{"id":47187,"date":"2015-11-28T23:38:38","date_gmt":"2015-11-28T20:38:38","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=47187"},"modified":"2015-11-28T23:40:49","modified_gmt":"2015-11-28T20:40:49","slug":"urfaya-10-megawattlik-gunes-enerjisi-santrali-ges-kurulumu","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/urfaya-10-megawattlik-gunes-enerjisi-santrali-ges-kurulumu\/","title":{"rendered":"(Turkish) Urfa\u2019ya 10 Megawattl\u0131k G\u00fcne\u015f Enerjisi Santrali (GES)&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/47187\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Mars Solar Enerji, \u015eanl\u0131urfa`da 10 megawatt g\u00fcc\u00fcnde G\u00fcne\u015f Enerjisi Santrali kurma<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/11\/urfaya-10-megawattlik-gunes-enerjisi-santrali-ges-kurulumu.jpg\"><img loading=\"lazy\" class=\"alignright  wp-image-47188\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/11\/urfaya-10-megawattlik-gunes-enerjisi-santrali-ges-kurulumu-300x110.jpg\" alt=\"urfaya-10-megawattlik-gunes-enerjisi-santrali-ges-kurulumu\" width=\"287\" height=\"190\" \/><\/a>y\u0131 planl\u0131yor.<\/strong><\/p>\n<p>T\u00fcrkiye\u2019nin <strong>g\u00fcne\u015f enerjisinde <\/strong>kurulu g\u00fcc\u00fcn\u00fc art\u0131rma \u00e7al\u0131\u015fmalar\u0131 s\u00fcr\u00fcyor. Bu konuda \u00f6zel sekt\u00f6r \u00e7al\u0131\u015fmalar\u0131n\u0131 h\u0131zland\u0131rm\u0131\u015f durumda.<\/p>\n<p>Mars Solar Enerji \u00dcretim ve Ticaret Limited \u015eirketi taraf\u0131ndan \u015eanl\u0131urfa \u0130li, Viran\u015fehir \u0130l\u00e7esi, Alakonak K\u00f6y\u00fc Mevkiinde 164.934,66 m2`lik alanda 9,99 MW g\u00fcc\u00fcnde G\u00fcne\u015f Enerjisi Santrali kurulmas\u0131 planlan\u0131yor.<\/p>\n<p>MW ba\u015f\u0131na 940.000 TL bedelli proje kapsam\u0131nda her biri 1 MW olan A, B, C, D, E, F, G, H, J b\u00f6l\u00fcmlerine ve biride 0,99 MW olan K b\u00f6l\u00fcm\u00fcne paneller yerle\u015ftirilecek.<\/p>\n<p>Haberin devam\u0131 i\u00e7in <a href=\"http:\/\/enerjigunlugu.net\/urfaya-10-mwlik-ges_16190.html#.Vlg_KV7-m1s\" target=\"_blank\" rel=\"nofollow\">t\u0131klay\u0131n&gt;&gt;&gt;<\/a><\/p>\n<p>Kaynak: Enerji G\u00fcnl\u00fc\u011f\u00fc<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Mars Solar Enerji, \u015eanl\u0131urfa`da 10 megawatt g\u00fcc\u00fcnde G\u00fcne\u015f Enerjisi Santrali kurmay\u0131 planl\u0131yor. T\u00fcrkiye\u2019nin g\u00fcne\u015f enerjisinde kurulu g\u00fcc\u00fcn\u00fc art\u0131rma \u00e7al\u0131\u015fmalar\u0131 s\u00fcr\u00fcyor. Bu konuda \u00f6zel [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":47188,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49],"tags":[63,67,1009,2698,165,2326,21886,227,13,2569,21768,23133,2401,26059,4269,2441],"views":2736,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/47187"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=47187"}],"version-history":[{"count":2,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/47187\/revisions"}],"predecessor-version":[{"id":47191,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/47187\/revisions\/47191"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/47188"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=47187"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=47187"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=47187"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}