{"id":47794,"date":"2015-12-12T14:19:16","date_gmt":"2015-12-12T11:19:16","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=47794"},"modified":"2015-12-12T14:19:16","modified_gmt":"2015-12-12T11:19:16","slug":"kasim-ayinda-elektrik-tuketimi-yuzde-12-artti","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/kasim-ayinda-elektrik-tuketimi-yuzde-12-artti\/","title":{"rendered":"(Turkish) Kas\u0131m Ay\u0131nda Elektrik T\u00fcketimi Y\u00fczde 1,2 Artt\u0131!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/47794\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>T\u00fcrkiye\u2019de kas\u0131mda elektrik t\u00fcketimi bir \u00f6nceki aya g\u00f6re y\u00fczde 1,2 art\u0131\u015f g\u00f6sterdi.<\/strong><\/p>\n<p>T\u00fcrkiye Elektrik \u0130letim A\u015e (TE\u0130A\u015e) verilerinden yap\u0131lan derlemeye g\u00f6re, T\u00fcrkiye\u2019de kas\u0131mda 21 bin 292,8 gig<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/12\/kasim-ayinda-elektrik-tuketimi-yuzde-12-artti.jpg\"><img loading=\"lazy\" class=\"alignleft wp-image-47795 size-medium\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/12\/kasim-ayinda-elektrik-tuketimi-yuzde-12-artti-300x165.jpg\" alt=\"kasim-ayinda-elektrik-tuketimi-yuzde-12-artti\" width=\"300\" height=\"165\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/12\/kasim-ayinda-elektrik-tuketimi-yuzde-12-artti-300x165.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/12\/kasim-ayinda-elektrik-tuketimi-yuzde-12-artti-500x276.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/12\/kasim-ayinda-elektrik-tuketimi-yuzde-12-artti-80x44.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/12\/kasim-ayinda-elektrik-tuketimi-yuzde-12-artti.jpg 696w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>avatsaat elektrik t\u00fcketildi. Bu rakam ekimde 21 bin 41,5 gigavatsaat olarak ger\u00e7ekle\u015fmi\u015fti. S\u00f6z konusu d\u00f6nemde t\u00fcketilen elektrik miktar\u0131, ekim ay\u0131na g\u00f6re y\u00fczde 1,2 artt\u0131.<\/p>\n<p>Bu y\u0131l\u0131n 11 ay\u0131nda ev ve i\u015f yerlerinde t\u00fcketilen elektrik miktar\u0131 ise ge\u00e7en y\u0131l\u0131n ayn\u0131 d\u00f6nemine g\u00f6re y\u00fczde 2,2 artarak 239 bin 876,5 gigavatsaat oldu. Ge\u00e7en y\u0131l sonu 69 bin 519,8 megavat seviyesinde bulunan kurulu g\u00fc\u00e7 ise, y\u00fczde 4 b\u00fcy\u00fcmeyle Kas\u0131m 2015 sonunda 72 bin 486,4 megavata ula\u015ft\u0131.<\/p>\n<p>Bu y\u0131l\u0131n 11 ay\u0131nda devreye al\u0131nan ve kurulu g\u00fcc\u00fc 2 bin 966 megavat\u0131 a\u015fan 284 yeni tesisle, toplam santral say\u0131s\u0131 bin 410\u2019a y\u00fckseldi.<\/p>\n<p>Kas\u0131m 2015 sonu itibar\u0131yla mevcut kurulu g\u00fcc\u00fcn\u00fcn y\u00fczde 34\u2019\u00fc hidrolik santraller, y\u00fczde 30,9\u2019u do\u011falgaz ve LNG kaynakl\u0131 santraller, y\u00fczde 12,3\u2019\u00fc yerli k\u00f6m\u00fcr ve linyit, y\u00fczde 8,7\u2019si ithal k\u00f6m\u00fcr, y\u00fczde 5,2\u2019si r\u00fczgar ve y\u00fczde 6,9\u2019u \u00e7ok yak\u0131tl\u0131 santrallerden sa\u011fland\u0131.<\/p>\n<p>Kaynak: Enerji Enstit\u00fcs\u00fc<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.T\u00fcrkiye\u2019de kas\u0131mda elektrik t\u00fcketimi bir \u00f6nceki aya g\u00f6re y\u00fczde 1,2 art\u0131\u015f g\u00f6sterdi. T\u00fcrkiye Elektrik \u0130letim A\u015e (TE\u0130A\u015e) verilerinden yap\u0131lan derlemeye g\u00f6re, T\u00fcrkiye\u2019de kas\u0131mda [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":47795,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53],"tags":[68,61,19638,2495,2873,130,63,67,1009,2698,165,1582,3479],"views":527,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/47794"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=47794"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/47794\/revisions"}],"predecessor-version":[{"id":47796,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/47794\/revisions\/47796"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/47795"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=47794"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=47794"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=47794"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}