{"id":47389,"date":"2015-12-03T17:48:40","date_gmt":"2015-12-03T14:48:40","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=47389"},"modified":"2015-12-03T19:48:44","modified_gmt":"2015-12-03T16:48:44","slug":"anel-elektrikin-rusyadaki-anlasmasi-iptal-edildi-2","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/anel-elektrikin-rusyadaki-anlasmasi-iptal-edildi-2\/","title":{"rendered":"(Turkish) Anel Elektrik\u2019in Rusya\u2019daki Anla\u015fmas\u0131 \u0130ptal Edildi&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/47389\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<p style=\"color: #0a0a0a;\"><strong>Anel Elektrik Proje Taahh\u00fct ve Ticaret A.\u015e.\u2019nin, Moskova\u2019da VTB Arena Stad\u0131 projesindeki s\u00f6zle\u015fmesi sonland\u0131r\u0131ld\u0131.<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/12\/central-dynamo-stadium-320983-696x385.jpg\"><img loading=\"lazy\" class=\"alignright size-medium wp-image-47385\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/12\/central-dynamo-stadium-320983-696x385-300x165.jpg\" alt=\"central-dynamo-stadium-320983-696x385\" width=\"300\" height=\"165\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/12\/central-dynamo-stadium-320983-696x385-300x165.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/12\/central-dynamo-stadium-320983-696x385-500x276.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/12\/central-dynamo-stadium-320983-696x385-80x44.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/12\/central-dynamo-stadium-320983-696x385.jpg 696w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><span id=\"more-74422\"><\/span><\/strong><\/p>\n<p style=\"color: #0a0a0a;\">Moskova\u2019da VTB Arena \u2013 Central Dynamo Stad\u0131 projesinin al\u00e7ak gerilim, zay\u0131f ak\u0131m ve yang\u0131n alarm sistemleri i\u015flerinin yap\u0131m\u0131 konusunda, ana y\u00fcklenici Codest International S.R.L. ile Anel Elektrik aras\u0131nda 28.08.2015 tarihinde imzalanan, 29 milyon 630 bin euro tutar\u0131ndaki \u00f6n anla\u015fma sonras\u0131, ana s\u00f6zle\u015fmenin imzalanmas\u0131 i\u00e7in yap\u0131lan g\u00f6r\u00fc\u015fmeler iptal edildi.<\/p>\n<p style=\"color: #0a0a0a;\">\u015eirketin, Kamu Ayd\u0131nlatma Platformu\u2019na (KAP) yapt\u0131\u011f\u0131 a\u00e7\u0131klamada projenin g\u00fcncel geli\u015fmeler nedeniyle ana y\u00fcklenici taraf\u0131ndan sonland\u0131r\u0131ld\u0131\u011f\u0131 belirtildi.<\/p>\n<p style=\"color: #0a0a0a;\">S\u00f6z konusu a\u00e7\u0131klamada ayr\u0131ca, \u015firketin bu i\u015f ile ilgili bir teminat mektubu veya benzeri bir taahh\u00fct vermedi\u011fi ifadesine de yer verildi.<\/p>\n<p style=\"color: #0a0a0a;\">Kaynak:EnerjiEnstit\u00fcs\u00fc<\/p>\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Anel Elektrik Proje Taahh\u00fct ve Ticaret A.\u015e.\u2019nin, Moskova\u2019da VTB Arena Stad\u0131 projesindeki s\u00f6zle\u015fmesi sonland\u0131r\u0131ld\u0131. Moskova\u2019da VTB Arena \u2013 Central Dynamo Stad\u0131 projesinin [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":47388,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53],"tags":[92,1451,63,24324,3136,1009,103,13,21,59,69,105],"views":1060,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/47389"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=47389"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/47389\/revisions"}],"predecessor-version":[{"id":47390,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/47389\/revisions\/47390"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/47388"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=47389"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=47389"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=47389"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}