e7t\u0131\u011f\u0131 ofisi ile resmile\u015ftirmi\u015fti. Nordex Enerji A.\u015e. Eyl\u00fcl 2015 itibariyle, sat\u0131\u015f ekibinden proje y\u00f6netimi ekibine, i\u015f g\u00fcvenli\u011finden servis ekibine toplam 140\u2019ye yakla\u015fan T\u00fcrk\u00e7e konu\u015fan ekibi ile T\u00fcrkiye\u2019de b\u00fcy\u00fcmeye devam ediyor. Yak\u0131n d\u00f6nemde, N117\/3000 ve N117\/2400 t\u00fcrbinleri i\u00e7in tasarlanm\u0131\u015f olan NR58.5 kanatlar\u0131n T\u00fcrkiye\u2019de \u00fcretimine ba\u015flayan Nordex\u2019in kurulu g\u00fcc\u00fc 1GW\u2019a yakla\u015fm\u0131\u015f olup, bu kurulu g\u00fcc\u00fcn 265MW\u2019\u0131n\u0131 Bilgin Enerji\u2019ye ait r\u00fczgar santralleri olu\u015fturuyor.<\/p>\n<\/div>\n<div class=\"bottom_wrapper\" style=\"color: #666666;\">\u00a0Kaynak:AlternatifEnerji<\/div>\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Bilgin Enerji Yat\u0131r\u0131m Holding ve Alman r\u00fczgar t\u00fcrbini \u00fcreticisi Nordex kapasite art\u0131r\u0131m anla\u015fmas\u0131 imzalad\u0131. Bilgin Enerji Yat\u0131r\u0131m Holding ve Alman\u00a0r\u00fczgar t\u00fcrbini \u00fcreticisi\u00a0Nordex [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":47995,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,50],"tags":[24676,16],"views":1827,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/47994"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=47994"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/47994\/revisions"}],"predecessor-version":[{"id":47996,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/47994\/revisions\/47996"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/47995"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=47994"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=47994"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=47994"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}