{"id":46948,"date":"2015-11-22T19:58:15","date_gmt":"2015-11-22T16:58:15","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=46948"},"modified":"2015-11-22T19:58:15","modified_gmt":"2015-11-22T16:58:15","slug":"elektrigin-yuzde-5i-gunesten-karsilanacak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/elektrigin-yuzde-5i-gunesten-karsilanacak\/","title":{"rendered":"(Turkish) &#8217;Elektri\u011fin Y\u00fczde 5&#8217;i G\u00fcne\u015ften Kar\u015f\u0131lanacak!'"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/46948\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Bilim, Sanayi ve Teknoloji Bakan\u0131 I\u015f\u0131k, Karaman ve Van&#8217;daki enerji ihtisas b\u00f6lgelerinin de hayata ge\u00e7mesiyle T\u00fcrkiye&#8217;nin elektrik t\u00fcketiminin y\u00fczde 5&#8217;inin g\u00fcne\u015ften elde edilebilece\u011fini s\u00f6yledi.<\/strong><\/p>\n<p>Ni\u011fde&#8217;nin Bor il\u00e7esindeki baz\u0131 alanlar\u0131n Ni\u011fde-Bor Enerji \u0130htisas End\u00fcstri B\u00f6lgesi olarak ilan edilmesine ili\u015fkin Bakanlar Kurulu karar\u0131, Resmi Ga<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/11\/elektrigin-yuzde-5i-gunesten-karsilanacak.jpg\"><img loading=\"lazy\" class=\"alignleft  wp-image-46949\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/11\/elektrigin-yuzde-5i-gunesten-karsilanacak-300x153.jpg\" alt=\"elektrigin-yuzde-5i-gunesten-karsilanacak\" width=\"300\" height=\"202\" \/><\/a>zete&#8217;de yay\u0131mlanarak, y\u00fcr\u00fcrl\u00fc\u011fe girdi. Bu kararla, Bor il\u00e7esi, T\u00fcrkiye&#8217;nin 2. enerji ihtisas end\u00fcstri b\u00f6lgesi oldu.<\/p>\n<p>Bilim, Sanayi ve Teknoloji Bakan\u0131 Fikri I\u015f\u0131k, konuya ili\u015fkin, T\u00fcrkiye&#8217;nin g\u00fcne\u015f enerjisi potansiyeli incelendi\u011finde, bu alanda yat\u0131r\u0131m yapm\u0131\u015f bir \u00e7ok \u00fclkeye g\u00f6re daha avantajl\u0131 bir b\u00f6lgede yer ald\u0131\u011f\u0131n\u0131 s\u00f6yledi.<\/p>\n<p>Bu avantaj\u0131 en iyi \u015fekilde de\u011ferlendirmek istediklerini vurgulayan I\u015f\u0131k, \u015funlar\u0131 kaydetti:<\/p>\n<p>&#8220;Konya Karap\u0131nar&#8217;\u0131n ard\u0131ndan T\u00fcrkiye&#8217;nin 2. enerji ihtisas b\u00f6lgesini Ni\u011fde&#8217;nin Bor il\u00e7esinde kuruyoruz. 2 bin 539 hektar b\u00fcy\u00fckl\u00fc\u011f\u00fcndeki b\u00f6lgede t\u00fcm arazilerin yat\u0131r\u0131mc\u0131lara tahsis edilmesi durumunda 1.300-1.500 megavat kurulu g\u00fc\u00e7 kapasitesine sahip g\u00fcne\u015f enerjisi santrali kurulabilecek ve bu santraller taraf\u0131ndan 2-2,4 milyar kilovatsaat elektrik \u00fcretimi ger\u00e7ekle\u015febilecek. B\u00f6lgenin tam kapasite ile faaliyete ge\u00e7mesi halinde 1,3-1,5 milyar avroluk yat\u0131r\u0131m ger\u00e7ekle\u015fmesini bekliyoruz.<\/p>\n<p>\u00d6te yandan, ileriki aylarda i\u015flemlerini tamamlamay\u0131 hedefledi\u011fimiz Karaman ve Van&#8217;daki enerji ihtisas b\u00f6lgelerinin de hayata ge\u00e7mesiyle g\u00fcn\u00fcm\u00fcz rakamlar\u0131yla bak\u0131ld\u0131\u011f\u0131nda T\u00fcrkiye&#8217;nin elektrik t\u00fcketiminin y\u00fczde 5&#8217;i g\u00fcne\u015ften elde edilebilecek.&#8221;<\/p>\n<p>Kaynak: AA<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Bilim, Sanayi ve Teknoloji Bakan\u0131 I\u015f\u0131k, Karaman ve Van&#8217;daki enerji ihtisas b\u00f6lgelerinin de hayata ge\u00e7mesiyle T\u00fcrkiye&#8217;nin elektrik t\u00fcketiminin y\u00fczde 5&#8217;inin g\u00fcne\u015ften elde edilebilece\u011fini [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":46949,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49],"tags":[63,67,1009,4536,2698,165,2326,227,13,2569,23133,22975,4269,4899],"views":1034,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/46948"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=46948"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/46948\/revisions"}],"predecessor-version":[{"id":46950,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/46948\/revisions\/46950"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/46949"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=46948"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=46948"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=46948"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}