{"id":47490,"date":"2015-12-06T00:25:29","date_gmt":"2015-12-05T21:25:29","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=47490"},"modified":"2015-12-06T00:25:29","modified_gmt":"2015-12-05T21:25:29","slug":"csun-panelleri-yerli-uretim-destegi-sagliyor","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/csun-panelleri-yerli-uretim-destegi-sagliyor\/","title":{"rendered":"(Turkish) CSUN Panelleri, Yerli \u00dcretim Deste\u011fi Sa\u011fl\u0131yor&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/47490\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>G\u00fcne\u015f h\u00fccreleri ve panelleri \u00fcretiminde faaliyet g\u00f6steren ve sekt\u00f6r\u00fcn global oyuncular\u0131ndan biri olan CSUN, T\u00fcrkiye\u2019de \u00fcretti\u011fi g\u00fcne\u015f panelleriyle GES projelerine yerli \u00fcretim deste\u011fi sa\u011fl\u0131yor. Yerli \u00fcretim deste\u011fi alarak ilk proje olma \u00f6zelli\u011fi ta\u015f\u0131yan Ekinler GES, CSUN ve Ekinler-Eurosol i\u015fbirli\u011fi ile Manisa\u2019da hayata ge\u00e7ti. 252 KWp kapasiyete sahip proje, \u00f6zt\u00fcketim modeliyle kurumun kendi elektrik ihtiyac\u0131n\u0131 kar\u015f\u0131layacak.<\/strong><\/p>\n<p>2013\u2019ten beri T\u00fcrkiye\u2019de faaliyet<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/12\/csun-panelleri-yerli-uretim-destegi-sagliyor.jpg\"><img loading=\"lazy\" class=\"alignleft  wp-image-47491\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/12\/csun-panelleri-yerli-uretim-destegi-sagliyor-300x110.jpg\" alt=\"csun-panelleri-yerli-uretim-destegi-sagliyor\" width=\"300\" height=\"174\" \/><\/a> g\u00f6steren CSUN, Ekinler-Eurosol i\u015fbirli\u011fi ile T\u00fcrkiye\u2019de bir ilke daha imza att\u0131. Manisa\u2019da hayata ge\u00e7irilen Ekinler GES projesi YEGM taraf\u0131ndan ald\u0131\u011f\u0131 yerli \u00fcretim deste\u011fi ile T\u00fcrkiye\u2019de ilk olma \u00f6zelli\u011fini ta\u015f\u0131yor. Organize Sanayi B\u00f6lgesi\u2019nde kurulan 252 kWp kapasiteli \u00e7at\u0131 sisteminin 60 kWp\u2019\u0131nda, T\u00fcrkiye\u2019de \u00fcretilen CSUN g\u00fcne\u015f panelleri kullan\u0131ld\u0131.<\/p>\n<p><strong>CSUN yerli panellerinin kullan\u0131ld\u0131\u011f\u0131 projelerde yat\u0131r\u0131mc\u0131lar, devlete satt\u0131\u011f\u0131 elektri\u011fi 5 y\u0131l i\u00e7in y\u00fcksek fiyattan satarak daha fazla k\u00e2r elde edebiliyor.<\/strong><\/p>\n<p>CSUN T\u00fcrkiye Orta\u011f\u0131 Egemen Seymen,<strong> \u201c<\/strong>Yerli te\u015fvikle alakal\u0131 birka\u00e7 y\u0131ld\u0131r s\u00fcregelen yo\u011fun bir \u00e7al\u0131\u015fmam\u0131z vard\u0131 ve bu \u00e7al\u0131\u015fmalar meyvesini verdi. Yenilenebilir Enerji Genel M\u00fcd\u00fcrl\u00fc\u011f\u00fc&#8217;nden (YEGM) 18.11.2015 tarihi itibar\u0131yla Ekinler GES projesine onay verildi. CSUN olarak iyi bir pazar pay\u0131\u00a0alaca\u011f\u0131m\u0131za inan\u0131yorum.\u201d dedi.<\/p>\n<p><span style=\"text-decoration: underline;\"><strong>CSUN Hakk\u0131nda:<\/strong><\/span><\/p>\n<p><strong>China Sunergy (Nasdaq:CSUN)<\/strong>\u00a02004 y\u0131l\u0131nda \u00c7in&#8217;in ilk g\u00fcne\u015f h\u00fccresi fabrikas\u0131 olarak kurulmu\u015ftur. Y\u0131ll\u0131k 3 GW&#8217;\u0131n \u00fczerindeki \u00fcretim kapasitesi ile d\u00fcnyan\u0131n say\u0131l\u0131 g\u00fcne\u015f paneli \u00fcreticilerinden biri\u00a0olan\u00a0<strong>CSUN<\/strong>,\u00a0<strong>Seul Holding\u00a0<\/strong>b\u00fcnyesindeki<strong>\u00a0Seul Enerji<\/strong>\u00a0ile birlikte\u00a0\u0130stanbul Tuzla&#8217;da 350 MW kapasiteli\u00a0<strong>T\u00fcrkiye&#8217;nin ilk g\u00fcne\u015f h\u00fccresi ve en b\u00fcy\u00fck g\u00fcne\u015f paneli tesisini<\/strong>\u00a0faaliyete ge\u00e7irmi\u015ftir.<\/p>\n<p>Panel sipari\u015fleriniz i\u00e7in\u00a0<a href=\"mailto:salestr@csun-solar.com\">salestr@csun-solar.com<\/a>\u00a0adresinden sat\u0131\u015f ekibimiz ile irtibata ge\u00e7ebilirsiniz.<\/p>\n<p>Daha detayl\u0131 bilgi i\u00e7in l\u00fctfen internet sitemizi ziyaret edin.\u00a0<a href=\"http:\/\/csun-solar.us9.list-manage.com\/track\/click?u=ade3a976ca46cc28d2b947991&amp;id=fd358aa697&amp;e=343870bcae\">http:\/\/www.csun-solar.com<\/a><\/p>\n<p>Kaynak: B\u00fcltenler<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.G\u00fcne\u015f h\u00fccreleri ve panelleri \u00fcretiminde faaliyet g\u00f6steren ve sekt\u00f6r\u00fcn global oyuncular\u0131ndan biri olan CSUN, T\u00fcrkiye\u2019de \u00fcretti\u011fi g\u00fcne\u015f panelleriyle GES projelerine yerli \u00fcretim deste\u011fi [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":47491,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49],"tags":[3871,27247,5502,27245,27246,63,67,1009,2698,165,20026,227,13,2569,23133,24163,27243,1657,108,22975,4269,2191,1636,2168,27248,27244],"views":1274,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/47490"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=47490"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/47490\/revisions"}],"predecessor-version":[{"id":47492,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/47490\/revisions\/47492"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/47491"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=47490"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=47490"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=47490"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}