{"id":47813,"date":"2015-12-12T14:49:38","date_gmt":"2015-12-12T11:49:38","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=47813"},"modified":"2015-12-12T14:49:38","modified_gmt":"2015-12-12T11:49:38","slug":"enerji-bakanligi-akkuyu-ngs-insaati-devam-ediyor","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/enerji-bakanligi-akkuyu-ngs-insaati-devam-ediyor\/","title":{"rendered":"(Turkish) Enerji Bakanl\u0131\u011f\u0131: \u201cAkkuyu NGS \u0130n\u015faat\u0131 Devam Ediyor!\u201d"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/47813\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Mersin Akkuyu N\u00fckleer Santrali Projesi\u2019nde sahadaki in\u015faat \u00e7al\u0131\u015fmalar\u0131n\u0131n devam etti\u011fi a\u00e7\u0131kland\u0131.<\/strong><\/p>\n<p>Konu hakk\u0131nda bilgi sahibi \u00fcst d\u00fczey kaynaklar, iki \u00fclke aras\u0131ndaki uluslararas\u0131 anla\u015fmada yer alan a\u011f\u0131r tazmina<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/12\/enerji-bakanligi-akkuyu-ngs-insaati-devam-ediyor.jpg\"><img loading=\"lazy\" class=\"alignright size-medium wp-image-47814\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/12\/enerji-bakanligi-akkuyu-ngs-insaati-devam-ediyor-300x165.jpg\" alt=\"enerji-bakanligi-akkuyu-ngs-insaati-devam-ediyor\" width=\"300\" height=\"165\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/12\/enerji-bakanligi-akkuyu-ngs-insaati-devam-ediyor-300x165.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/12\/enerji-bakanligi-akkuyu-ngs-insaati-devam-ediyor-500x276.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/12\/enerji-bakanligi-akkuyu-ngs-insaati-devam-ediyor-80x44.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/12\/enerji-bakanligi-akkuyu-ngs-insaati-devam-ediyor.jpg 696w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>t h\u00fck\u00fcmleri nedeniyle Rusya\u2019n\u0131n anla\u015fmay\u0131 fesihten ka\u00e7\u0131nd\u0131\u011f\u0131n\u0131 belirtiyorlar.<\/p>\n<p>T\u00fcrkiye ile Rusya aras\u0131ndaki mutabakat kapsam\u0131nda Rusya, d\u00f6rt \u00fcniteden olu\u015facak toplam 4,800 MW kurulu g\u00fcce sahip Akkuyu N\u00fckleer Santralini 20 milyar dolarl\u0131k yat\u0131r\u0131mla yapacak.<\/p>\n<p>Konu hakk\u0131nda bilgi sahibi \u00fcst d\u00fczey bir yetkili, \u201cRus jetinin d\u00fc\u015f\u00fcr\u00fclmesinden sonra proje b\u00fcy\u00fck bir belirsizli\u011fe girdi. Ancak Rus \u015firket projeye \u015fu ana kadar 3.5 milyardolar civar\u0131nda bir yat\u0131r\u0131m yapt\u0131. S\u00f6zle\u015fme h\u00fck\u00fcmlerinde tek tarafl\u0131 fesihte a\u011f\u0131r tazminat ko\u015fullar\u0131 var. O nedenle Ruslar \u015fu anda fesih konusunda ad\u0131m atam\u0131yor\u201d dedi.<\/p>\n<p>Enerji Bakanl\u0131\u011f\u0131 yetkilisi, n\u00fckleer santralin yap\u0131m\u0131n\u0131n ask\u0131ya ald\u0131\u011f\u0131 haberlerini yalanland\u0131.<\/p>\n<p>Kaynak: Enerji Enstit\u00fcs\u00fc<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Mersin Akkuyu N\u00fckleer Santrali Projesi\u2019nde sahadaki in\u015faat \u00e7al\u0131\u015fmalar\u0131n\u0131n devam etti\u011fi a\u00e7\u0131kland\u0131. Konu hakk\u0131nda bilgi sahibi \u00fcst d\u00fczey kaynaklar, iki \u00fclke aras\u0131ndaki uluslararas\u0131 anla\u015fmada [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":47814,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,43],"tags":[27412,22040,63,963,67,1009,2698,165,71,21,25580,23614,2973,885,846],"views":994,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/47813"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=47813"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/47813\/revisions"}],"predecessor-version":[{"id":47815,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/47813\/revisions\/47815"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/47814"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=47813"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=47813"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=47813"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}